16
ISR Task Force II ISR Task Force II Mr. Ed Loxterkamp SECDEF ISR Task Force AT&L Lead SECDEF ISR Task Force AT&L Lead Acquisition and Technology IPT Chair Advanced Systems and Concepts Joint Capability Technology Demonstrations June 09, 2009 Office phone 703-697-1553; email [email protected]

SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IIISR Task Force II

Mr. Ed Loxterkamp

SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L Lead

Acquisition and Technology IPT Chair

Advanced Systems and ConceptsJoint Capability Technology Demonstrations

June 09, 2009

Office phone 703-697-1553; email [email protected]

Page 2: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE 09 JUN 2009 2. REPORT TYPE

3. DATES COVERED 00-00-2009 to 00-00-2009

4. TITLE AND SUBTITLE ISR Task Force II

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of Defense Research & Engineering,Advanced Systems andConcepts,Joint Capability Technology Demonstrations,Washington,DC,20301-3040

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES See also ADM202744. Presented at the European Command and African Command Science andTechnology Conference held in Stuttgart, Germany on 8-12 Jun 2009

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATIONOF ABSTRACT

Same asReport (SAR)

18. NUMBEROF PAGES

15

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

SECDEF Creates the ISR Task ForceISR Task Force II

Accordingly, I am establishing a Department-wide task force to assess and propose options for maximizing and optimizing currently deployed ISR capability. The Operational ISR Task Force will specifically identify and recommend solutions to resource, authority, program and other challenges associated with deploying increased ISR capability

h d f d lto the USCENTCOM AOR. Speed of deployment and enhancement of operational capability should be the prime objectives in evaluating all available options.

The Task Force shall additionally examine the utilization of ISR assets in support of OIF and OEF and identify options for optimizing their usage.

2

Page 4: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

SECDEF ISR Task Force MissionISR Task Force II

Ensure the Defense Department is doing everything possible to provide intelligence, surveillance and reconnaissance (ISR) assets to support warfighters… Collection, PED (Processing, Exploitation &

Dissemination), & Communications

…move the ISR issue to the front burner as it explores “more innovative and bold ways to help those whose lives are on the line.”

Increased ISR capability & capacityAi F Lib t P Ai ft (LPA)• Air Force Liberty Program Aircraft (LPA)

• Army MARSS Aircraft• Remote Video Terminals• Increased fielding of Services UAS capability• Enabling Cloud architecturesg• Long Endurance Multi-int Vehicle• Increased Processing Exploitation and Dissemination

3

Page 5: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IIISR TF Organization

ISR Task Force II

USD (I)VCJCS

SECDEF/CJCSCo-Chair

Senior Review Steering Group (SRSG)Meets Monthly

Monthly/As Directed Updates

LeadLTG Koziol (USDI)

Deputy LeadTBD

DirectorISR TF Review Board (IRB)

<$25M

>$25MMeets Weekly

Ops Staff

TBD

Functional Integrators

SVC, OSD, CSA Senior Reps

Chair ISR TF Execution Board (IEB)

<$25M

Meets Weekly

K Att ib t / R ibiliti

Opns Integ IPTRapid Acq IPTISR Reqs IPT Evaluation IPT

Future Initiatives IPTOpnl Concepts IPTCommunications IPT Resources IPT

Key Attributes / Responsibilities:– Assess unmet ISR requirements and develop options (ID & breakdown bottlenecks and barriers)– Adapt to evolving requirements from CENTCOM / SOCOM / “engaged commanders”– Pursue innovative solutions to ISR challenges (e.g., TPED)– Budgeted Activity

• SRSG – Approve >$25M Initiatives• IRB – Approve <$25M Initiatives ISR TF I

JIEDDOCC ISR PLANORD

Links to Ongoing Activities

4

IRB Approve <$25M Initiatives• IEB – Vet Initiatives/Tee up Initiatives for IRB

– Operationalize approved ISR TF Initiatives ICW CENTCOM / SOCOM– Integrates capabilities into the Operational Framework

ISR TF I CC ISR PLANORDPACOM PLANORD

ISR Force Sizing Construct

JROC/BA Portfolio

Page 6: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

Allocation of Funds to Initiative Categories by Organization

ISR Task Force II

USA

USAF

USNUSMC

25% 50% 75% 100%

E h ff t S i / USMC

SOCOM

CSAs

CENTCOM

JFCOM

EUCOM

Each effort crosses Service/ Agency boundaries

requiring oversight

Most funding falls under

$M

EUCOMMost funding falls under AT&L Special Attention

Memo as enduring requirements

Libert

y

MARSS/ EP-3/

S-3

UAS

FMV

SIGIN

TEnc

ryptio

n

reles

s Mes

h/ HART

NGW

Cloud I

nfras

tructu

re

LEMV

Hawk/

Valien

t Ang

el

Comm

GMTI

RVTsHUMIN

T

Other

Trans

lation

Ground

Senso

rs

GEOINT

5

M

I2A/ W

ire Clo

Consta

nt Ha

USD(AT&L) Special Attention Memo

Page 7: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

Requirement / System DescriptionISR Task Force II

C2/Sensor Network

Air Vehicle• 10-20kft MSL• 3 Weeks on station• 2500lb Payload

20 80 k t

LEMV

Payload• EO/IR• SIGINT

Functional Mission Areas• Surveillance,

Reconnaissance, Intelligence

Growth

• 20-80 knots• 16kVA power

• GMTI Radar• EW/ECM

• Comms Network Bridge, Relay, Range Extension

• Electronic WarfareLOSNetworking

ROVER/OSRVTF Afl tSIGINT/

EW

EO/IR

Forces Afloat

SAR Radar

GMTIRadar

Services Brigade / MEU level ISR

Page 8: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IILEMV Objectives

ISR Task Force II

Hybrid Airship Objectives:

1) 3 week endurance

Payloads Objectives:

1) Ground Moving Target Indicator1) 3 week endurance

2) 2,500 pound payload

3) 20,000 feet Mean Sea Level

) f

1) Ground Moving Target Indicator

• 10 X 10 sq km/h per 60 second refresh rate

• Sedan moving more than 5 mph4) 16 kW of power

5) Multi-INT

6) Reduced Footprint

Sedan moving more than 5 mph

• Minimum detection velocity <5mph i.e. dismounts

2) EO/IR - TBD7) 80 knots dash speed and 20 knots

station keep speed

)

3) Communication - TBD

4) Other - TBD

Demonstration in Afghanistan in 18 months after Contract Award

Page 9: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

Long Endurance Multi-INT VehicleISR Task Force II

Airship Survivability

Graceful descent after engagement with hundreds of high velocity bullets

2268

3024

2500

3000

3500

wer

Personnel per Orbit Comparison Cost and Schedule comparison

400

300

400M/Copy

Delivery

CumulativeFuel Cost*

252 360

756720

1512

10801440

1000

1500

2000

2500

LEMVMQ-1/9JSTARSM

anpo

w

50

100

200($M

)

130M/Copy

Delivery

237M

30M/C *

38 120

252

58360

116 174 232

0

500

1 3 6 9 12

3x-6x manpower reduction over JSTARS

Orbits6 12 24 36 48

15

50

Months

43.2M

Delivery .5M

30M/Copy*

Page 10: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IIHAV Condor Vehicles Size Comparison

ISR Task Force II

C-17

C d Condor 404

C-5

Condor 204

NB - For size comparison only - Condor does not need to

KC-135- Condor does not need to use aircraft hard standing

Page 11: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

LEMV Notional ScheduleISR Task Force II

3QFY09 FY 12 - 141QFY10 2QFY10 3QFY10 4QFY10 1QFY11 2QFY11 3QFY11 4QFY11FY 10 FY 11

4QFY09FY 09

T h l D l t S t D l t/D t ti P d ti & D l t O & S tContract/Team D l t

Contract Award

Technology Development Systems Development/Demonstration Production & Deployment Ops & SupportDevelopment

Design

Preliminary Critical

AcquisitionStrategy Decision

IPT

Flight Demonstration & Sustainment

PreliminaryDesign Review

Platform Fabrication Assembly &System Integration

System Test/Risk Reduction

CriticalDesign Review

ThreatAssessment

Payload Selection Payload IntegrationPayload Integration

Transition to Program of Record (Army, Navy, Air Force, Other Government Agencies) Start the JCIDS Process

Page 12: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IIISR Task Force II

Questions?

Page 13: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force II

Comparison of FAR and OTA ConstructISR Task Force II

OTA AdvantagesFAR LimitationsCOCOMS Components

COCOMS Components

Warfighters/ Requirements

Solution Provider

Acquisition/ Contracting

Solution Provider

Warfighters

•Direct communication between the needs and solution providers

•The contracting officer’s role has primacy over programmatics

Components(Concerns & focus areas)

ISR Task Force II- Rapid Acquisition IPT OT Advantages

p(Concerns & focus areas)

ISR Task Force IIRapid Acquisition IPT FAR Requirements (Partial)

Services

Rapid Acquisition IPT-- OTA Support

OT Advantages (Partial)•No mandatory cost accounting standards/reporting

•No certified cost and pricing data

Services

- Rapid Acquisition IPT FAR Requirements (Partial)•Competition in Contracting Act

•Bayh-Dole & Rights in Tech Data

•Truth in Negotiations Act

•Contract Disputes Act

S pricing data

•Commercial standards

•Tailored audit oversight

•Prime/sub relationship not required (teaming)Contracting Office*

•Procurement Protest System

•Procurement Integrity Act

•Grants and Agreements Regs

Contracting Office

ISR Tech Consortium

Tech ManagerTech Manager

Commercial Vendor

* Contracting office needs an agreements warrant and consortium experience

The difference is the process

ISR Tech Consortium

Page 14: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IINeeds/Requirements

ISR Task Force II• ISR Task Force needed LEMV for:

Answers persistent ISR requirements from multiple COCOMs Provides a solution set with higher endurance and lower manpower costDeveloped and approved as an ISR TF initiative with Vice Chief Joint Chief of Staff UnderDeveloped and approved as an ISR TF initiative with Vice Chief Joint Chief of Staff, Under Secretary of Defense (Intelligence), and Secretary of Defense approvalGiven to the Army (SMDC) to execute for the department

•JROCM 133-08; dated 23 June 2008 Subject: Validation of FY 2009 Joint Capabilities Technology Demonstration ProposalsSigned by VCJCS, General Cartwright

•Operational Requirements Document for Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS) 24 Feb 04 JROC Approved 22 Jan 04Sensor System (JLENS) 24 Feb 04, JROC Approved 22 Jan 04

"Para. 4.1.2 (U) Block II. This block is predicated on the accomplishment of Block I threshold capabilities. Selected Block I objective requirements become threshold requirements for Block II and some new objective values have been added for Block II. In addition Block II KPP 1, SIAP Support, incorporates selected non-KPP surveillance

i t f Bl k I Th Bl k II l t d l tf ill ti t l brequirements from Block I. The Block II elevated platform will continue to evolve by introducing an additional KPP that transitions the system to a non-tethered platform solution that significantly reduces the logistical and manning burdens associated with the Block I system. The platform KPP is not to be interpreted to preclude the development and provision of advanced sensor payloads apart from advances in the platform. This means that the Block I p y p pplatform (aerostat) could host a Block II sensor and conversely a Block II platform could host a Block I sensor..."

Page 15: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IILEMV Statement of Objectives

ISR Task Force II• LEMV progressing with Army SMDC lead

– Initial $5M pending ATR #2 approval

• Army lead releasing Statement of objectives (SOO) this week– Provides industry baseline foe vehicle performance standards and program

expectations

• Organized as follows:– 1.0: Basic Objectives– 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation– 3.0: Command and Control– 4.0: Risk Mitigation and Trade Space Analysis– 5 0: Ground Facilities5.0: Ground Facilities– 6.0: Testing and Demonstrations– 7.0: Flight Safety and Regulatory Issues– 8 0: Operations and Support8.0: Operations and Support– 9.0: Software– 10.0: Data and Reports

Page 16: SECDEF ISR Task Force AT&L LeadSECDEF ISR Task Force AT&L ... · – 2 0: Monitoring and Instrumentation2.0: Monitoring and Instrumentation – 3.0: Command and Control – 4.0: Risk

ISR Task Force IILEMV Statement of Objectives

ISR Task Force II• 1.0: Altitude, payload power, weight and volume, endurance, stability, speed,

environmental controls, growth path, and conditions for GOCO operations

• 2.0: Measuring and monitoring outside environments, airship performance, internal and payload bay environments

• 3.0: C2 ground station, encryption, LOS and BLOS operations

• 4.0: Mitigation plans, tradeoff analysis, parallel developmentg p , y , p p

• 5.0: Ground support equipment and personnel, maintenance facilities for fabrication, flight preparations, launch and recovery

• 6.0: Documented test program, mission planning and flight operations support,6.0: Documented test program, mission planning and flight operations support, contractor-flown demonstrations

• 7.0: Compliance with FAA rules, mitigate electromagnetic compatibility, emergency procedures, flight termination procedures

• 8.0: Provide critical spares, support military utility assessment, and provide input for doctrine, training, logistics, personnel, and organizational requirements

• 9.0: Document open architecture, open source code, and executable for reuse

• 10.0: Integrated master plan, work breakdown structure, cost/ schedule management, system description, contract data status and schedules, test plans, in-process reviews, and final report