19
SCADA/EMS/AGC Refurbishment and Upgrade Project in Croatian TSO Boris Golub, mag. inf. et math. KONČAR – Power Plant and Electric Traction Engineering Inc.

SCADA/EMS/AGC Refurbishment and Upgrade Project in ... · SCADA/EMS/AGC Refurbishment and Upgrade Project in ... RCC 1 Network Devices SCADA/EMS SCADA ... Student modul:

  • Upload
    lamthu

  • View
    237

  • Download
    2

Embed Size (px)

Citation preview

SCADA/EMS/AGC

Refurbishment and

Upgrade Project in

Croatian TSO

Boris Golub, mag. inf. et math.

KONČAR – Power Plant and Electric Traction Engineering Inc.

• Customer – Croatian Transmission System

Operator Ltd.

• Contract signed: 21.11.2007.

• Statement of work: 21.06.2008.

• Project finished: 28.02.2014.

• Warranty period: 36 months

General Project Information

Project Scope

Significant and complex IT project which covers most

business processes of Croatian TSO

Included:

•Delivery and installation of HW & Network Equipment

•Replacement of existing SCADA system in NCC / 4RCCs and new

ECC

•Upgrade of SC and RTU-s in SS

•Delivery and integration of EMS / AGC / OTS

Project Scope

• Delivery and integration of Metering System

• Delivery and implementation Market Functions

• Lightning Location System

• Wind Power Management System

• Data Warehouse

• AntiVirus Protection System, Patch Management System, Backup

System, ISMS/IT Security and Network Management System

NCC

RCC 2

Network

Devices

MMS

Planning

Monitoring

Crossborder

Transfer Power

System functioning

Planning

Planning

Transmission

Network Losses

Outage

Planning

Acquisition

Planning

Load ForecastWind energy

forecasting

system

Market

Transmission

Capacity

Auction

Reserve

Energy

Procurement

Balancing

Energy

Procurement

Energy for

Covering

Losses

Procurement

Settlement

Crossborder Losses Calculation

Settlement of Energy for

Covering Losses Procurement

Invoicing and Billing Monitoring

for Allocated Transmission

Capactiy

Control Area/Block Unintentional

Deviations Settlement. Creating

and Conciliating Compensation

Programmes.

Balancing energy Settlement for

BRP

Congestion Settlement

Crossborder transfer losses

settlement

Cost Calculation – balancing

energy, anciliary system services

SCAD/EMS/AGC

SCADA

Historical

Database

AGC

EMS

State Estimator Security Analysis

Short Circuit

Analysis

Voltage

Scheduler

Dispatcher

Power Flow

Web Access

Centralised Data Engineering

SCADA/EMS/AGC

Lightning

Location

System

Operator Training Simulator

Data Warehouse

SCADA/EMS

SCADA

Historical Database

Web Access

Remote Data

Engineering Access

SCADA/EMS

Intelligent

Alarm

Processing

Remote EMS

AccessData Mart

Web Portal

TASE.2

Gateway

NonEH

TASE.2

Gateway EH

WAMS

Common Data

Model

Transient

Stability

Analysis

Catalist 6500

ASA 5520

IPS 4260

RCC 1

Network

Devices

SCADA/EMS

SCADA

Historical Database

Web Access

Remote Data

Engineering Access

SCADA/EMS

Intelligent

Alarm

Processing

Remote EMS

AccessData Mart

RCC 2 Objects

Web Portal

Catalist 6500

ASA 5520

IPS 4260

RCC 4

Network

Devices

SCADA/EMS

SCADA

Historical Database

Web Access

Remote Data

Engineering Access

SCADA/EMS

Intelligent

Alarm

Processing

Remote EMS

AccessData Mart

Web Portal

Catalist 6500

ASA 5520

IPS 4260

RCC 3

Network

Devices

SCADA/EMS

SCADA

Historical Database

Web Access

Remote Data

Engineering Access

SCADA/EMS

Intelligent

Alarm

Processing

Remote EMS

AccessData Mart

RCC 3 Objects

Web Portal

Catalist 6500

ASA 5520

IPS 4260

Time Server

Web Portal

NETWORK

DEVICES

Catalist 6500

ASA 5520

IPS 4260

MARS 20

NETWORK AND SECURITY

MANAGEMENT

CiscoWorks

Cisco Security Manager

Cisco Security Agent

Manager

Nagios

Microsoft SMS

ActiveDirectory

PKI

TrendMicro antivirus

Metering Data

System

Network and System

Management

Real-time Data Exchange

DWH Data Exchange

Power Plants in AGC

ECC SCADA/AGC

SCADA

AGC

Historical Database

TASE.2

Gateway EH

Time Server

Replication

Voltage Stability

Analysis

STLFLoad Shedding

and Restoration

RCC 1 Objects RCC 4 Objects

Overall Architecture Overview

Objekti PrP Rijeka

Objekti PrP Split

Objekti PrP Osijek

Objekti PrP Zagreb

NCC

RCC

SPLIT

ECC

RCC

RIJEKA

RCC

ZAGREB

RCC

OSIJEK

Database

replication

Multisite Data

Engineeng

Remote access

administration and

transfer of modifications

to RCC

WAN: RSP

DS803T

Konverter

ADLP/IEC 104

LSA

Konverter

IEC 101/

IEC 104

SICAM

PAS

WAN: IEC 60870-5-104

LSA

Konverter

IEC 101/

IEC 104

Proza

R/F

WAN: IEC 60870-5-104

LSA

Konverter

IEC 101/

IEC 104

WAN: IEC 60870-5-104

LSA

Konverter

IEC 101/

IEC 104

WAN: IEC 60870-5-104

Proza

R/F

Konverter

IEC 101/

IEC 104

SICAM

PAS

Micro

SCADA

Konverter

IEC 101/

IEC 104

Konverter

IEC 101/

IEC 104

SICAM

PASMicro

SCADA

Konverter

IEC 101/

IEC 104

Konverter

IEC 101/

IEC 104

Micro

SCADA

Konverter

IEC 101/

IEC 104

Proza

R/F

DS803T

Konverter

ADLP/IEC 104

DS803T

Konverter

ADLP/IEC 104

DS803T

Konverter

ADLP/IEC 104

Global SCADA System Concept

• IEC 60870-5-104, cca 40.000 indications,

approx. 8.000 measurement

• Data exchange with adjacent operators -

TASE.2

• Real-time databases, identical in NCC and

in RCC (Multisite)

• Mechanisms of regional and local

authorizations based on the type of the user

• Historical database

• Migration and parallel operation of old

and new system

SCADA

SCADA MIGRATION

ECCNCC

RCC

DAS/SC

RKnet

ADLP-80

NCC RCC

DAS/SC/PKK/AR+

WAN

IEC60870-5-104

RSP

OLD CONCEPT NEW CONCEPT

SCADA MIGRATION

+

NCC

RCC

RCC objects

ADLP-80

RKnet

ECC

NCC RCC

WAN

IEC60870-5-104

RSP

OFF-LINE

DATA

CONVERSION

NO CHANGES CENTRAL DATA PREPARATION

SIMULTANEOUS MIGRATION

OLD AND NEW CONTROL

CENTARS WORK IN PARALLEL

DURING MIGRATION

PROTOCOL AND

ADDRESS

ADAPTATION

EMS functions:

•In real time and in a study mode

•Size of the network model: 252 stations of internal

and external networks, 430 lines, 506 transformers,

135 generators, approx. 7.200 measurement,

approx. 8.700 indications.

•EMS functions calculations over the entire model

of the network in real time within 2 seconds

CF (Congestion Forecast):

•Automated production of the 24 hour feasibility

test, 24 hour planned losses and 24 hour NTC

value calculations for the crossborder exchange

•Automated production of IDCF files

•Making DACF files on demand

Energy Management System - EMS

• Installed in the NCC and ECC

• Production management system within

Croatian TSO domain of responsibility :

– AGC function

– ED function

• Regulation power plants (3) + Cetina river

catchment

• Control area / block

• System Ancillary services market

Secundary control prices for ED function

Regulation

power plant

EDAGC

Real time

DB

GUIMarket

functions

Metering

sourcesSCADA Request

External

database

s and

systems

Historical

database

Automatic Generation Control – AGC

• Landys&Gyr Advance

• Installed in a dual configuration using

Hyper-V virtualization

• Connected to C2000 by using oracle

DB links

• Support for virtual measurements

• Powerful operational reporting

• Data source for other information

systems

– MMS Accounting and

Settlement

– DWH

– etc.

New Metering System

Student modul:

• Provides identical environment for

power system operators training as in

on-line SCADA/EMS system, but

without affecting the system itself

• Users can learn how to manage the

power system during the disturbance,

in exceptional circumstances and

during the establishment of normal

network state

Instructor modul:

• Provides facilities for the preparation

of training, training control and post-

training analysis

Operator Training Simulator – OTS

INTELLIGENT VISUALIZATION INTELLIGENT ALARM HANDLING

LIGHTNING LOCATION SYSTEM

WIND POWER MANAGEMENT

New Software Systems

Market Management System

• The integration of data from

different source systems

• Common Data Model (CDM)

• Reporting functions

• Advanced analytics

Data Warehouse (DWH)

• Globaly segmented network –

VLANs across all locations

• Network traffic filtering – allowed

only necessary between segments

+ intrusion detection system (IDS)

• Central network management and

security mechanisms

• Safety rules defined on the basis of

the information security and

information risk assessment

analysis (ISMS according to ISO

27001)

Network and Security

• One of the most important ICT projects in Croatian TSO

• Cooperation of Croatian TSO, KONČAR, Croatian companies and

research institutions

• Complexity of comprehensive technical solutions and great

technological breakthrough

• Solid foundation for future development and improvement of the

overall system

• A significant contribution to the safety and effectivness of power

system management

Conclusion