Save the View Now Presentation at BBP CAC

Embed Size (px)

Citation preview

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    1/14

    Presentation To: Brooklyn Bridge ParkCommunity dvisory Council (CAC)

    February 3, 2015Congregation Mt Sinai

    250 Cadman Plaza West

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    2/14

    By the end of 2014 everyone could see something hadgone terribly wrong.

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    3/14

    Proposals must comply with all relevant land usecontrols. Such development controls include,

    without limitation , the MGPP , the FEIS , theLetter of Resolution, select requirements found in theNew York City Zoning Resolution relating to the

    preservation of the view plane from the Brooklyn

    Heights Promenade, the Design Guidelines andcertain other requirements discussed below.

    From the 2011 Pier 1 Request For Proposal

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    4/14

    The efforts include measures to fully protect the

    extraordinary views currently available within thepark and its surrounding environs. For instance, the

    design intends to protect views at the Fulton Ferryand Atlantic Avenue entries, as well as the view plane

    and the existing views of the Brooklyn Bridge and

    the harborfrom the Promenade

    . New structures

    have been carefully placed so that important

    viewsheds and protected view planes around the site

    have been fully respected .

    From the 2005 Final Environmental Impact Statement

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    5/14

    Parcel A

    1. The southern tall wall too close to the Promenade

    2. Incorrect base plane used

    3. Bulkheads added to the roof

    Parcel B

    4. Plans violate SV-1

    5. Plans show part of building over 55

    Major deviations from Park

    s Plan discover to date.

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    6/14

    As planned in 2005, unobstructed views of the Bridge wouldhave been visible from many points along the Promenade.

    View Line

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    7/14

    Instead the tall wall of the hotel complex was extendedcloser to the Brooklyn Promenade, breaking the view line

    New View Line 1

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    8/14

    Next, the base plane was raised. Even a small change at thebuilding ends up being a large change in the view.

    New View Line 2

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    9/14

    Finally, bulkheads have been placed on the roof, blockingeven more of the view of the Brooklyn Bridge.

    New View Line 3

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    10/14

    The difference between the top and bottom views lines is thetotal view lost because the BBPC failed in their duty to readand enforce their own Planning documents.

    StolenViews

    2005 Plan As built in 2015Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    11/14

    From the Design Guidelines: Pier 1 Building Envelope. Openwater views from all of Squibb Park were in the BBPC Plan.

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    12/14

    What happened to the water views from Squibb Park?

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    13/14

    Respondents are strongly encouraged to

    transition in height down to no more than

    34

    within 80 feet of the southern courtyard,

    limiting the height of the southern section of

    Parcel A, across Furman Street from

    Squibb Park , in order to protect the views of

    the East River from Squibb Park .

    From the 2011 Pier 1 RFP

    Save The View Now

  • 8/9/2019 Save the View Now Presentation at BBP CAC

    14/14

    BBPC, why was the height not limited to 34

    asspecified in the Design Guidelines and RFP?

    Save The View Now