Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
UNITS FROM 9,761 TO 68,743 SQ FTREADY FOR OCCUPATION
A13(T) DAGENHAM ESSEXSATNAV RM9 6RH
A new development by
THAMESGATEWAYPARK
THAMESGATEWAYPARK
www.thamesgatewaypark.com
NEW UNITS ON EAST LONDON’S PREMIER INDUSTRIAL DISTRIBUTION PARK ARE READY FOR OCCUPATION
THE DEVELOPMENT
Phase 3 of Thames Gateway Park is the continuation of a success story. The earlier two phases totaling 403,275 sq ft (37,465 sq m) are fully let.
This new phase provides a total of 199,675 sq ft in 9 units ranging from 9,761 sq ft to 68,743 sq ft designed for industrial or warehouse uses. Built to the highest standards each unit has finished office accommodation, full height loading doors and dedicated parking areas. Occupiers have the potential to create their own separate secure yard areas.
SUSTAINABLE APPROACH
The units are BREEAM rated as Very Good and have an EPC rating of A by incorporating a number of sustainability features within the specification.
PROVEN LOCATION
Situated off the Goresbrook Interchange at Dagenham Dock and adjoining Dagenham Dock station and a bus terminus. Thames Gateway Park is located in a premier distribution location, opening up the UK and mainland Europe. Huge investment in road, rail and air transport has provided the connectivity needed to support business growth, with 30% of the UK population accessible by road within 2 hours and most major European markets within 1 days drive.
PLANNING CONSENT
Planning consent has been granted for unrestricted light industrial / general industrial / warehouse uses B1 (C) / B2 / B8 use classes.
TERMS
Leasehold terms are available upon application.
A13
A1306
GORESBROOKINTERCHANGE
A13
A1306
GORESBROOKINTERCHANGE
A13
A1306
GORESBROOKINTERCHANGE
A13
A1306
GORESBROOKINTERCHANGE
A13
A1306
GORESBROOKINTERCHANGE
DAGENHAM DOCK
FORD RETAIL
GEO POST
GORESBROOKINTERCHANGE
STOBARTPARK
FORD BARKING POWER STATION
DST GROUP
ENCON
KEUHNE + NAGEL
GONDRAND
BRITVICHOVIS
LOOMIS
PHASE 4
BISHOP’S MOVESPX
PHASE 4COMING SOON
PHASE 3READY FOR
OCCUPATION
PHASE 4 OF 142,000 SQ FT IS ON THE WAY
Phase 4 comprising 3 more units of 35,000 sq ft, 52,000 sq ft and a divisible unit of 55,000 sq ft as shown on the masterplan is under way. Please contact the agents for further details.
IN GOOD COMPANY
Existing occupiers on Thames Gateway Park include Hovis, Monolith UK, Bishops Move, Bunzl, Gondrand UK, K N Drinks Logistics, Loomis UK and SPX Corporation. Fresh Direct and DG3 Group have already leased units on this new phase 3.
7 DOCK LEVELLERS
30.0m27.5m
27.9m
30.6m
30.1m
40m
Unit 13 Overflow Vehicle ParkARE - 1,140m2 (12,259ft2)
32m
33.5m
34.6m
47m 46.5m
64m33m
23m
40m67.5m58.3m
54.8m
50.6m
79.3m
67.7m
23m 23m
94m
29m
40m 40m 48.6m
55.2m
Unit 13
Unit 12Unit 11Unit 10
Unit 14B
Unit 14C
Unit 15
Unit 16
Unit 17
Unit 14D Unit 14E
Unit 14A
Cycles
Cycles
Cycles
Cycles
Cycles
Cycles
Cycles
RefuseRefuseRefuse
Refuse Refuse
Refuse
Refuse
Dagenham DockStation
HGV PARKING
HGV PARKING
Cycles
Cycles
Refuse
Refuse
Refuse
Refuse
LAYOUT PLAN
THAMESGATEWAYPARK
THAMESGATEWAYPARK
PHASE 2 LOOMIS PHASE 1 HOVIS
A13
A1306
GORESBROOKINTERCHANGE
PHASE 4 PHASE 3 READY FOR OCCUPATION
Bus Terminus
PHASE 2 SPX
LET
LET
The areas are gross external as measured on site. Dimensions are taken from the architects planning drawings.
SPECIFICATION
8.0m
Cle
ar in
tern
al h
eigh
t
Leve
l loa
ding
doo
rs
Doc
k lo
adin
g do
ors
8.5m
Cle
ar in
tern
al h
eigh
t
9.0m
Cle
ar in
tern
al h
eigh
t
10.0
m C
lear
inte
rnal
hei
ght
37.5
kN/m
² Flo
or lo
adin
g
50kN
/m² F
loor
load
ing
Offi
ce c
oolin
g sy
stem
Pote
ntia
l for
sec
ure
yard
Pote
ntia
l for
add
ition
al
offic
es a
t gro
und
floor
Pote
ntia
l to
com
bine
w
ith a
djoi
ning
uni
t
Total Unit area Offices Car spaces Yard depth(gross ex) (included) (m)
2
2
3
1
2
1
1
1
2 7
Unit 1022,941 sq ft 10% 20 27.35
Unit 1122,823 sq ft 10% 20 27.35
Unit 1227,354 sq ft 10% 25 30.00
Unit 14A12,232 sq ft 10% 12 30.60
Unit 14B16,186 sq ft 10% 15 30.60
Unit 14C9,831 sq ft 10% 10 30.20
Unit 14D9,761 sq ft 10% 10 30.20
Unit 14E9,804 sq ft 10% 10 30.20
Unit 1368,743 sq ft 6% 62 55.30 (min)
COMMUNICATIONS
North Circular/A406 4 miles
London City Airport 7 miles
M25 8 miles
Dartford River Crossing 9 miles
City of London 12 miles
RAIL (Dagenham Dock Station adjoins the site)
Barking – District and Ham & City Line 6 mins
Fenchurch Street – C2C line 20 mins
BUS ROUTE
EL2 Route Dagenham Dock Terminus (Stop EL)
FURTHER INFORMATION
For further information please contact the joint agents.
Chip [email protected]
Stephen [email protected]
Nick [email protected]
LOCATION
Thames Gateway Park is situated off the Goresbrook Interchange at Dagenham Dock on the A13(T) dual carriageway midway between M25 junctions 30 / 31 and the City of London. It adjoins Dagenham Dock station and a bus terminus.
Misrepresentations Act 1967 - Whilst all the information in these particulars is believed to be correct, neither the agent nor their client guarantee its accuracy nor is it intended to form any part of any contract. All areas quoted are approximate. All units are offered subject to contract and availability. July 2015.
A13T
A13T
A501
A205
A100
A102
A202A282
A127A127
A414
A414
A127A130
A130
A406
A406
A406
A503
A5
A3
A2
A2
A2
A1
A10
A10
A10
A12
A12
A12
A13
A12
A12
A12
A11
A20
A20
A23
A24
A1203
A3212
A1020
A1089
28
29
30
31
26
1A
1B
A205
27/6
1
2
M25
M25
M25
M11
M11
M25
DartfordNorthfleet
Dagenham
Rainham
Belvedere
Tilbury
Thurrock
Basildon
London Gateway
LondonCity Airport
Bexleyheath
Sidcup
Bromley
Poplar
EastDulwich
Belgravia
Marylebone
StratfordBarking
Ilford
Woodford
Romford
Upminster
Enfield
LONDON
Chigwell
Loughton
EastBarnet
Brentwood
DAGENHAMDOCK
A13
A1306GORESBROOKINTERCHANGE
CHO
ATS
MAN
OR
WAY
CHEQ
UER
S LA
NE
CHOATS ROAD
FOOTBRIDGE
BUSTERMINUS
Sat Nav Ref: RM9 6RH
Des
igne
d an
d Pr
oduc
ed b
y CO
RMAC
K 02
0 76
20 1
205
www.thamesgatewaypark.com
M25
M20
M20
M26
M40
M4
M2
M25
M25
M11
A1(M)
M25
M2
M20
M1
A1(M)
A1(M)
M23
M4
M3
M40
M5
M50
M5
M11
Drive Time 0-90 minutesDrive Time 90-180 minutes
TilburyThurrock
Basildon
DEMOGRAPHICS
Distance Population HouseholdsUp to 90 minutes 10,228,916 4,269,397
Up to 180 minutes 20,035,063 8,291,742