11
SC Monitoring Program Noise Norbert Häubner [email protected]

SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

SC Monitoring Program Noise

Norbert Häubner [email protected]

Page 2: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Revised proposal for a regional monitoring sub-program of continuous noisePurposeQuantify the pressure of continuous sound in the HELCOM region

AimTo determine the sound pressure level in the Baltic Sea through standardized and coordinated activities by Member States

2017 2018 2019

Post-monitoring analyses, e.g. optimization of number and location of rigs vs. gain of results

Minor monitoring at prioritized locations and automized runs of soundscape model

2015 20162014 ?

Page 3: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Current monitoring

Year Denmark Germany Poland Estonia Finland Sweden Lithuania Latvia Russia2014 - - -2015 - - - - -2016 - - -2017 - - -

Status of the acoustic measurements in HELCOM countries during 2014 – 2017 “” measurements at one or more locations

A regional coordination is necessary for an cost effective and quality controlled monitoring program.

Page 4: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Current monitoring• National monitoring by 6 of 9 member states (no regional coordination)

• Standards of monitoring and signal processing already developed

• Infrastructure for a regional data sharing platform and visualization tool exist after the BIAS project.

Page 5: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Regional monitoring sub-program

Minor monitoring – every year1. Measurements at prioritized locations

- performed by Member States.2. Maps produced by a soundscape model

- performed by appointed party.3. Soundscape maps combined with

measurements in a visualization tool- performed by appointed party.

Page 6: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Regional monitoring sub-program

Major monitoring – when needed1. Need for extended monitoring efforts is based on

the difference between yearly observed and modelled results, or by the need for specific actions or results dictated by HELCOM processes.

2. Purpose to calibrate the soundscape model-performed by Member States.

3. Optimization of number and locations of sensors vs. gain of results - performed by appointed party.

Page 7: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

2017 2018 2019

Post-monitoring analyses, e.g. optimization of number and location of rigs vs. gain of results

Minor monitoring at prioritized locations and automized runs of soundscape model

2015 20162014 ?

Page 8: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Current Soundscape planning tool

Page 9: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Emergence maps of traffic noise above natural sounds

The map show the areas where the sound pressure level of anthropogenic noise is above natural (wind and wave) sound –50 % of the time.

The data represents sound pressure level for the 125 Hz 1/3 octave band and is an average over the full water column.

Page 10: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

Data arrangements

?

S&C

Considered necessary: - Agreements on a responsible caretaker of the data sharing platform (draft caretakingagreement).- Monitor the soundscape planning tool.- Manage administration and quality control.

Other data demands such as AISA, VMS, wind, sound speed, need to be handled.

Page 11: SC Monitoring Program Noise · The map show the areas where the ... Monitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum Labor cost per deployment

All costs in EUROMonitoring cost per nation Denmark Germany Poland Estonia Finland Sweden Lithuania Total sum

Labor cost per deployment 5 769 4 800 3 500 4 000 24 100 18 829 3 500 64 498 Sum ships and consumables per deployment 1 544 12 500 2 250 4 500 15 318 9 856 2 250 48 218 Sum travel expenses per deployment 221 300 750 300 3 035 1 074 750 6 430 Total cost per deployment 7 534 17 600 6 500 8 800 42 453 29 759 6 500 119 146

Yearly cost: four deployments DK, DE, PL, EE, LT; two deployments FI, SE 30 136 € 70 400 € 26 000 € 35 200 € 84 906 € 59 518 € 26 000 € 332 160 €

Shared costs Minor Monitoring Company Costs

DSP* Initiation cost and development (60 h) Agreed responsible caretaker 6 000

DSP* Yearly administration (40 h) Agreed responsible caretaker 4 000

DSP* National data quality control (60 h) Agreed responsible caretaker 6 000

SPT** Initiation cost and development (100 h) Appointed party 10 000

SPT** Yearly administration Appointed party 5 000

SPT** Input of measured data Appointed party 2 000 Shared cost first year Shared cost subsequent years

Program coordination - initiation of operationl monitoring program (100 h) Agreed responsible caretaker 10 000 43 000 € 27 000 €* DSP= Data Sharing Platform Cost per nation (9 nations) Cost per nation (9 nations) ** SPT= Soundscape Planning Tool 4 778 € 3 000 €

Shared costs Minor Monitoring production of soundscape maps Company Costs

Modelling Initial cost for setting up automized input data Appointed party 10 000

Modelling Input data (not automized) Appointed party 10 000

Modelling Yearly cost for running the model Appointed party 35 000 Modelling cost first year Modelling cost subsequent years

55 000 € 45 000 €

Cost estimate for Minor Monitoring