Selta Mktr Successstories

Embed Size (px)

Citation preview

  • 8/19/2019 Selta Mktr Successstories

    1/23

    Telecontrol Centres

    Power plants, Hydro, Wind, FV

    Transmission and Distribution Networks

    Success Stories 

  • 8/19/2019 Selta Mktr Successstories

    2/23

    E.ON Italia Telecontrol Centre 

    Supervision and remote control of thermal power

    stations, hydroelectric and wind power plants of

    E.ON Italia.

    19 hydro, 11 mini-hydro, 5 thermal , 4 wind

    power plant, reaching a total number of 75

    power units managed by the EMS system

    Remote management and regulation of the

    plants based on production schedules provided

    by GSE (Gestore dei Servizi Elettrici).

  • 8/19/2019 Selta Mktr Successstories

    3/23

  • 8/19/2019 Selta Mktr Successstories

    4/23

    E.ON Telecontrol Centre 

    HMI and Video Wall

    SCADA

    EMS

    HistorianDisaster recovery

    I/O Data set

    10000 Digital Input 2500 Digital Output 2500 Analog Input 4000 Analog Output.

  • 8/19/2019 Selta Mktr Successstories

    5/23

    ENI GAS & POWERTelecontrol centre 

    Monitoring and remote control of the gas pipeline that connects Feriana (boundarywith Algeria) to Capo Bon (start point of TRANSMED’s Mediterranean part) and

    connected pumping stations.

    s.d.i. supply includes control room at centre, 3 DCS, 5 gateway RTU to interface DCS

    in the pumping stations, 37 pipeline RTU

  • 8/19/2019 Selta Mktr Successstories

    6/23

  • 8/19/2019 Selta Mktr Successstories

    7/23

    ENI GAS & POWER

    TRANSMED Telecontrol Centre 

    HMI and Video Wall

    SCADA

    Historian

    Engineering Workstation

    Disaster recovery

    Remote Web HMI

    42 iSC RTUs (s.d.i.)

    I/O Data Set

    6384 Digital Input 1024 Digital Output 1200 Analog Input

  • 8/19/2019 Selta Mktr Successstories

    8/23

    STOGIT Gas Storage

    Telecontrol Centre 

    Monitoring and remote control of the 8 storage

    plants managed by STOGIT. In each site there are

    a compression plant and a treatment plant.

    Primary and disaster recovery centers. In each

    center the user stations can take control of the

    remote-controlled sites.

    8 Front End devices supplied by s.d.i. interface

    DCS in the plants via OPC and MODBUS standard

    and/or third part protocols.

  • 8/19/2019 Selta Mktr Successstories

    9/23

  • 8/19/2019 Selta Mktr Successstories

    10/23

    STOGIT Telecontrol Centre 

    STOGIT stores natural gas into sites formerly dedicated

    to production.

    The system coordinates and integrates each site storage

    capacity into the overall storage system.

    At each time the overall storage control system selects

    which plant has to be involved as storage or supply in

    order to ensure adequate gas level basing on

    programmed schedule.

  • 8/19/2019 Selta Mktr Successstories

    11/23

    STOGIT Telecontrol Centre 

    Disaster Recovery Center of Sergnano  System platform is equipped with a videowall to

    share the plant status.

    The dynamic process database is centralized in

    the SCADA systems (each one in redundant withhot-backup configuration) and historical data are

    stored in the storage station that supports an

    Oracle Server (also in redundant configuration).

    Communication with remote storage facilities (via

    FEP) is based on IEC 60870-5-104 standard.

  • 8/19/2019 Selta Mktr Successstories

    12/23

    STOGIT Telecontrol Centre 

    HMI Multi Monitor User Interface (16 monitor)

    Redundant SCADA

    Historian Oracle Based

    Disaster Recovery

    Front End Based Architecture (8 different Front End)

    I/O Data set

    25000 Digital Input 10000 Digital Output 10000 Analog Input 3000 Analog Output.

  • 8/19/2019 Selta Mktr Successstories

    13/23

    A2A Hydro Power Telecontrol Centre 

    Monitoring and remote control of the 7 hydro

    power plants in Valtellina: Grosio, Grosotto,

    Lovero, Stazzona, Premadio,Braulio, S.Giacomo

    for a total installed power of 772 MW.

    Integrated SOE (Sequence of Events) of all plants.

    Control of energy transmission and load

    partitioning.

  • 8/19/2019 Selta Mktr Successstories

    14/23

  • 8/19/2019 Selta Mktr Successstories

    15/23

    A2A Hydro Telecontrol Centre 

    Control Centre in Grosio and remote production

    planning and management of energy flow from

    Milan Offices.

    I/O Servers for the management over dedicatedtelecontrol lines using proprietary protocols over

    power lines.

    I/O Server for standard IEC 60870-5-101serial

    protocol over dedicated lines.

  • 8/19/2019 Selta Mktr Successstories

    16/23

    A2A Telecontrol Centre 

    HMI Distributed User Interface

    Remote planning station in Milan

    Redundant SCADA

    Historian Oracle BasedMultiple different protocols I/O Servers

    I/O Data set

    10000 Digital Input 2048 Digital Output 1200 Analog Input 256 Analog Output.

  • 8/19/2019 Selta Mktr Successstories

    17/23

    TERNA HV Substation Automation and

    Telecontrol Gateway (SAS Station Computer) 

    High Voltage Substation Automation for several

    (22 until now) TERNA substations in Italy.

    The system has been one of the first complete

    application of the IEC61850 protocol and system

    configuration standard.

    The IEC standard is used in LAN communication,

    connecting to SCADA the Bay Control Unit (BCU) e

    Bay Monitoring Unit (BMU) and Bay Protection

    Unit (BPU).

    The gateway function provides the connection to

    remote TERNA telecontrol centers; the protocol

    used is IEC 61870-5-104.

    Using the gateway function the station can be

    completely controlled from the TERNA CTI

    (Telecontrol Centre).

  • 8/19/2019 Selta Mktr Successstories

    18/23

  • 8/19/2019 Selta Mktr Successstories

    19/23

  • 8/19/2019 Selta Mktr Successstories

    20/23

    TERNA SAS StationComputer 

    Local HMI and Engineering Workstation

    SCADA

    Operating Sequences Automation

    Client IEC 61850SNMP LAN and Servers diagnostics

    Telecontrol Gateway IEC 60870-5-104

    SOE Lists and Perturbance Recording

    I/O Data Set depending on number of station’s BAY

  • 8/19/2019 Selta Mktr Successstories

    21/23

    1

    Wind Farms and FV Power 

    GAVAZZI IMPIANTI 

    RTU and SCADA gateways for 10

    fotovoltaic power plants and power

    stations

    TERNA remotely controlled plants in

    northern part of Italy 

    GAVAZZI IMPIANTIRTU and SCADA for the wind farm and

    the power station

    Parco Eolico La Miniera (Montecatini

    val di Cecina)

    ENEL GREEN POWER  RTU and SCADA gateway for 4 windand 15 fotovoltaic power plants

    Italy and Romania 

  • 8/19/2019 Selta Mktr Successstories

    22/23

    Wind Farm Montecatini Val di Cecina

  • 8/19/2019 Selta Mktr Successstories

    23/23

    Wind Farm Montecatini Val di Cecina

    Local HMI and Engineering Workstation

    3 Web Enabled Remote HMI

    Redundant SCADA

    1 RTU STAR Station for HV/MV substation Control

    Remote Alarming (Vocal Alarm Messaging)

    I/O Data set

    832 Digital Input 62 Digital Output 232 Analog Input 24 Analog Output.