33
December 10, 2013 Street by Street Committee

December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

Embed Size (px)

Citation preview

Page 1: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

December 10, 2013 Street by Street Committee

Page 2: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

3 Projects

• NE Holman, 52nd to 55th • SE 57th, Rural to Nehalem• SE Woodward, 75th to 77th

Page 3: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

R5 Zoning

Page 4: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

180 estimated daily trips 50ft width ROW

Page 5: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

18-20ft pavement exists but property owner said residents likely willing to shave this down for Shared facility

Page 6: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

• 680ft long, 50ft wide ROW with 18-20ft center strip paving on west end

• Speeds measured 26-27mph on 25mph street• 14 existing homes access street with potential for 4 more• 18 homes would generate 180 trips per day• There may be additional trips with the completion of

Holman but not significant• SE Holman is a Safe Route to School (Rigler) from 42nd

to 55th. 55th also a safe route.• 55th is also recommended as a new neighborhood

greenway for the neighborhood. If improved would make a good extension of Holman Greenway that ends currently at 42nd

Page 7: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

Looking east from 52nd

Page 8: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

Page 9: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

Looking east at 53rd Place

Page 10: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

NE Holman, 52nd to 55th

Looking east to 55th Ave

Page 11: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

R5 Zoning

ROW varies 25-60ft

Nehalem

Rural

160-240 est trips per day

Page 12: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Maintenance responsibility

Page 13: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem – Block by Block

• *Rural to Ogden – 210ft long, 18 ft center strip pavement in 25ft wide ROW, 5 homes, no likely additions.

• *Ogden to Knapp – 448ft long, 25ft wide except last 150ft is 60ft wide, unimproved, 6 homes and possible 6 more.

• Knapp to Henderson – 245ft long, 60ft wide, unimproved, 3 homes, 1 more possible.

• Henderson to Flavel – 258ft long, 60ft wide, unimproved, 4 homes, 1 more possible.

• Flavel to Malden – 250ft long, 60ft wide, unimproved, 4 homes, no more likely.

• Malden to Lambert – 251ft long, 60ft wide, unimproved, 4 homes, no more likely.

• *Lambert to Lexington – 256ft long, 60ft wide, 18ft center strip paving, 3 homes, 1 more likely.

• Lexington to Nehalem – 251ft long, 60ft wide, unimproved, 4 homes, no more likely.

Page 14: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

• North of Rural and south of Nehalem, 57th has curb and sporadic sidewalk. A large community garden exists beginning one block north of Rural.

• SE 57th, Rural to Nehalem is 2189ft, mostly 60ft width ROW except for the first 500ft south of Rural which is only 25ft wide.

• 57th south of Nehalem intersects with Tenino Dr and Flavel.• It’s unlikely that traffic north of Flavel would usually continue south

and vise-versa.• North of Flavel, 16 homes exist and 8 more possible. • 24 homes might generate 240 trips per day. • The narrow ROW limits potential separate pathways, however, the

community gardens likely attract a variety of transportation modes. • Collection of speed data is recommended to determine if traffic

calming is needed.

Page 15: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

• 57th north of Ogden, to 130ft north of Rural, appears to exist in a form that already mimics a narrow, shared street environment.

• South of Ogden the ROW is not improved.• A shared street would be suitable.• Consider stopping 57th at Knapp as Knapp is a future

neighborhood greenway. • Stopping Henderson at 57th would fit with a typical

neighborhood stop plan. • Stopping Ogden at 57th would be recommended after

investigation if sigh distance in the reverse curve on Ogden.

Page 16: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

• South of Flavel 15 homes exist and 1 more is possible. • 16 homes might generate up to 160 trips, though many

of the trips already travel elsewhere. • A new north-south connection between Flavel and Flavel

Dr may attract additional traffic.• An alternating stop plan is recommended. • There is not an identified E-W neighborhood greenway

south of Flavel, and many of the streets do not connect. • SE Tenino, south of Nehalem, appears to be the most

likely candidate.

Page 17: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Rural

Page 18: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Ogden

Page 19: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Knapp

Page 20: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Henderson

Page 21: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Flavel

Page 22: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south at Malden

Page 23: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Lambert

Page 24: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE 57th, Rural to Nehalem

Looking south from Lexington to Nehalem

Page 25: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

120 est trips per day 60ft width ROW*

Page 26: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

R5 Zoning

Page 27: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

Street pavement widths / red is also owner maintained with everything else around it City maintained

Page 28: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

Neighborhood Greenway

Page 29: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

• 342ft of unimproved ROW, 60ft wide, except 4 parcels on the north side that have not dedicated ROW.

• The south side parcels have dedicated, but the ROW at the corresponding locations is only 14-30ft wide.

• A dirt and gravel roadway exists along the street segment alignment and over the private property.

• 7 homes access the roadway, with 6 more possible. • 12 homes might generate 120 trips per day.• Woodward at 56th provides access to Franklin HS, and

so might attract more traffic as a direct pathway.

Page 30: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

• Woodward is a future neighborhood greenway and already includes sharrow markings, though another section of Woodward, east of 78th, is also unimproved (currently a work around that uses Tibbetts to the south)

• Past traffic counts at 73rd and 80th have measured 360-410 trips per day with 85th percentile speeds of 26-27mph, though Woodward has recently been posted for 20mph due to the greenway designation.

• New speed counts are recommended as is traffic calming.

Page 31: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

View looking east from 75th

Page 32: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

View looking east

Page 33: December 10, 2013 Street by Street Committee. 3 Projects NE Holman, 52 nd to 55 th SE 57 th, Rural to Nehalem SE Woodward, 75 th to 77 th

SE Woodward, 75th to 77th

Looking east to 77th