Page 1: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

SE 12th StreetRoadway Improvements

February 8, 2005

Page 2: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

E. UNIVERSITY AVENUE

SE 1

2th S

TREE

T

SE 1

1th S

TREE

T331

26

SE 1st AVENUE

PROJECTLOCATION

SE 2nd AVENUE

N

Page 3: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

PROJECT PURPOSE

• Widen roadway and improve condition of pavement

• Improve pedestrian access, movement and safety

• Address residential flooding problems

• Improve water quality of Rosewood Branch

Page 4: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

DESIGN ELEMENTS

• Reconstruction/widening of SE 12th Street

• Addition of curb & gutter and storm drain system

• Sidewalk and ADA-compliant ramps

• Paved driveway entrances

• Parking reconfiguration in commercial area

• Construction of stormwater pond

• Rosewood Branch stream bank stabilization

Page 5: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

26

PROPOSEDIMPROVEMENTS

STREAM WORK

• Roadway widened from 20’ to 24’• Curb & gutter and storm drain system • Paved driveway entrances at all existing locations• 6’ sidewalk along west side of roadway for entire street length• 8’ sidewalk and parallel parking along east side of street in front of commercial area • Utility relocations • Stormwater management (SWM) pond south of SE 2nd Avenue for water quality• Grade and stabilize stream banks south of SE 2nd Avenue

E. UNIVERSITY AVENUE

SE 1

2th S

TREE

T

SE 1st AVENUE

SE 2nd AVENUE

N

PARKING

8’ SIDEWALK

6’ SIDEWALK

SWM POND

Page 6: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

ROADWAY TYPICAL SECTION

Existing Roadway Proposed Typical Section

Page 7: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

SE 12th STREET - Looking Towards SE 2ND Avenue

Existing Conditions Artist’s Rendering

Page 8: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

SE 2nd AVENUE AT SE 12TH STREET (Looking East)

Existing Conditions Artist’s Rendering

Page 9: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

SE 12th STREET AT SE 2nd AVENUE (Looking North)

Existing Conditions Artist’s Rendering

Page 10: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

SE 12th STREET - Looking At East University Avenue

Existing Conditions Artist’s Rendering

Page 11: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

ROSEWOOD BRANCH STREAM WORK• New endwall • Stabilize stream banks

• Lay back slopes• Revegetation

• Erosion Protection • Reforestation

Page 12: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

CONSTRUCTION GOALS• Minimize disruptions to residents and businesses • Keep all impacts within City right-of-way

• Grading for sidewalk• Driveway entrance tie-ins

• Maintain one lane of traffic at all times during construction • Road to be closed to through traffic• Access for local residents only• Maintain access to all residential/commercial driveways/entrances

• Complete construction as quickly as possible

Page 13: SE 12 th  Street

SE 12th Street Roadway Improvements

February 8, 2005

PROJECT SCHEDULE

DATE ACTIVITY

JANUARY 2005 PRELIMINARY DESIGN PLANSCOMPLETED

FEBRUARY 2005 PUBLIC MEETING

APRIL 2005 FINAL DESIGN PLANS COMPLETED

SUMMER 2005 BEGIN CONSTRUCTION

DECEMBER 2005 FINISH CONSTRUCTION

We Are Here