RECLAMATION DISTRICT 2114 RIO BLANCO SHIN KEE TRACT APPROXIMATE DISTRICT BOUNDARY (SAN JOAQUIN COUNTY GIS) RECLAMATION DISTRICT 2044 KING ISLAND RECLAMATION DISTRICT 2037 RINDGE TRACT RECLAMATION DISTRICT 2115 SHIMA TRACT RECLAMATION DISTRICT 2126 ATLAS TRACT RECLAMATION DISTRICT 2042 BISHOP TRACT W. RINDGE R D E. E IGHT MIL E RD N . S T E F A N I R D M A R IN E RS D R N . R I O B L A N C O R D T R I N I TY P K R UB I C O N A V C O S U M N ES D R R E GA T TA LN B E R R Y E S S A D R N O Y O L N IRO N C SCOTT C R E E K D R N O R T HRI D G E W Y AL M A N O R CI B L A CK B UT T E C I S T O N Y C R E E K LN P Y R A M I D D R B ASS R D N A TOMA C I T H O RNT O NR D § ¨ ¦ 5 Private Bridge N. Rio Blanco Bridge N. Rio Blanco Rd Bridge W. Eight Mile Rd Bridge LODI Stockton City Limit Lodi City Limit C A N A L CANAL C A N A L CAN AL C A N A L CA NAL DISA PPOINT M ENT SL OUGH B I S HO P CU T TELEP HONE C UT WHITE SLOUGH BEAR CREEK M O S H E R S L O U G H DISA PP O Manilo Silva Elementary Communications Tower Trinity Plaza Surgery Center DP-01 DP-02 DP-03 Bear Creek Relief Cut Bishop Relief Cut Golf Course Existing COS Pump Station Above 100 Year Flood Elevation L.C. = 15.3' L.C. = 14.0' L.C. = 14.0' L.C. = 14.0' L.C. = 13.4' L.C. = 13.2' L.C. = 12.0' L.C. = 11.5' L.C. = 7.5' L.C. = 12.0' Park Stefani Rd. Trinity Pk. Capetown Ln. Eight Mile Rd. Paradise Point Paradise Point PG&E Substation The Reserve Golf Course Lodi Sewer Treatment Plant Ponds PG & E H i g h V ol t age T r a n s m i s si on Li ne RD 2042-02 RD 2042-01 RD 2114 Project Levee Project Levee SA-01 SA-02 A.G. Spanos 10100 Trinity Pkwy 10.3' 10.3' 10.3' 10.3' 16.3' 0 + 00 1 0 + 0 0 2 0 + 0 0 3 0 + 0 0 4 0 + 0 0 5 0 + 0 0 6 0 + 0 0 7 0 + 0 0 80+0 0 90+00 100+00 1 1 0 +00 1 20+ 00 1 3 0 + 0 0 1 4 0 + 0 0 1 5 0 + 0 0 1 6 0 + 0 0 1 7 0 + 0 0 1 80 +00 190+ 00 200+0 0 2 10+0 0 2 20 + 0 0 0 + 0 0 1 0 + 0 0 2 0 + 0 0 3 0 + 0 0 4 0 +0 0 5 0 + 0 0 6 0 + 0 0 7 0 + 0 0 8 0 + 0 0 9 0 + 0 0 1 0 0 + 0 0 1 1 0 + 0 0 1 2 0 +0 0 13 0 + 0 0 14 0 + 0 0 1 50+00 0+ 0 0 1 0+ 00 2 0+00 3 0 + 0 0 4 0+ 00 50+0 0 6 0+00 7 0+0 0 80+0 0 90 +00 10 0+0 0 1 1 0 + 0 0 1 2 0 + 0 0 1 3 0 + 0 0 1 4 0 + 0 0 1 5 0 + 0 0 1 6 0 + 0 0 1 7 0 + 0 0 1 8 0 + 0 0 1 9 0 + 0 0 2 0 0 + 0 0 21 0 +00 22 0+ 00 230+00 2 4 0 + 0 0 2 5 0 + 0 0 2 6 0 + 0 0 S H 121°22'0"W 121°22'0"W 121°23'0"W 121°23'0"W 121°24'0"W 121°24'0"W 121°25'0"W 121°25'0"W 121°26'0"W 121°26'0"W 38°6'0"N 38°6'0"N 38°5'0"N 38°5'0"N 38°4'0"N 38°4'0"N 38°3'0"N 38°3'0"N 38°2'0"N 38°2'0"N q FIGURE Map Source: KSN, Inc. Map Date: 12-10-15 A1 Annex A - Bishop Tract & Rio Blanco Tract Flood Contingency Map RECLAMATION DISTRICT 2042 AND 2114 FLOOD SAFETY PLAN SAN JOAQUIN COUNTY OFFICE OF EMERGENCY SERVICES 711 N. Pershing Avenue Stockton, CA 95203 209-946-0268 1355 Halyard Drive, Suite 100 West Sacramento, CA 95691 916-403-5900 www.ksninc.com Flood Fight History 1913-14 King Island and Bishop Tract leveed in 1913-14. Early in this period Bishop Cut between districts was made. 1997 Heavy rains during period of December 30th to January 2 nd caused river stage of more than 34' at Vernalis gauge on San Joaquin River and 21.5' at Benson's Ferry gauge on the Mokelumne River. No problems on Bishop Tract. 2005 Old Dryland Levee on Bishop Tract removed after levees rebuilt for urban development. Special Considerations Bishop Tract Pumping Stations District maintains three pumping stations as shown on map. Pump station on Bishop Cut is above 100-Year Flood Elevation. Levee Patrol Plan Bishop Tract Superintendent John Meek coordinates patrol schedule and sectors. District relies on engineering firm on contract to supply patrol members. Patrols would meet at 10100 Trinity Parkway. District anticipates needing help from City of Stockton or other agency for patrols during extended high water or flood conditions. Rio Blanco Tract District relies on engineering firm to coordinate and supply patrol members. Patrol schedule and sectors would be determined at time of event. Patrols would meet at the RD 2114 Command Post located at the west side of the district. Communications will be with cellular telephones. Lath Protocol Red – Boil/Seepage Blue – Rock Slippage White – Slope/Levee Distress Flood Contingency Options Highwater Event The general floodfight strategy will be to maintain adequate patrol and flood fight primary levees. District will coordinate levee patrol and County will coordinate action planning between district and State/Federal agencies and provide logistical support. Actions · Coordinate and monitor patrol of levees · Coordinate with City of Stockton for patrol assistance as needed · Attend meetings of Metropolitan Floodfight Unified Command at Ag Center Command Post Failure of Levee on North Side of Bear Creek upstream from Bishop Tract This scenario will lead to flood waters moving west toward Bishop Tract east of Interstate 5. The general floodfight strategy will be to place emergency berms at underpasses on Interstate 5 to prevent flooding of district and create Bear Creek Relief Cut as shown to prevent floodwaters from backing up east of Interstate 5. Actions · Place and patrol emergency berms as shown at Interstate 5 underpasses · Make Bear Creek Relief Cut once impounded waters equalize with creek water elevations · Identify additional emergency pumps to dewater district in case berms fail to prevent floodwaters from entering district and/or backing up easterly · Prepare to make Bishop Relief Cut in case emergency berms fail to prevent floodwaters from entering district. Failure of Primary Levee on North Side of Bear Creek upstream from Bishop Tract (No Interstate 5 Emergency Berms or failure of Interstate 5 Emergency Berms) This scenario will lead to flood waters moving west into Bishop Tract from the east side of Interstate 5. The general floodfight strategy will be to make Bishop Relief Cut and install emergency pumping station to dewater district while protecting interior of primary levees. Actions · Make Bishop Relief Cut · Identify and place additional emergency pumps to dewater district · Protect interior of primary levees · Establish emergency access plan to King Island and Empire Tract using primary levee crown on south side of district. Failure of Levee on Reclamation District 2042 (Bishop Tract) This scenario will lead to flooding of Bishop Tract up to, and possibly east of, Interstate 5 on east side of district. The general floodfight strategy will be to prevent movement of floodwaters east of Interstate 5, and install emergency pumps to dewater district. Actions · Place and patrol emergency berms at Interstate 5 underpasses as shown on map · Repair break · Protect interior slopes of primary levees · Identify and install additional emergency pumps to dewater district · Establish and maintain access to RD2029 (Empire Tract) and RD2044 (King Island) by primary levee crown on south side of district · Monitor for increased seepage behind levees of adjacent districts Failure of Levee on Reclamation District 2114 (Rio Blanco) This scenario will lead to flooding of Rio Blanco Tract. The general flood fight strategy will be to protect interior of primary levees and install emergency pumping station to dewater district. Actions · Repair break · Protect interior slopes of primary levees · Identify and install emergency pumps to dewater district · Maintain access to district via Rio Blanco Rd bridge at southwest corner of district Delivery Points and Supply Staging Areas Pre-Planned Delivery Points DP-01 Paradise Point Marina – Bishop Cut & Disappointment Slough 121°25’4.00”W 38°02’44.66”N DP-02 Spanos Business Park – Eight Mile Road & Interstate 5 121°22’28.03”W 38°03’22.52”N DP-03 Agricultural Barn East of Bishop Cut 121°24’51.80”W 38°04’36.26”N Supply Staging Areas SA-01 Paradise Point Marina – Bishop Cut & Disappointment Slough 121°25’4.00”W 38°02’44.66”N SA-02 Agricultural Barn East of Bishop Cut 121°22’28.03”W 38°03’22.52”N Survey Information Basis of Elevations Elevations are based on the North America Vertical Datum of 1988 (NAVD88) 100-Year Flood Elevations Source: 1992 USACE Sacramento-San Joaquin Delta Hydrology Special Study Contours Elevation Source: 2007 DWR LiDAR Levee Crown Elevation Source: 2011 KSN Levee Profile Survey (Bishop Tract) 2007 DWR LiDAR (Rio Blanco Tract) Tactical Plans (Preliminary Engineering Designs) P.E.D.’s have not been prepared for RD 2042 and RD 2114. For tactical information/actions refer to the Flood Contingency Options text box. Dewatering Plan RD 2042 If Bear Creek Relief Cut has been made – Relief cut will remain open to allow impounded waters to exit City of Stockton east of Interstation 5 as river returns to normal elevations. Once flood waters will no longer drain through relief cut, the cut will be repaired along with breach(es). Upon closure of breaches and relief cut, place emergency pumping station on levee at site shown for flood dewatering. If Bishop Relief Cut has been made – Relief cut will remain open to allow impounded waters to exit district as river returns to normal elevations. Once flood waters will no longer drain through relief cut, the cut will be repaired along with breach(es). Upon closure of breaches and relief cut, place emergency pumping station on levee at site shown for flood dewatering. RD 2114 Upon closure of breach, place emergency pumping station on levee at site shown for flood dewatering. Legend 100 Year Flood Elevation Logistics Base Delivery Point Supply Staging Area Water Landing Helibase Helispot Historic Seepage Area Historic Levee Breach Relief Cut Historic Erosion Area Historic Slope Stability Levee Access Emergency Berm Dryland Levee Dryland Levee Critical Section Levee Levee Crown Elevation Spot Elevation Levee Mile-River Mile-Station Pump Station – Reclamation District Pump Station – Municipal Storm Pump Station – Emergency Pump Out Pump Station – Municipal Sanitary Structure (A-Agricultural, R-Residences (R# = number of homes), H-Hospital, S-School) Water Well Sanitary Sewer Lines Storm Drain Lines Water Lines Overhead Transmission Line Underground Fiber Optics Underground Lines Command Post District Boundary Elevation Contour Waterways/Channels A 0 Time/Date of Start of Incident Map Version 1 inch = 600 feet 0 2,000 1,000 Feet Communications Plan Field Command Posts RD 2042-01 Paradise Point Marina – Bishop Cut & Disappointment Slough 121°25’4.00”W 38°02’44.66”N RD 2042-02 Spanos Business Park – Eight Mile Road & Interstate 5 121°22’28.03”W 38°03’22.52”N RD 2114 Agricultural Barn East of Bishop Cut 121°24’51.80”W 38°04’36.26”N RD 2042 & RD 2114 Communications Equipment The District does not own communications equipment. Internal Communications Means of internal communications among district staff and levee patrols will be personal cellular telephones. Telephone numbers will be assigned for response functions at the time of activation. Communications with outside Jurisdictions Primary means of communications with outside jurisdictions will be personal cellular telephones. Secondary means of communications will be attendance at Metropolitan Unified Flood Fight Command meetings. Evacuation Plan Responsible Agencies The City of Stockton and the San Joaquin County sheriff’s department are responsible for alert and warning and evacuation. Public Safety Agencies Evacuation Plans Bishop Tract Evacuation Map is available at www.sjmap.org/evacmaps/private (password protected). Rio Blanco Tract will utilize the same map. Evacuation Maps for General Public Evacuation maps for general public with Bishop Tract are available at www.sjmap.org/evacmaps (Bishop Tract Evacuation Zone). Rio Blanco Tract will utilize the same map. Vertical Datum: NAVD88

SAN JOAQUIN COUNTY A1 Annex A - Bishop Tract & Rio … 2042 Bishop Tract RD...Annex A - Bishop Tract & Rio Blanco Tract Flood Contingency Map A1 RECLAMATION DISTRICT 2042 AND 2114

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SAN JOAQUIN COUNTY A1 Annex A - Bishop Tract & Rio … 2042 Bishop Tract RD...Annex A - Bishop Tract & Rio Blanco Tract Flood Contingency Map A1 RECLAMATION DISTRICT 2042 AND 2114

RECLAMATIONDISTRICT 2114RIO BLANCO

SHIN KEE TRACT

APPROXIMATE DISTRICT BOUNDARY(SAN JOAQUIN COUNTY GIS)

RECLAMATIONDISTRICT 2044KING ISLAND

RECLAMATIONDISTRICT 2037RINDGE TRACT

RECLAMATIONDISTRICT 2115SHIMA TRACT

RECLAMATIONDISTRICT 2126ATLAS TRACT

RECLAMATIONDISTRICT 2042BISHOP TRACT

W. RINDGE RD

E. EIGHT MILE RD

N.S

TEFA

NIR

D

MARINERS

DR

N.R

IOB

L AN

CO

RD

TRI N

ITYP

K

RUBI

CON

AV

COSUMNES DR

REG

ATTALN

BER

RYE

SSA

DR

NOYOLN

IRON C

SCOTT CREEK DR

NO

RTH

RID

GE

WY

ALM

ANOR

CI

BLACK

BU

TTEC

I

STONYC

RE

EK

LN

PYR

AM

IDD

R

BASS RD

NATOMA CI

THORNTON RD

§̈¦5

Private Bridge

N. Rio Blanco Bridge

N. Rio Blanco Rd Bridge

W. Eight MileRd Bridge

LODI

StocktonCity Limit

Lodi City Limit

CA

NA

L

CANAL

CANAL

CANAL

CA

NA

L

CANAL

DISAPPOINTMENT SLOUGH

BIS

HO

PC

UT

TELEPHONE CUT

WHITE SLOUGH

BEAR CREEK

MOSHER SLOUGH

DISAPPOINTMENT SLOUGH

Manilo SilvaElementary

CommunicationsTower

Trinity PlazaSurgery Center

DP-01

DP-02

DP-03

Bear CreekRelief Cut

Bishop Relief Cut

Golf Course

Existing COSPump Station

Above 100 YearFlood Elevation

L.C. = 15.3'

L.C. = 14.0'

L.C. = 14.0'

L.C. = 14.0'

L.C. = 13.4'

L.C. = 13.2'

L.C. = 12.0' L.C. = 11.5'

L.C. = 7.5'

L.C. = 12.0'

Park

Stefani Rd.

Trinity Pk.

Capetown Ln.

Eight Mile Rd.

Paradise Point

Paradise Point

PG&ESubstation

The ReserveGolf Course

Lodi SewerTreatment

Plant Ponds

PG&E

HighVoltage

Transmission

Line

RD 2042-02

RD 2042-01

RD 2114

Project LeveeProject Levee

SA-01

SA-02

A.G. Spanos10100 Trinity Pkwy

10.3'

10.3'

10.3'

10.3'

16.3'0+

00

10+0

0

20+0

0

30+0

0

40+0

0

50+ 0

0

60+0

0

70+0

0

80+00

90+00

100+00

110+00

120+00

130+00

140+

00

1 50+

00

160 +

00

170+

0 0

180+00

190+00

200+00

210+00

220+00

0+00

10+ 00

20+00

30+00

40+00

50+0

0

60+0

0

70+0

0

80+0

0

9 0+0

0

100+

00

110+00

120+00

130+00

140+

00

150+00

0+00

10+00

20+00

30+00

40+00

50+00

60+00

70+00

80+00

90+00

100+00

110+

00

120+

00

130+

00

140+

00

1 50+

00

160+

00

1 70 +

00

1 80+

0 0

190+

00

200+

00

210+00

220+00

230+

00

2 40+

00

250+

0 0

260+

00

S

H

121°22'0"W

121°22'0"W

121°23'0"W

121°23'0"W

121°24'0"W

121°24'0"W

121°25'0"W

121°25'0"W

121°26'0"W

121°26'0"W

38°6'0"N

38°6'0"N

38°5'0"N

38°5'0"N

38°4'0"N

38°4'0"N

38°3'0"N

38°3'0"N

38°2'0"N

38°2'0"N

qFIGUREMap Source: KSN, Inc.

Map Date: 12-10-15

A1Annex A - Bishop Tract & Rio Blanco Tract Flood Contingency Map

RECLAMATION DISTRICT 2042 AND 2114 FLOOD SAFETY PLANSAN JOAQUIN COUNTY

OFFICE OF EMERGENCY SERVICES

711 N. Pershing AvenueStockton, CA 95203

209-946-0268

1355 Halyard Drive, Suite 100West Sacramento, CA 95691

916-403-5900

www.ksninc.com

Flood Fight History

1913-14 King Island and Bishop Tract leveed in 1913-14. Early in this periodBishop Cut between districts was made.

1997 Heavy rains during period of December 30th to January 2nd caused riverstage of more than 34' at Vernalis gauge on San Joaquin River and 21.5'at Benson's Ferry gauge on the Mokelumne River. No problems on BishopTract.

2005 Old Dryland Levee on Bishop Tract removed after leveesrebuilt for urban development.

Special Considerations

Bishop Tract Pumping StationsDistrict maintains three pumping stations as shown on map. Pump station on BishopCut is above 100-Year Flood Elevation.

Levee Patrol Plan

Bishop TractSuperintendent John Meek coordinates patrol schedule and sectors. District relies onengineering firm on contract to supply patrol members. Patrols would meet at 10100Trinity Parkway. District anticipates needing help from City of Stockton or other agencyfor patrols during extended high water or flood conditions.

Rio Blanco TractDistrict relies on engineering firm to coordinate and supply patrol members. Patrolschedule and sectors would be determined at time of event. Patrols would meet at theRD 2114 Command Post located at the west side of the district.

Communications will be with cellular telephones.

Lath Protocol

Red – Boil/SeepageBlue – Rock SlippageWhite – Slope/Levee Distress

Flood Contingency Options

Highwater EventThe general floodfight strategy will be to maintain adequate patrol and flood fightprimary levees. District will coordinate levee patrol and County will coordinate actionplanning between district and State/Federal agencies and provide logistical support.

Actions

· Coordinate and monitor patrol of levees· Coordinate with City of Stockton for patrol assistance as needed· Attend meetings of Metropolitan Floodfight Unified Command at Ag Center

Command Post

Failure of Levee on North Side of Bear Creek upstream from Bishop TractThis scenario will lead to flood waters moving west toward Bishop Tract east ofInterstate 5. The general floodfight strategy will be to place emergency berms atunderpasses on Interstate 5 to prevent flooding of district and create Bear Creek ReliefCut as shown to prevent floodwaters from backing up east of Interstate 5.

Actions

· Place and patrol emergency berms as shown at Interstate 5 underpasses· Make Bear Creek Relief Cut once impounded waters equalize with creek water

elevations· Identify additional emergency pumps to dewater district in case berms fail to

prevent floodwaters from entering district and/or backing up easterly· Prepare to make Bishop Relief Cut in case emergency berms fail to prevent

floodwaters from entering district.

Failure of Primary Levee on North Side of Bear Creek upstream from Bishop Tract(No Interstate 5 Emergency Berms or failure of Interstate 5 Emergency Berms)This scenario will lead to flood waters moving west into Bishop Tract from the east sideof Interstate 5. The general floodfight strategy will be to make Bishop Relief Cut andinstall emergency pumping station to dewater district while protecting interior of primarylevees.

Actions

· Make Bishop Relief Cut· Identify and place additional emergency pumps to dewater district· Protect interior of primary levees· Establish emergency access plan to King Island and Empire Tract using primary

levee crown on south side of district.

Failure of Levee on Reclamation District 2042 (Bishop Tract)This scenario will lead to flooding of Bishop Tract up to, and possibly east of, Interstate5 on east side of district. The general floodfight strategy will be to prevent movement offloodwaters east of Interstate 5, and install emergency pumps to dewater district.

Actions

· Place and patrol emergency berms at Interstate 5 underpasses as shown onmap

· Repair break· Protect interior slopes of primary levees· Identify and install additional emergency pumps to dewater district· Establish and maintain access to RD2029 (Empire Tract) and RD2044 (King

Island) by primary levee crown on south side of district· Monitor for increased seepage behind levees of adjacent districts

Failure of Levee on Reclamation District 2114 (Rio Blanco)This scenario will lead to flooding of Rio Blanco Tract. The general flood fight strategywill be to protect interior of primary levees and install emergency pumping station todewater district.

Actions

· Repair break· Protect interior slopes of primary levees· Identify and install emergency pumps to dewater district· Maintain access to district via Rio Blanco Rd bridge at southwest corner of

district

Delivery Points and Supply Staging Areas

Pre-Planned Delivery Points

DP-01 Paradise Point Marina – Bishop Cut &Disappointment Slough

121°25’4.00”W 38°02’44.66”N

DP-02 Spanos Business Park – Eight MileRoad & Interstate 5

121°22’28.03”W 38°03’22.52”N

DP-03 Agricultural Barn East of Bishop Cut 121°24’51.80”W 38°04’36.26”N

Supply Staging Areas

SA-01 Paradise Point Marina – Bishop Cut &Disappointment Slough

121°25’4.00”W 38°02’44.66”N

SA-02 Agricultural Barn East of Bishop Cut 121°22’28.03”W 38°03’22.52”N

Survey Information

Basis of Elevations

Elevations are based on the North America Vertical Datum of 1988 (NAVD88)

100-Year Flood Elevations Source: 1992 USACE Sacramento-San Joaquin DeltaHydrology Special Study

Contours Elevation Source: 2007 DWR LiDAR

Levee Crown Elevation Source: 2011 KSN Levee Profile Survey (Bishop Tract)

2007 DWR LiDAR (Rio Blanco Tract)

Tactical Plans – (Preliminary Engineering Designs)

P.E.D.’s have not been prepared for RD 2042 and RD 2114.

For tactical information/actions refer to the Flood Contingency Options text box.

Dewatering Plan

RD 2042If Bear Creek Relief Cut has been made – Relief cut will remain open to allowimpounded waters to exit City of Stockton east of Interstation 5 as river returns tonormal elevations. Once flood waters will no longer drain through relief cut, the cut willbe repaired along with breach(es). Upon closure of breaches and relief cut, placeemergency pumping station on levee at site shown for flood dewatering.

If Bishop Relief Cut has been made – Relief cut will remain open to allow impoundedwaters to exit district as river returns to normal elevations. Once flood waters will nolonger drain through relief cut, the cut will be repaired along with breach(es). Uponclosure of breaches and relief cut, place emergency pumping station on levee at siteshown for flood dewatering.

RD 2114Upon closure of breach, place emergency pumping station on levee at site shown forflood dewatering.

Legend

100 Year Flood Elevation

Logistics Base

Delivery Point

Supply Staging Area

Water Landing

Helibase

Helispot

Historic Seepage Area

Historic Levee Breach

Relief Cut

Historic Erosion Area

Historic Slope Stability

Levee Access

Emergency Berm

Dryland Levee

Dryland Levee Critical Section

Levee

Levee Crown Elevation

Spot Elevation

Levee Mile-River Mile-Station

Pump Station – Reclamation District

Pump Station – Municipal Storm

Pump Station – Emergency Pump Out

Pump Station – Municipal Sanitary

Structure (A-Agricultural, R-Residences(R# = number of homes), H-Hospital,S-School)

Water Well

Sanitary Sewer Lines

Storm Drain Lines

Water Lines

Overhead Transmission Line

Underground Fiber Optics

Underground Lines

Command Post

District Boundary

Elevation Contour

Waterways/Channels

A

0

Time/Date of Start of Incident

Map Version

1 inch = 600 feet

0 2,0001,000Feet

Communications Plan

Field Command Posts

RD 2042-01 Paradise Point Marina – Bishop Cut &Disappointment Slough

121°25’4.00”W 38°02’44.66”N

RD 2042-02 Spanos Business Park – Eight MileRoad & Interstate 5

121°22’28.03”W 38°03’22.52”N

RD 2114 Agricultural Barn East of Bishop Cut 121°24’51.80”W 38°04’36.26”N

RD 2042 & RD 2114 Communications Equipment

The District does not own communications equipment.

Internal Communications

Means of internal communications among district staff and levee patrols will be personalcellular telephones. Telephone numbers will be assigned for response functions at thetime of activation.

Communications with outside Jurisdictions

Primary means of communications with outside jurisdictions will be personal cellulartelephones. Secondary means of communications will be attendance at MetropolitanUnified Flood Fight Command meetings.

Evacuation Plan

Responsible Agencies

The City of Stockton and the San Joaquin County sheriff’s department are responsiblefor alert and warning and evacuation.

Public Safety Agencies Evacuation Plans

Bishop Tract Evacuation Map is available at www.sjmap.org/evacmaps/private(password protected). Rio Blanco Tract will utilize the same map.

Evacuation Maps for General Public

Evacuation maps for general public with Bishop Tract are available atwww.sjmap.org/evacmaps (Bishop Tract Evacuation Zone). Rio Blanco Tract will utilizethe same map.

Vertical Datum: NAVD88