Santiago Solar: Case Study of a Metropolitan Solar Plant
Columbia University, September 2019
2Confidential
Introducing AME
Solar PV
Wind
Gas and LNG
e-nnovation
AME is an infrastructure developer with a strong
track record.
Focus on Gas and LNG infrastructure, combined
cycle power plants, solar PV and CSP and wind
generation technologies, and other innovative
technologies in the energy infrastructure space
including public transport mobility and energy
services
Co-owner with EDF of the 5th largest generator in
Chile. 1,200 MW in CCGTS and solar PV currently
operating in Chile and Peru, together with a
significant development pipeline of projects
including CCGT and renewable technologies
AME plans to balance its portfolio with 600 MW
of additional renewable capacity by 2023
AME
Santiago Solar: Case Study of a Metropolitan Solar Plant
4Confidential
AME
Santiago de Chile Population 6 million
Energy consumption 20,000 GWh/y
5Confidential
AME
Trade off – radiation vs transmission cost / risk
Santiago has extremely high
radiation by world standards, even if
it is 20% lower than northern Chile
6Confidential
0
20
40
60
80
100
120 1
,00
2,0
0
3,0
0
4,0
0
5,0
0
6,0
0
7,0
0
8,0
0
9,0
0
10
,00
11
,00
12
,00
1,0
0
2,0
0
3,0
0
4,0
0
5,0
0
6,0
0
7,0
0
8,0
0
9,0
0
10
,00
11
,00
12
,00
1,0
0
2,0
0
3,0
0
4,0
0
5,0
0
6,0
0
7,0
0
8,0
0
2.017 2.018 2.019
CM
g [U
SD/M
Wh
]
AÑO - MES
CMG por Bloque (Solo Solar)
Crucero - Solar
Diego de Almagro - Solar
Quillota - Solar
Trade off – radiation vs transmission cost / risk
Day time prices by injection node
7Confidential
Santiago Solar: A metropolitan solar project
45 km (27 miles) north of Santiago
8Confidential
AME
Timeline
9Confidential
AME
Santiago Solar site (pre-build)
10Confidential
AME
Timeline
11Confidential
AME
Til- til is an area of Santiago which has experienced significant levels of conflict between citizens and businesses in recent years
12Confidential
Meaningful and genuine dialogue with the community
• Respectful and genuine consultation
• Real changes made to project design to adjust to community concerns
• Contributions designed to be relevant to the project and address real needs
13Confidential
AME
Timeline
14Confidential
AME
In the 2014 tender
process, Santiago Solar
presented the lowest
adjudicated offer,
winning with a price of
US$79.88/ MWh.
15Confidential
AME
Timeline
16Confidential
AME
Santiago Solar site (pre-build)
17Confidential
AME
Santiago Solar site (pre-build)
18Confidential
AME
Santiago Solar site (pre-build)
19Confidential
AME
125 ha agricultural land improved
145 hareforested with native species
(360 acres)
(310 acres)
20Confidential
AME
Timeline
21Confidential
AME
0,0%
20,0%
40,0%
60,0%
80,0%
100,0%
120,0%
140,0%
160,0%
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
WIT
HD
RA
WA
L %
Real/Projected Withdrawal Objective Withdrawal Rate
Regulated client withdrawals real / projected 2010 - 2025
22Confidential
AME
-
50,0
100,0
150,0
200,0
250,0
300,0
en
e-1
0
abr-
10
jul-
10
oct
-10
en
e-1
1
abr-
11
jul-
11
oct
-11
en
e-1
2
abr-
12
jul-
12
oct-
12
en
e-1
3
abr-
13
jul-
13
oct
-13
en
e-1
4
abr-
14
jul-
14
oct
-14
en
e-1
5
abr-
15
jul-
15
oct-
15
en
e-1
6
abr-
16
jul-
16
oct-
16
en
e-1
7
abr-
17
jul-
17
oct
-17
en
e-1
8
abr-
18
jul-
18
oct
-18
en
e-1
9
abr-
19
jul-
19
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
CMg Quillota 220 CMg Crucero CMg Diego de Almagro
Marginal Prices in the SIC / SEN 2010 – 2019
23Confidential
AME
-
50,0
100,0
150,0
200,0
250,0
300,0
en
e-1
0
abr-
10
jul-
10
oct
-10
en
e-1
1
abr-
11
jul-
11
oct
-11
en
e-1
2
abr-
12
jul-
12
oct-
12
en
e-1
3
abr-
13
jul-
13
oct
-13
en
e-1
4
abr-
14
jul-
14
oct
-14
en
e-1
5
abr-
15
jul-
15
oct-
15
en
e-1
6
abr-
16
jul-
16
oct-
16
en
e-1
7
abr-
17
jul-
17
oct
-17
en
e-1
8
abr-
18
jul-
18
oct
-18
en
e-1
9
abr-
19
jul-
19
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
CMg Quillota 220 CMg Crucero CMg Diego de Almagro
Marginal Prices in the SIC / SEN 2010 – 2019
24Confidential
AME
Timeline
25Confidential
AME
Timeline
26Confidential
AME
Timeline
27Confidential
AME
28Confidential
AME
*100
* Based on average
home consumption
of 1.785 kWh /y
(Obrecht, 2016)
FACTS
&
FIGURES
29 Confidential
Award winning approach
Winner of the Association of Generators’ “Good PracticesContest for a more Sustainable Electric Future, 2018
Women of the Year Award, 2017, Ministry of Energy
Outstanding results in the Project Acceptance Index forlarge scale renewable energy projects, Ministry of Energy and Gernman GIZ