SAP System Current Version For PCI Compliance Comments

SAP ECC SAP EHP3 for SAP ERP 6.0 SP2 on SAP NetWeaver 7.0 SP15 SAP EHP4 for SAP ERP 6.0 SPS14 on SAP NetWeaver 7.0 EHP2 SPS14 No Version upgrade. Only Technical (SPS)and Enhancement package upgrade

SAP PI SAP NetWeaver 7.1 SPS8 SAP NetWeaver 7.1 SPS17 No Version upgrade. Only Technical (SPS) upgrade

SAP BW SAP EHP 1 for SAP NetWeaver 7.0 SPS4 SAP EHP 1 for SAP NetWeaver 7.0 SPS14 No Version upgrade. Only Technical (SPS) upgrade

SAP SOLMAN SAP EHP 1 for SAP Solution Manager 7.0 SPS28 SAP EHP 1 for SAP Solution Manager 7.0 SPS31 No Version upgrade. Only Technical (SPS) upgrade

SAP System Recommneded

SAP ECC SAP EHP6 for SAP ERP 6.0 SPS9 on SAP NetWeaver 7.0 EHP2 SPS14

SAP PI SAP NetWeaver 7.4 SPS4 (Version Upgrade)

SAP BW SAP NetWeaver 7.4 SPS4 (Version Upgrade)

SAP SOLMAN SAP Solution Manager 7.1 (Version Upgrade)

Page 3: SAP Upgrade

Upgrade

• Why does it take long duration for upgrades ?

Page 4: SAP Upgrade

• The actual implementation of support packages (and even support package stacks) is usually not a labor-intensive task. In fact, the technical aspects of implementing a support package stack should not take more than a day.

Page 5: SAP Upgrade

• A single support package contains, on average, about 400 notes and a support package stack contains around 8,000 notes.

• Some implementations span across several support package stacks and therefore translate to the implementation of tens of thousands of code corrections at once.

Page 6: SAP Upgrade

• When applying such a massive change to your code, the main challenge consists of assessing the impact of that change on the behavior of the system. By definition, notes are supposed to only correct bugs, but in reality they potentially create new problems by changing standard functionality, introducing new bugs, or, most commonly, causing custom code to fail.

Page 7: SAP Upgrade
Page 8: SAP Upgrade

• Consequently, support package implementation projects include extensive testing that is aimed at verifying the correct operation of the pre-implementation functionality and identifying any new problems introduced into the system.

• Not surprisingly, efficient testing was also selected as one of the key challenges in a support package implementation project by nearly 39% of survey respondents.

• In regard to implementation timelines, the survey shows that support package implementations require an average of 73 person days, with the majority of the effort (42 days) associated with testing.