PROJECT Bullpen Party Deck – Cheney Stadium APPLICATION TYPE Time of Placement PRODUCT TYPE SCP 327 DESIGN CONSULTANT Mortenson Construction TOTAL AREA 70,000 ft 2 (6,500 m 2 ) Bullpen Party Deck Cheney Stadium Tacoma, WA AFTER DURING pr ject Sports facilities often deal with maintenance and safety issues related to food and drink spillage during games, with ballpark party decks experiencing the worst of them. Mortenson Construction had these issues in mind when constructing the new Bullpen Party Deck at Cheney Stadium. For more information, visit www.concreteprotection.com OVERVIEW When Mortenson planned the construction of the party deck, they knew they needed a solution that could protect against spills and wear and tear. The curing qualities of SCP reduced cracking and allowed the construction crew to access the slab within one hour. The 70,000 ft 2 deck was open to crowds in just 20 days, and with SCP locking out moisture and chemicals, post-game cleanup is now a breeze. Unlike traditional sealers and coatings that need to be reapplied every 3-5 years, SCP is permanent, reducing maintenance costs for years to come. PROJECT DATA highlight SKU: 32-SCP-PH-CHENEYSTDM REV: Release Date: 12/16/16

SCP ProjectHighlight CheneyStadium REV Release v2 · SCP_ProjectHighlight_CheneyStadium_REV_Release_v2 Created Date: 12/16/2016 9:39:57 AM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCP ProjectHighlight CheneyStadium REV Release v2 · SCP_ProjectHighlight_CheneyStadium_REV_Release_v2 Created Date: 12/16/2016 9:39:57 AM

PROJECTBullpen Party Deck – Cheney StadiumAPPLICATION TYPETime of PlacementPRODUCT TYPESCP 327DESIGN CONSULTANTMortenson ConstructionTOTAL AREA70,000 ft2 (6,500 m2)

Bullpen Party DeckCheney Stadium

Tacoma, WA

AFTER

DURING

pr jectSports facilities often deal with maintenance and safety issues related to food and drink spillage during games, with ballpark party decks experiencing the worst of them. Mortenson Construction had these issues in mind when constructing the new Bullpen Party Deck at Cheney Stadium.

For more information, visitwww.concreteprotection.com

OVERVIEW

When Mortenson planned the construction of the party deck, they knew they needed a solution that could protect against spills and wear and tear. The curing qualities of SCP reduced cracking and allowed the construction crew to access the slab within one hour. The 70,000 ft2 deck was open to crowds in just 20 days, and with SCP locking out moisture and chemicals, post-game cleanup is now a breeze. Unlike traditional sealers and coatings that need to be reapplied every 3-5 years, SCP is permanent, reducing maintenance costs for years to come.

PROJECT DATA

highlight

SKU: 32-SCP-PH-CHENEYSTDM REV: Release Date: 12/16/16