16
Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project Section VII. Technical Specifications DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City » DND TWG - 4212202; BAC Secretariat - 4213531 96

Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Section VII. Technical Specifications

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City» DND TWG - 4212202; BAC Secretariat - 4213531

96

Page 2: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

STATEMENT OF COMPLIANCE TO TECHNICAL SPECIFICATIONS

The bidder m ust state in the last column opposite each parameter and required specifications either “Comply” or “Not Comply1’. All pages shall be properly signed. Bidders m ust state here either “Comply” or “Not Comply” against each of the individual param eters of each Specification stating the corresponding performance parameter of the equipment offered. Statements of “Comply” or “Not Comply” m ust be supported by evidence in a Bidders Bid and cross- referenced to that evidence. Evidence shall be in the form of m anufacturer’s u n ­amended sales literature, unconditional statem ents of specification and compliance issued by the manufacturer, samples, independent test data etc., as appropriate. A statem ent tha t is not supported by evidence or is subsequently found to be contradicted by the evidence presented will render the Bid under evaluation liable for rejection. A statement either in the Bidders statement of compliance or the supporting evidence that is found to be false either during Bid evaluation, post-qualification or the execution of the Contract may be regarded as fraudulent and render the Bidder or supplier liable for prosecution subject to the provisions of ITB Clause above goods manufactured by us.

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityS DND TWO - 4212202; BAC Secretarial - 4213531

97

Page 3: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Technical Specifications

1. BASELINE REQUIREMENT

Item S p ecifica tion s C om ply/N otCom ply

1. CAS Aircraft S ix (6) u n its- B rand New

- “B rand N ew m eans condition o f an item w herein it is conspicuously new, u n u sed and fr e s h from the m anufacturer. (Air Force Dictionary, First Edition, 2003)”

- Factory New“Factory N ew (FN) are material supplies w hich have been m anufactured w ithin the last two (2) years, have been properly preserved and have traceability to the original m anufacturer as accom panied by a certificate o f “Original Equipm ent M anufacturer” (OEM), show ing p ro o f o f the d a te o f m anufacture and assu res that m aterial subm itted have been inspected by duly qualified inspection facility and test results m ay be requested fo r review. (Air Force Dictionary, First Edition, 2003)”

- Fully aerobatic

- R etractab le Landing G ears

- Inad v erten t In s tru m en t M eteorological Condition(IIMC) C apable

- In s tru m e n t Flight R ules (IFR) C apable

a) C ruising Speed - M inim um two h u n d red tw enty (220) k n o ts indicated a irspeed (KIAS).

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City® DND TWG - 4212202; BAC Secretariat - 4213531

98

Page 4: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition Project

Item S p ecifica tion s C om p ly / Not Com ply

b) E n d u ran ce - M inim um of two h o u rs an d th irty m in u tes (2+30) a t arm ed configuration an d norm al cru ising speed; (w /o auxiliary tanks).

c) Seating C onfiguration - D ual T andem seating

d) Payload - Min Payload: th ree th o u san d (3,000) lbs;

- At leas t five (5) h a rd points,- W ith a t leas t six h u n d red (600)

lbs capacity in each of the h a rd points

e) Service ceiling - At leas t tw enty five th o u san d (25,000) feet

f) Short Take-off an d Landing (STOL)

- M axim um of th ree th o u san d (3,000) m e te rs / n ine th o u san d eight h u n d re d forty two (9,842) feet take-off an d land ing roll a t M axim um G ross Take-off W eight (MTOW)

2. Power P lant S ystem - B rand New T urb ine Engine(s)

- Time B etw een O verhau ls (TBO) of a t leas t th ree th o u san d (3,000) flight h o u rs

- O perating lim its su itab le for tropical cou n try operation (operates effectively in hot, hum id 8s high a ltitu d e environm ents)

- R e-sta rt ability w ithin fifteen (15) m in u tes after shu tdow n

3 .W eapons/A rm am ent S ystem

- C apable for Day & Night Fighting- C apable of a irm unition mix

loading

- W ith two (2) .50 Cal g uns (pods or built-in)

4. A vion ics S y stem - C om patible or be tte r w ith cu rre n t d a ta b u s MIL-STD 1553*

* A military standard published by the United States Department of Defense that defines the mechanical, electrical, and functional characteristics of a serial data bus. It was originally designed for use with military avionics, but has also become commonly used in spacecraft on-board data handling (OBDH) subsystemst both military and civil It features a dual redundant balanced line physical layer, a (differential) network interface, time diirision multiplexing, half-duplex command/response protocol, and up to 31 remote terminals (devices).Military aircrafts utilize MIL-STD-1553 data buses, which allow complex electronic subsystems to interact with each other and the on-board flight computer. This is the military data bus of the aircraft. The data bus products function as the interface between the sub­system electronics and the 1553 data bus.

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityW DND TWG - 4212202; BAC Secretariat - 4213531

cf* 99

Page 5: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n s C om ply /N ot Com ply

a. F light In s tru m en ts : - E quipped for Day V isual Flight R ules (DVFR), Night V isual Flight R ules (NVFR) a n d In s tru m en t Flight R ules (IFR)

(1) F light In s tru m e n ts - E lectronic Flight In s tru m e n ts (EFI) for a ltitude , a ttitu d e , a irspeed and bearing (front an d re a r cockpit)

- M ust be b ran d new a n d calibrated an d can su s ta in h igh G forces (-3 to +7 Gs)

(2) H ead Up D isplay (HUD)

- W ith in teg ra ted flight perform ance, navigation, an d w eapons targeting a n d delivery on the p ilot’s Field of View (FOV) in day an d n igh t env ironm ents

(3) M ulti-Function D isplay (MFD)

- M inim um of two (2) installed d isp lays m easu rin g a t leas t 5x7 inches show ing the a irc ra ft flight perform ance, navigation, targeting an d tactical m ission system disp lay (front a n d rea r cockpit)

(4) H ands-O n T hrottle And Stick (HOTAS)

- Full H ands-O n Throttle And S tick technology (both fron t an d rea r cockpit)

b. Navigation E quipm ent: - B asic for IFR flights

- M ust be b ra n d new a n d calib rated an d can su s ta in h igh G forces (-3 to +7 Gs)

(1) Global Positioning S y stem / Inertia l Navigation System (GPS/INS)

- Lin ea r/A n g u la r Acceleration, Velocity, Position, A ttitude, M agnetic an d T rue Heading, A ltitude, Time Tag an d S teering D ata

(2) Digital Moving M ap (DMM)

- C om patible w ith Night Vision Goggles (NVG) a n d h a s scaled m ap s of Asia Pacific Region

(3) VOR/ILS - At leas t one (1) u n it

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City© DND TWG - 4212202: BAC Secretariat - 4213531

Page 6: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ecifica tion s C om ply/ Not Com ply

(4) IFF T ransponder - At leas t one (1) u n it

- Identification inform ation is provided in m odes 1, 2, 3 / A, C, 4 an d S

(5) TACAN or Bearing an d Range Inform ation E qu ipm ent

- B earing an d Range determ ination (Air-to-air an d air-to -ground mode)

- A ir-to-air m ode to track the position of w ingm en in form ation flights

- V isual d isp lay of the position of th e o th er a irc ra ft in flight

c. C om m unication E au inm ent:

- C om patib le /in te roperab le w ith the existing AFP com m unications equ ipm ent in p lain a n d /o r secure m ode

(1) M ulti B and- Cover a t leas t the frequency range

of 2 .000 to 300 MHz, capable of tw enty (20) p re -se t ch an n e ls

(2) VHF-FM: - 30 .00 to 75 .95 MHz

(3) VHF-AM - 108.000 to 137.00 MHz

(4) UHF- Covers a t leas t the frequency

range of 225 .00 to 399 .00 MHz

5. Aircraft L ighting S ystem

- NVG Com patible In terior 85 Exterior Lightings

- D ual m ode (s tandard lightings and NVG flight mode)

6. Fire C ontrol S ystem - C om patible or b e tte r w ith c u rre n t d a ta b u s MIL-STD 1553

- C apable of Air to Air & Air to G round m odes

- E quipped w ith EO /IR capable of Forw ard Looking Infra Red (FLIR), Im aging, an d targeting System (with Laser designator an d rangefinder), NVG com patible, in terfaced w ith the a irc ra ft’s w eapon system . EO /IR m u st have b u t no t lim ited to the following:

• Lightweight high stiffness composite body

DND Bids and Awards Committee, Department of NationaJ Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityW DND TWO - 4212202; BAC Secretariat - 4213531

101

Page 7: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n s C om ply/ Not Com ply

• With four axis active stabilization• FOV of at least 26° to 0.35°• Thermal imager with wavelength

of at least 3-5|am response• Daylight color camera with at

least 26x zoom (FOV matched to IR)

• Thermal imager with magnification ratio of at least 96x

• With at least but not limited to the following options: Laser Spot Tracker, N avigation / Radar Interfaces, Displays & Recorders, Moving Map Systems, Digital Video Output

• With laser options compatible with existing PAF munitions

7. Airframe - Certified crashw orthy

- C orrosion re s is ta n t- Should be ra ted for a m inim um of

twelve th o u sa n d (12 ,000) flight h o u rs

- M ust conform to m ilitary specification (Low Tone Low Visibility G ray Camouflage)

- W ith full o rganizational an d techn ica l signage

8. Su rvivab ility F eatu res - Safety fea tu res of the a ircraft for increased aircrew survival

a. EGRESS

- “Zero-Zero” ejection sea t

- Life Raft p er sea t

- Survival Kit per sea t- F irst Aid Kit per sea t

- Em ergency Locator T ransm itter Device per sea t (covering 121.5 MHz an d SARSAT range of 406 MHz)

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityW DND TWG - 4212202; BAC Secretariat - 4213531

Page 8: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n s C om ply/ Not Com ply

b. A rm or Plating

- F ron t an d rea r cockpit w ith arm or p lating in vu lnerab le sections of the cockpit an d ballistic tolerance u p to 7 .62m m am m unition

c. Fuel Cell- Self-sealing ta n k w ith certified

ballistic to lerance of a t leas t 7 .62m m am m unition

d. E x ternal S tores - Je ttiso n ab le

e. R adar W arning Receiver (RWR)

- E quipped

f. M issile Alert W arning System (MAWS)

- E quipped

g. Chaff an d Flare - Equipped

9 . E nvironm ental S ystem

- E quipped w ith O n-B oard Oxygen G eneration System s (OBOGS)

- C ockpit T em perature C o n tro l/E q u ip m en t Cooling

- Anti-G system

2. INTEGRATED LOGISTICAL SUPPORT (ILS) REQUIREMENT

Item S p ec ifica tio n sC om ply/

Not Com ply

1. T raining Program - It m u s t cover the operational, m ain ten an ce , an d m ission su p p o rt tra in in g req u irem en ts

- S upplier shall a d d re ss all tra in ing a n d tra in in g su p p o rt e lem ents to o p era to rs an d m ain tenance p ersonnel involved in the operation of the a irc ra ft

- T rain ing shall be conducted in English

- S upp lier shall pay the cost of tra in ing an d its inciden tals su ch a s airfares, board an d lodging, local tran sp o rta tio n , sub sis ten ce

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityB DND TWG- 4212202; BAC Secretariat - 4213531 ^

103

Page 9: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n sC om ply/

Not Com plyallow ances, an d in su ra n ce s of tra in ees for all tra in ing program s connected w ith the a irc ra ft acqu isition

- The com plete Program of In s truc tion for all types of tra in ing involving pilots, m a in ten an ce officers an d m a in ten an ce crew shall be provided by the supp lie r du rin g the O pening of Bids

- A sep a ra te an d sim ilar tra in ing a irc ra ft shall be provided by the supplier. H ence, a ircraft to be delivered shall no t be u sed by the su p p lie r for the tra in in g of pilots

- O perational tra in in g (pilots an d m ain tenance) m u s t be com pleted w ith in th irty (30) days p rio r to the delivery of the CAS a irc ra ft a t the m a n u fa c tu re r’s tra in ing facility. It will a t le as t include:

a. P ilo t Training - Pilots shall undergo F unctional Test Flight, In s tru c to r an d O perational Pilot T rain ing in accordance w ith the su p p lie r’s tra in ing program a t the m a n u fa c tu re r’s facility. All pilots sh all also undergo sim ula to r an d ac tu a l tra in ing an d perform ance p lan n in g on a day an d n ig h t w eapons delivery to include a c tu a l day an d n ig h t delivery of precision guided an d non-precision a ir m unitions. In add ition , all pilots shall also undergo a c tu a l NVG train ing .

- E ach pilot m u s t be able to expend the m in im um requ irem en ts for g u n n ery tra in in g of th e following air m u n itio n s , the supp lier shall sh o u ld er all a ir m unition req u irem en ts of the training:

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City» DND TWG - 4212202; BAC Secretariat - 4213531

104

Page 10: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition ProjectSection VII. Technical Specifications

Item S p ec ifica tio n sC om ply/

Not Com ply

Air M unition Q uantity1. Cal .50 R ounds 2002. 2.75 inch

Rockets 8

3. 2 .75 inch Precision G uided R ockets

4

4. Practice Bom bs 85. Precision

G uided Practice Bom bs

4

Position Nr of Pers1. F unctional Test

Pilots 2

2. In s tru c to r Pilots 43. O perational

Pilots 2

b. M ain ten an ce/ S p ec ia list P erson n el Training

M aintenance officers shall undergo m ain ten an ce superv isor tra in ing an d m ain ten an ce personnel shall undergo tra in in g on the two levels of m ain ten an ce , nam ely;O rganizational Level M aintenance (OLM), an d Field Level M aintenance (FLM) of following a ircraft system s:

Position Nr of Pers

Maintenance Officer 21. Engine System 22. Electrical System 23. Instrum ents System 24. Avionics system 2

5. Communications 2System

6. Air Plane in General 2(APG)7. Pneudraulic /

Hydraulic System 2

8. EGRESS 29. Environmental 2

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityS DND TWG - 4212202; BAC Secretariat - 4213531

' f 105

Page 11: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition ProjectSection VII. Technical Specifications

Item S p ec ifica tio n sC om ply/

Not Com ply

2 . Ground Support E quipm ent (GSE)

System10. Airframe System 211. Weapons System 2And other aircraft related systems not mentioned above

2 each sys

- The GSE m u s t provide for servicing, hand ling , a n d m ain ten an ce of the a ircraft in bo th O rganizational and Field Levels.

- Two (2) se ts , one (1) for m ain opera ting base an d one (1) for forw ard deploym ent sta tion , these equ ipm ent include b u t are no t lim ited to the following:

a. S ta rting u n itb. Towing B arc. A ircraft J a c k sd. Engine s tan d se. H ydraulic C artf. B attery C hargerg. Aux T ank C arrierh. Oxygen Servicing U niti. W indsh ield /C anopy Riggerj. Flight C ontrols Tem platek. Tire C hangerl. Tug T ractorm. O ther AGE an d accessories

necessa ry for the m ain tenance an d operation of th e a ircraft like a ircraft cover, propeller b lade cover, m ooring, g rounding wire, am ong o thers

- Tools, d iagnostic a n d /o r te s t equ ipm ent, aerospace ground equ ipm en t (one se t each):a. Field M aintenance Toolsb. Special Toolsc. Test D iagnostic E qu ipm entd. A rm am ent System m ain tenance

an d repair toolse. A rm am ent H arm onization

Kit

4 "

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City9 DND TWG-4212202; BAC Secretariat -4213531 v

106

Page 12: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n sC om ply/

Not Com plyf. Propeller B alancerg. Fuel Nozzle Spray P a tte rn Test

equ ipm ent3. T ech n ica l M anuals Two (2) original copies an d two (2)

electronic copies of the following techn ica l m an u a ls except; Pilot check lis t - twelve (12) copies, original an d electronic a n d Flight m an u a l - six (6 ) copies, original an d electronic m u s t be provided:

F light M anualPilot check listM aster M inim um E qu ipm ent ListA ircraft W eight an d B alance M anualW iring D iagram M anualA ircraft M ain tenance In stru c tio n M anualIllu s tra ted P arts CatalogPower P lan t B uild -up M anualC onsum able M aterial ListI llu s tra ted Tools an d E qu ipm ent M anualG round Service E qu ipm ent (GSE) Technical Publications

S tru c tu ra l R epair M anual

Non- D estructive Inspection (NDI) M anualShop T est E qu ipm en t M anualG eneral Inform ation an d Servicing M anualA ircraft Towing M anualB asic W eight C hecklist and Loading D ataA ircraft S cheduled Inspection and M ain tenance R equirem entsE q u ip m en t Inventory ListC orrosion C ontrol M anual

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilia Aguinaldo, Quezon CityS DND TWG - 4212202; BAC Secretariat - 4213531

107

Page 13: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n sC om ply/

N ot Com plyN on-N uclear M unitions Basic Inform ationN on-N uclear M unitions Loading ProceduresN on-N uclear M unitions Delivery M anualM aintenance In s tru c tio n A rm am ents SystemC om ponent O verhaul M anualO ther Technical O rders and A ircraft/S ystem E qu ipm en t M anuals

4. Spare Parts Program

- The supp lie r shall provide sp ares sufficient for two (2) years of operation w ith an a n n u a l utilization ra te of six h u n d re d (600) flight h o u rs per a ircraft. Fast-m oving item s a n d co n su m ab les shall be delivered together w ith the GOODS

- The com plete lis t of TCI, RCA, fast m oving item s an d consum ab les sh all be provided by the supplier d u ring the O pening of Bids (Price List to be included in the financial docum ents)

5 . Product Support Inform ation

- As p a rt of th e p ro d u c t su p p o rt inform ation, pub lica tions an d techn ical b u lle tin s shall also be provided a s long a s the a ircraft are being opera ted by the PAF. It shall include am ong o thers;v' Inform ation B ulletins

S Service B ulletinsS M odification B ulle tins

6 . M ulti-M edia Support

- An E lectronic Copy of O perators M anual, M ain tenance M anual an d Illu stra ted P a rts C atalogue

- C om puter-B ased T raining (CBT) for the a irc ra ft system s (power p lan t, electrical, airfram e, etc.)

DND Bids arid Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City» DND TWG - 4212202; BAC Secretariat - 4213531

108

Page 14: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition ProjectSection VII. Technical Specifications

Item S p ec ifica tio n sC om ply/

Not Com ply

7. Interim C ontract Support

- The Supplier shall be requ ired to have an In terim C o n trac t S upport (ICS) to en su re the proper operation , m ain ten an ce , and troub le-shooting of the a ircraft upon accep tance of the delivery of a ircraft. It shall include a n ICS team to conduct the tra n s itio n tra in in g of m ain tenance perso n n el for all a irc ra ft system s locally.

- O ne (1) techn ica l rep resen ta tive from th e p ro ponen t to ca te r the in ­cou n try services for the PAF is requ ired upon accep tance of the first th ree (3) a irc ra ft an d will end one (1) year after the final accep tance of th e rem ain ing th ree (3) aircraft. Sam e tech rep will w ork a s a M aintenance an d On the Jo b T raining (OJT) C o n su ltan t of ou r m ain ten an ce crew. The in -coun try techn ica l rep resen ta tive will w ork for five (5) days (Monday- Friday) a w eek for a t leas t four (4) h rs a day an d m ake h im self available on w eekends (S aturday a n d Sunday) a n d holidays w henever h is services are deem ed necessary .

- The supp lie r shall provide a te s t pilot u n til th e com pletion of tra in in g of the F unctional Test Pilot.

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityS DND TWG - 4212202; BAC Secretariat - 4213531

109

Page 15: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project___________ Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n sC om ply/

Not Com ply

8. W arranty Program - The supp lie r shall cover Two (2) years w arran ty period per a ircraft w hich will com m ence u p o n accep tance of each aircraft

- Any d iscrepancy due to m ateria l fa ilu re /fac to r shall be corrected expeditiously, w hich shou ld no t exceed sixty (60) days upon receip t of notice by the technical rep resen ta tive . If sixty (60) days tu rn a ro u n d tim e is n o t possible, the supp lie r is u n d e r obligation to rep lace the affected com ponent w ith a new one or provide a tem porary rep lacem en t in o rder n o t to ham per the operational req u irem en ts of the AFP

9 . After Sales Support

- A fter-sales services shall include supp ly of sp ares for the a irc ra ft an d com ponen ts, in terim con trac t su p p o rt, techn ica l su p p o rt, and w arran ties , w hich will also cover the a rm am en t an d n igh t fighting system s. Technical su p p o rt shall include query an d answ ering (to inc lude o p en /free access to online inform ation) an d ass is tan ce on defect investigation while the a ircraft is being opera ted by the PAF

10. Life C ycle M anagem ent Inform ation

- In fo rm atio n / refe rences/ software regard ing M ean Time Between F ailu res (MTBF), lead tim e, shelf life, to ta l life, repairab le cycle a sse ts , as well as inform ation for rep a ir an d overhau l of com ponents to include rep a ir tu rn -a ro u n d tim e and cost shall be provided. Likewise, the p ro p o n en t shall a lso identify all the au th o rized rep a ir facilities, local an d ab road , w here the item s would be repaired or overhauled

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon City® DND TW G-4212202; BAC Secretariat - 4213531

1 no

Page 16: Section VII. Technical Specifications€¦ · 21/10/2015  · Section VII. Technical Specifications AFP Modernization Program Philippine Air Force Project Project Name: Close Air

Section VII. Technical Specifications

AFP Modernization ProgramPhilippine Air Force Project Project Name: Close Air Support Aircraft Acquisition Project

Item S p ec ifica tio n sC om ply/

Not Com ply

11. SupportE quipm ent and Stru ctures

- Supplier shall provide inform ation regarding su p p o rt equ ipm ent and s tru c tu re s requ ired for the m ain tenance and operation of the CAS aircraft. S upport equipm ent m ay include te s t equ ipm ent for a ircraft system s, airfram e, and field equipm ent. On the o ther hand , su p p o rt s tru c tu re s shall include, am ong o thers , system te s t facilities

12. Spares and C om pon en ts Storage Procedures

- Supplier shall provide storage p rocedures of sensitive spares and com ponen ts

DND Bids and Awards Committee, Department of National Defense, DND Building, Camp General Emilio Aguinaldo, Quezon CityS' DND TWG - 4212202; BAC Secretariat -4213531

i l l