School District of Fort Atkinson
Dennis KuchenmeisterDirector of Buildings & Grounds
Green School National NetworkSacramento Convention Center
Sustainable Facilities Design & Management
Large, Medium & Small: Energy Efficiency for All
Friday, March 28, 20142:45 pm
We do not want to be green just to be green.
We are shaping future leaders in the fight against climate change.
Teaching the importance of saving energy by living it every day.
Cutting costs, saving energy and leading the way to the future.
3
LAMPS & BALLASTSCompleted 2006
Cost $320,311 $278,368 net
Incentives $41,943
Cost Savings $73,106 Annual
Energy Savings 812,291 kWh Annual
Financing Borrow from District
4
GEOTHERMALCompleted 2007, 2008
Cost $10,688,881 $1,040,000 A/C
Incentives $99,791
Cost Savings ~ $56,000/year average
Energy Savings 11,542,577 kBTU-52.6%
Financing Referendum
5
SOLAR THERMALCompleted 2008, 2009
6
M.S. H.S.
Cost $106,00 $152,930
Incentive $80,814 $100,00
Cost Savings $13,400 Total $10,200 Total
Energy Savings 10,983 Therms 8,570 Therms
Financing Budget Budget
SOLAR PHOTO VOLTAIC Completed 2009-2010-2013
7
Purdy RockwellCost $118,316 $115,735
Incentive $105,919 $47,555
Cost Savings $10,500 Total $650 Total
Energy Savings 89,750 kWh 5,000 kWh
Financing Budget Budget
WINDCompleted 2010-2011
Cost - $418,688
Incentives - $269,164
Cost Savings – $26,900 Total
Energy Savings - 231,674 kWh
Financing – Borrowed from District
8
SavingsSavings Outlay
• Lighting Upgrade- Lifetime (2007-2013) 12/06
~$507,000 $273,298
• Geothermal- Lifetime (2007-2013) 9/1/07 & 9/1/08
~$270,000 $1,040,000
• Solar Hot Water @ Middle School - Lifetime (2009-2013) 10,983 therms 10/31/08
~$13,400 $25,185
• Solar Hot Water @ High School- Lifetime (2009-2013) 8,570 therms 10/31/08
~$10,200 $52,930
• Solar Electric @ Purdy- Lifetime (2010-2013) 89,750 kWh 7/28/10
~$10,500 $12,399
• Wind Turbine @ High School- Lifetime (2011-2013) 231,674 kWh 4/4/11
~$26,900 $145,708
• Solar Electric @ Rockwell- Lifetime (2013) 5,000 kWh 9/9/13
~$650 $68,180
• Pool Vent Unit @ High School- Lifetime (2012-2013) 18,000 therms and 179,370 kWh 3/30/12
~$37,000 $136,964
Totals ~$875,650 $1,754,664
9
EXECUTIVE DECISIONS
School Buses Converted to LP Tankless Water Heaters
Increase Roof Insulation (Varies)
Window Upgrades
10
EXECUTIVE DECISIONS(Continued)
Auto Computer Power Down
Retro Commission – HVAC & Envelope
Pool Vent Unit
Occupancy Sensors
11
1. Find An Advocate Pusher - Ideas
2. Have A Vision Something to Live By
3. Create An Energy Plan Road Map
4. Educate/Advocate The Right Thing
5. Celebrate SuccessBuilds Excitement
STEPS ALONG THE WAY
13
“Being a Green District means acknowledging the responsibility to consider how well our children are
prepared for the world, and what kind of world we are creating for them. The students are our greatest resources.
We are not only providing an environment that is conducive to learning but teaching and leading by example,
the future leaders of the world. If we can instill in our children the care, knowledge and importance of Green &
Healthy we are giving the next generation the leaders it will take to better deal with the critical environmental issues.”
Dennis Kuchenmeister
2. HAVE A VISIONLive it
15
4. EDUCATE/ADVOCATECreate a Movement Wherever You Can
Student Green Teams
Lt. Governor’s Energy Challenge
Wisconsin Sustainable Coalition
BBC Energy Summit
Guest Presentations
17
5. CELEBRATE SUCCESSBuilds Excitement
Be Proud of AccomplishmentsEnergy Star Certification – All
Environmental Achievement Award – UWW
Green Award – City of Fort Atkinson
SE2 Sustainability Energy Efficiency
Green Ribbon – Purdy Elem. & District
19
Showcase Project #1
Luther Elementary School Geothermal SystemPV/Solar Back Up
Replace Gas Fired Boiler System Provides Air Conditioning Complete 9/2019
21
DOE – BBC PARTNER SCHOOLS
Cost - $3,000,000 (Inc. add. work)
Energy Savings – 2,500,000 kBTU’s Annual 38%
Dollar Savings - $38,000
Showcase Project #2
Rockwell Elementary School Photo Voltaic System 20.16 kW Roof Mounted System Provides Hands on Exposure to Classrooms
Duration 15 Month – Complete 9/2013
22
Cost - $115,735 / $68,180 net
Energy Savings ~ 32, 097 kWh Annual
Dollar Savings ~ $3,500
DOE – BBC PARTNER SCHOOLS