Towards Full Electrification Coverage by 2025
Kyoto University – University of Malaya (KU-UM) Rural Electrification Workshop
24 June 2019
Sarawak Rural Electrification
Chen Shiun, PhD., Vice President – RE Barry Law, Manager – RES Project & Planning Christopher Wesley Ajan, Manager – Sarawak Alternative RES
About Sarawak Energy
Our vision: To achieve sustainable growth and prosperity for Sarawak by meeting the region’s need for
reliable & renewable energy
Our values:
Courage Unity Respect Integrity Accountability
About Sarawak Energy
Started in 1921 as a unit in Public Works Department and is now a fully integrated energy development company and power utility wholly owned by Sarawak Government
Workforce 5,000 strong multidisciplinary team and largest employer of professional Sarawak talent
Lowest tariffs in Malaysia and amongst the lowest in ASEAN
Serving close to 3 million people across largest state in Malaysia. 680,000 accounts covering domestic, commercial, industrial and export customers
Largest generator of renewable energy in Malaysia 74% drop in carbon emission intensity for electricity production
75%
Electrified 110,000 rural households since 2009
5,449MW
2020
7,115MW
2025
500 kV
Balingian
Tg Kidurong 1
Interconnection West Kalimantan
Interconnection Sabah
Baleh
1,335MW
2010
Balanced Generation Mix Predominantly hydro and thermal for energy security
Tg Kidurong 2 8%
45% 36%
9%
2% 1%
73%
13%
10%
2% 1% 0.3%
63% 15%
20%
1% 1%
67%
17%
16%
1%
4,701MW
2017 Generation Type
Rural Electrification Coverage
• Starting with NKRA in 2009, rural electrification in Sarawak received intense focus and the coverage has grown significantly to 90.8% by end of 2018
55.9%
61.6%
64.1%
71.1%
74.5%
79.0%
82.8%
87.1%
89.8% 90.8%
92.5% 94.7%
96.7% 98.4%
99.6% 100.0%
0
2,500
5,000
7,500
10,000
12,500
15,000
17,500
20,000
22,500
55%
60%
65%
70%
75%
80%
85%
90%
95%
100%
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Ho
use
ho
lds
elec
trif
ied
in
eac
h y
ear
Co
vera
ge P
erc
enta
ge
RES Hybrids SARES Coverage
5
97% by 2020
Allocated fund approximately RM4b RM2.37b RM660m
Categories of un-electrified villages/ Villages Households
Cat. 1 – Grid Connectible 253 4,747
Cat. 2 – Grid Possible but Need Access 543 10,614
Cat. 3 – Remote Not Grid Connectible 191 5,296
Total 987 20,657
Full Electrification by 2025
Utilise EHV infra
Community solar
56%
2009 2018
91%
Accelerating Rural Electrification Projects
• To electrify 20,000 more households by 2020 • Rural coverage increases to 97% (statewide 99%)
• Total funding amount of RM 2.37 billion + RM 80 million
Expansion of grid infrastructure to rural areas
• For villages near to grid and/or more accessible by roads Grid
• EHV and MV Substations: 2 EHV and 9 MV substations at strategic locations as reliable sources of energy at rural areas
• MV Covered Conductor Lines: 33kV lines connecting main grid to new MV substations at rural locations
• RES Last-Miles: HT/LT lines that link up the rural villages to existing grid or new MV substations
Stand-alone systems for rural and remotest villages
• For those unreachable (not practical or economical) by grid infrastructure Off-grid
Additional or Late Applicants
• Distribution and service lines to new houses in the already-electrified villages ALAF
11
4
5
8
7
9
2
1 10
3
RPSS & RES A. Rural EHV Substations 1. Tatau 275kV 2. Kanowit 132kV B. Rural MV Substations 3. Sangan 4. Batang Ai 5. Ngungun 6. Julau 7. Pakan 8. Dalat 9. Tinjar 10. Sebauh 11. Bakelalan
SARES D. Off-Grid 12. Ulu Julau 13. Katibas/Bangkit/Tekalit 14. Bukit Mabong 15. Ng. Merit/Punan Bah 16. Telang Usan 17. Mulu/Bario
6
Grid & Off-grid Project Locations
Tatau 275kV Substation
Kanowit 132kV Substation
To reach 97% rural and 99% state-wide coverage • Grid-connect 800 villages • SARES systems for 200 villages
1
2
3
4
6
7
8
9
10
11
12 13
14
15
16
17
5
Grid Infrastructure Implementation
Phase 1 Phase 2 Phase 3
20 332 286
4,423 6,690 4,918
Q1/2019 Q2/2019 Q3/2019
Q2/2019 Q3/2019 Q4/2019
Q3/2019 - Q2/2020 Q4/2019 - Q3/2020 Q1/2020 - Q4/2020
9
RES Last Miles
Villages:
Households:
Survey & design:
Tender award:
Implementation:
EHV & MV Substations
2 EHV substations have been
awarded in Apr/May 19
2 MV substations have been
awarded in May/19
3 MV sub. tenders in Jun/19;
2 more each in Jul & Sep/19
MV CC Lines
• 4 tenders in May/Jun 19
• 4 more in Q3/Q4 19
Other Initiatives RURAL ROAD LIGHTING (Lampu Jalan Kampung-LJK) • Sarawak Energy is the government appointed
implementing agency to install road lightings along rural roads
INTERNAL HOUSE WIRING (IHW) • Sarawak Energy provides 3-year
zero interest payment plan for rural customers on IHW
• Subsidized meter fee from RM150 to RM80
CORPORATE SOCIAL RESPONSIBILITIES (CSR) • Sarawak Energy offers various CSR programs
in support of the rural communities and other government initiatives
11
TEMPORARY SUPPLY • Fast solution of temporary
relief for rural communities whilst waiting for permanent supply
RURAL TRANSFORMATION PROGRAM (RTP) • Small/medium one-off
projects for betterment of rural towns
OTHERS • Electricity connections to
rural schools, rural clinics and telco towers
• Electricity connections to individual rural houses via Additional and Late Application Fund
R&D Initiatives in Rural Electrification
MV Overhead Line Covered Conductor • Introduced to replace the conventional bare
overhead line • Robust and transient fault-proof against bad
weather, vegetation and animal contact • Minimize easement for construction • No Ferranti Effect
Service Substation Voltage Transformer (SSVT) • EHV to LV stepdown to
supply rural communities residing in proximity to EHV overhead lines
• Under conceptual study
Micro Grid Solar Hybrid Station Standalone micro grid providing electricity to rural villages, schools, shops and offices Most of the stations are designed to operate autonomously without on-site crew Utilise satellite telecommunication to monitor equipment conditions and performance of subsystems from a remote location
Solar/Microhydro Hybrid Stations
• Deployment of renewable energy systems at remote and rural areas
• About 8 MWp of solar installed capacity
• Year 2015: first solar hybrid station commissioning in Sarawak
• 39 solar hybrid stations installed to date
• Currently providing 24/7 electricity (no limit) to 78 villages with about 3,126 households
• 1 microhydro hybrid station at Long Banga of 640kW of hydro, supplying to 5 villages
0
2000
4000
6000
8000
2013 2014 2015 2016 2017 2018
Sola
r In
stal
led
Cap
acit
y (M
Wp
)
SARES Community Based Solar Schemes
• Villages in remote locations where state grid currently not possible
• Simple design and ease of O&M
• Limited disposable household income
• No charge/bill for electricity used
• Technical Support provided
SARES Capacity
• Power capacity 700 – 1000 W per household
• Daily energy up to 2000 Wh per household
• Able to cope for 3 continuous days of bad weather (no sun)
• System can be boosted or supplemented to support government functions
To provide a basic level of service for every household
• To preserve the lifespan of the battery to reach or go beyond its design life of 5 years
• Battery State of Charge (SOC) must not drop below 30% and warning will be issued when it reaches 50%
• By-passing feature for extra power during community events
Every door is installed with an energy limiter to control usage
16
Solar panel Inverter Battery Usage
Average cost is RM55-65,000 per household
SARES
Completed Villages
• 192
Completed Households
• 4,960
Benefited Population
• 39,670
Phase4 for 2019
•Awarded in May/Jun Year Villages Households
Cost (RM mil)
2016 58 1,388 75
2017 59 1,604 95
2018 75 1,968 110
2019 88 3,108 167
2020 145 4,205 230
2021 160 3,188 195
Total 585 15,461 872
SARES Solar Implementation
• Initial RM 500 million funding for 323 villages
• Additional SARES funding of RM110 mil to accelerate Rural Electrification
SARES – Implementation Process
Community engagement Transportation of materials Civil & structural construction Electrical installations
Solar installations Commissioning & training Handing over to community
Transportation to Remote Locations
Sustainability of SARES Scheme
• Community ownerships with long-term support commitments from government and utility companies
• Training and organization of O&M commitments of local community
Lessons Learned & Success Factors K
ey s
take
ho
lder
(go
vern
men
t-co
mm
un
ity-
uti
lity)
par
tner
ship
s • Community took ownerships and commitments
• Government committed on fund allocation including repair & replacement
• Utility (and contractors) to guarantee supports in long term A
pp
rop
riat
enes
s o
f d
esig
n f
ocu
sin
g o
n p
ract
ical
ity • Sizing is based on
basic amount but quality electricity supply
• Component design to suit limited transportation options
• Custom design to simplify O&M by unskilled local communities C
on
trac
tor
dev
elo
pm
ent
and
loca
l co
mp
eten
cy
• Partnerships to develop local capacity in solar system engineering, design and installation
• Developing off-grid solar training and certification of competencies
Thank You