8/12/2019 Sample TAB Specification
1/14
AABC National Standards, 6thEdition
CHAPTER 22 - Specification
22.1 Overview
The Associated Air Balance Council Standard 2002 represents the requirements for Total
System Balancing !any references in this standard ha"e #een made to specifying testing
that is not considered #asic The follo$ing #asic specification is suggested $hen the Testand Balance Agency is directly contracted #y the %$ner &t is assumed that the TAB
Agency $ill #e retained in the design stage &f specific capacity testing of the chillers,
#oilers, cooling to$ers, or other components is required, the testing $ill #e specified and
referenced to this Standard
This specification is $ritten as an %$ner's specification Su#stitutions may #e made #y
including an allo$ance in the general contract, $ith the Agency selected #y the %$ner,
Architect and(or Engineer )hen the TAB Agency is retained #y the %$ner, thespecification should #e located in the *eneral +ro"ision section Section 0-660. of the
spec/ifications, $ith a contractor preparation specification in Section -000
The Contractor preparation section $ill #e located in the mechanical section to identify
$hat is required prior to testing and #alancing Startup, cleaning, and hydrostatic testingshould #e identified in this section so the Contractor $ill ha"e these items completed
prior to TAB +art of the preparation specification is a notification clause $ritten #y the
Contractor $hich $ill state the systems are operational
E"ery AABC Agency can assist in the preparation of the testing and #alancing
specification 1uring the design phase of the proect, the required testing ando#ser"ations can #e specified to meet the specific requirements of the proect The goal ofAABC is to pro"ide comfort to the end user at optimum performance le"els through Total
System Balancing
Section _________
Contractor Preparations for Testing and Baancing
1.! "enera Re#$ire%ents
+erform all $or3 required to prepare the #uilding 45AC systems for testing, adusting,
and #alancing indicated #y the Contract 1ocuments as follo$s
1.1 +reparation for #alancing of air systems
1.2 +reparation for #alancing of hydronic and steam systems
1.& +reparation of control systems
1.' Notification requirements #y the *eneral Contractor of systems readiness
2.! Scope of (or)
8/12/2019 Sample TAB Specification
2/14
2.1 Testing, adusting, and #alancing TAB. of the air conditioning systems
and related ancillary equipment $ill #e performed #y a certified,
independent third party, AABC Agency selected and employed directly #ythe %$ner 4o$e"er, the preparation for and corrections necessary for the
testing, adusting, and #alancing of these systems, as descri#ed herein, are
the responsi#ility of the Contractor
2.2 As a part of this proect Construction Contract, the Contractor shall ma3e
any changes or replacements to the shea"es, #elts, dampers, "al"es, etcrequired for correct #alance as ad"ised #y the TAB 7irm, at no additional
cost to the %$ner
2.& The Contractor shall pro"ide and coordinate the ser"ices of qualified,responsi#le su#/contractors, suppliers and personnel as required to correct,
repair, and(or replace any and all deficient items or conditions found
during the course of this proect, including the testing, adusting, and
#alancing period
2.' &n order that all systems may #e properly tested, #alanced, and adusted asrequired herein #y these Specifications, the Contractor shall operate the
systems at his e8pense for the length of time necessary to properly "erify
their completion and readiness for TAB
2.* +roect Contract completion schedules shall allo$ for sufficient time to
permit the completion of TAB ser"ices prior to %$ner occupancy The
Contractor shall allo$ adequate time for the testing and #alancingacti"ities of the %$ner pro"ided ser"ices, during the construction period,
and prior to Su#stantial Completion as defined in the 9niform *eneral
Conditions of this Construction 1ocument
2.+ The 1ra$ings and Specifications indicate "al"es, dampers, and
miscellaneous adustment de"ices for the purpose of adustment to o#tainoptimum operating conditions, and it $ill #e the responsi#ility of the
Contractor to install these de"ices in a manner that $ill lea"e them
accessi#le and readily adusta#le Should any such de"ice not #e readily
accessi#le, the Contractor shall pro"ide access as requested #y the TAB7irm Also, any malfunction encountered #y TAB personnel and reported
to the Contractor shall #e corrected #y the Contractor immediately so that
the #alancing $or3 can proceed $ith the minimum of delays
2., The scope of the $or3 as defined herein is indicated in order that the
Contractor $ill #e ad"ised of the coordination, adustment, and systemmodification $hich $ill #e required under the proect $or3 in order to
complete %$ner requirements for final TAB The TAB 7irm $ill not ha"e
a contractual relationship $ith any Contractor referred to herein, #ut $ill
#e responsi#le to the %$ner for the satisfactory e8ecution of the TAB
8/12/2019 Sample TAB Specification
3/14
$or3 The Contractor in his original #id shall allo$ for the costs required
to co"er all $or3 $hich may #e required in the TAB phases as defined
herein and as may #e necessary for the completion of the TAB $or3 asdefined #y the TAB 7irm
&.! Responsiiites of te Pro/ect Contractor
&.1 Te Contractor sa0
&.1.1 4a"e the #uilding and air conditioning systems in complete
operational readiness for TAB $or3 to #egin
&.1.2 The Contractor shall allo$ sufficient time for the TAB Agency toperform their contracted $or3 $ithin the construction schedule The
Contractor shall complete his $or3 #y systems or floors, $hiche"er is the
most efficient for testing systems After a$arding of the contract and the
Contractor has de"eloped a construction schedule, a TAB coordinationmeeting shall #e held $ith the TAB Agency, the Contractor and his
primary su#contractors (i.e. mechanical, electrical, #uilding automation,etc. to de"elop a testing schedule for the proect The Contractor shall
su#mit copies of the proposed schedule to the TAB Agency t$o $ee3s
prior to this meeting
&.1.& +romptly correct deficiencies of materials and $or3manship
identified as delaying completion of TAB $or3
&.1.' Be responsi#le for any added costs to the %$ner resulting from his
failure to ha"e the #uilding and air conditioning systems ready for TAB
$hen scheduled, or from his failure to correct deficiencies promptly
&.2 aciit Operationa Readiness
Complete operational readiness of the #uilding requires that the construction
status of the #uilding shall permit the closing of doors, $indo$s, and ceilings
installed, etc, to o#tain simulated or proected operating conditions
&.& H3AC Operationa Readiness
Complete operational readiness of the 45AC systems also requires that thefollo$ing #e accomplished
&.&.1 Air 4istri$tion Sste%s0
&.&.1.1 5erify installation for conformity to design All supply,
return, and e8haust ducts shall #e terminated and pressure tested
for lea3age as required #y the Specification
8/12/2019 Sample TAB Specification
4/14
&.&.1.2 All "olume, smo3e, and smo3e(fire dampers shall #e
properly located and functional All dampers shall ha"e tightclosure and open fully $ith smooth and free operation
&.&.1.& All supply, return, e8haust, and transfer grilles, registers,diffusers, and terminal de"ices shall #e installed and secured in a
full open position
&.&.1.' Air handling systems, units, and associated apparatus, such
as heating and cooling coils, filter sections, access doors, etc, shall
#e sealed to eliminate uncontrolled #ypass or lea3age of air 7inal
clean filters shall #e in place, coils shall #e clean $ith finsstraightened, #earings properly greased, #elts shall #e aligned and
tightened, and the system shall #e completely operational The
Contractor shall "erify that all systems are operating $ithin the
design pressure limits of the piping and duct$or3
&.&.1.* All fans supply, return, and e8haust. shall #e operating and"erified for freedom from "i#ration, proper fan rotation and #elt
tension: heater elements in motor starters to #e of proper si;e and
rating, as per the starter manufacturer: record motor amperage and"oltage on each phase at start/up, and "erify they do not e8ceed
nameplate ratings
&.&.1.+ All terminal units mi8ing #o8es and fan po$ered #o8es.shall #e installed and functional (i.e. controls functioning.
&.&.2 (ater Circ$ating Sste%s0
&.&.2.1 5erify installation for conformity to design
&.&.2.2 All piping shall #e terminated and pressure tested for
lea3age as required #y the specification All "al"es shall #e set to
their full open position, #ypass stop "al"es closed, and mi8ing
"al"es shall #e set to full/flo$ through the systems componentsAfter the system is flushed and chec3ed for proper operation, all
strainers shall #e remo"ed and cleaned The Contractor shall repeat
the operation until circulating $ater is clean and then the start/upstrainers shall #e discarded
&.&.2.&
8/12/2019 Sample TAB Specification
5/14
&.&.2.' 5erify that the electrical heater elements are of the proper
si;e and rating as per the starter manufacturer
&.&.2.* &n preparation of TAB all $ater circulating systems shall #e
full and free of air, e8pansion tan3s shall #e set for proper $ater
le"el, and all air "ents shall #e installed at high points of systemsand operating freely Chemicals shall #e added to closed systems
to treat piping and inhi#it corrosion The system static pressure
shall #e adequate to completely fill the system $ithout operatingthe pumps
&.&.2.+ Chec3 and set operating parameters of the heat e8changers
and control de"ices to the design requirements
&.&.2., +roper #alancing de"ices shall #e in place and located
correctly These de"ices include #ut are not limited to flo$ meters,
pressure taps, thermometer $ells, #alancing "al"es, etc
&.&.& A$to%atic Contros
&.&.&.1 The Control Contractor shall schedule a meeting $ith the
Engineer, TAB 7irm, and %$ner's representati"e for a pre/su#mittal re"ie$ to esta#lish that their interpretation is correct
&.&.&.2 The Control Contractor shall "erify that all control
components are installed in accordance $ith proect requirementsand are functional, including all electrical interloc3s, damper
sequences, air and $ater resets, fire and free;e stats, high and lo$
temperature thermostats, safeties, etc
&.&.&.& The Control Contractor shall "erify that all controlling
instruments are cali#rated and set for design operating conditions$ith the e8ception of components that require input from the TAB
Agency, #ut a default shall #e set The Control Contractor shall
cooperate $ith the TAB Agency and pro"ide all soft$are and
interfaces to communicate $ith the system
&.&.&.' The Energy !anagement System Contractor shall
thoroughly chec3 all controls, sensors, operators, sequences, etc#efore notifying the TAB Agency that the Energy !anagement
System is operational The Energy !anagement System Contractor
shall pro"ide technical support technicians and necessarycomputers. to the TAB Agency for a complete chec3 of these
systems
8/12/2019 Sample TAB Specification
6/14
&.&.&.* The 7ire Alarm 7A. Contractor shall thoroughly chec3 all
detection de"ices, sequences, inter/loc3s, etc #efore notifying the
TAB Agency that the system is operational this includes the7ireman's %"erride +anel. The 7A Contractor shall pro"ide all
detection de"ices fire and smo3e., complete $ith all smo3e ;ones
identified along $ith all alarm and e"ent chart de"ices identifiedThe 7A Contractor shall certify that the systems are totally
operational to the Contractor prior to the TAB #eginning
&.&.' Start-5p Report
The start/up report shall include the su#mitted and actual
8/12/2019 Sample TAB Specification
7/14
'.1.2 %ne set of mechanical floor plans of the conditioned spaces These
1ra$ings shall #e o;alid type #lue or #lac3 on light #ac3ground.
reproductions to facilitate mar3ing
'.1.& %ne copy of appro"ed su#mittal data on equipment installed, and
related changes as required to accomplish the test procedures as hereindescri#ed $ill #e furnished #y the Contractor
'.1.' +ro"ide all 45AC Control Communications soft$are $ith the appropriate licenses and hard$are interfaces
*.! "enera
*.1 1uring the progress of the $or3, tests shall #e made as specified herein
and as required #y authorities ha"ing urisdiction, including ?ocal
Authorities &nspection 1epartment, %$ner, %$ner's &nsuring Agency,
Architect, or Engineer Tests shall #e conducted #y the !echanical,+lum#ing, and 7ire +rotection Contractor as part of the $or3 of this
di"ision and shall include all qualified personnel, equipment apparatus,and ser"ices required to perform the tests
*.2 ?ea3s, damage, or defects disco"ered or resulting from tests shall #erepaired, or replaced to a li3e ne$ condition ?ea3y pipe oints, duct$or3,
etc, shall #e remo"ed and replaced $ith accepta#le materials
*.& All equipment and instruments required for tests as $ell as additionalthermometer $ells, gauge and instrument connections shall #e installed at
no additional cost to the %$ner
*.' Su#mit si8 copies of each complete test report to the Engineer for re"ie$
and send t$o copies of the report to the %$ner
Section _________
Testing and Baancing
1.! "enera Re#$ire%ents
1.1 S$%ittas
The TAB Agency shall su#mit an agenda descri#ing procedures for
1.1.1 7ield o#ser"ation reports
1.1.2 An o"er"ie$ of system TAB procedures
8/12/2019 Sample TAB Specification
8/14
8/12/2019 Sample TAB Specification
9/14
8/12/2019 Sample TAB Specification
10/14
'.1.* +erform a pre#alance site re"ie$ and su#mit a $ritten report
'.1.+ 1uring the #alancing process, as a#normalities and malfunctions of
equipment or components are disco"ered #y the TAB personnel, the
Construction &nspector, Architect, Engineer, and %$ner shall #e ad"isedin $riting so that the conditions. can #e corrected #y the Contractor The
$ritten document need not #e formal, #ut must #e understanda#le and
legi#le The TAB 7irm shall not instruct or direct the Contractor in any ofthe $or3, #ut $ill ma3e reports as are necessary to the Construction
&nspector, Architect, Engineer, and %$ner
'.2 ina Air Baance
)hen systems are complete and ready for operation, the TAB Agency $ill
perform a final air #alance for all air systems and record the results The
"olume of air for the supply, return, e8haust, and outside air equipmentand terminals $ill #e tested and #alanced $ithin the tolerances of the
AABC Standard Air handling unit and fan "olumes shall #e adusted #ychanging fan speed Air distri#ution de"ice "olume shall #e adusted using
the spin/in damper for fle8i#le duct connected de"ices and the damper for
duct connected de"ices Air distri#ution de"ices shall #e #alanced $ith airpatterns as specified 1uct "olume dampers shall #e adusted to pro"ide air
"olume to #ranch ducts $here such dampers are sho$n The general scope
of #alancing #y the TAB Agency $ill include, #ut is not limited to, the
follo$ing
'.2.1 7ilters Chec3 air filters and filter media and #alance only systems
$ith essentially clean filters and filter media
'.2.2 7an Speed !easure and record
8/12/2019 Sample TAB Specification
11/14
'.2.+ Coil Temperatures Set controls for full cooling and for full heating
loads
8/12/2019 Sample TAB Specification
12/14
8/12/2019 Sample TAB Specification
13/14
'.*.9 5erify the operation of all interloc3 systems
'.*.: +erform "aria#le "olume system "erification to assure the systemand its components trac3 $ith changes from full flo$ to minimum flo$
'.+ Stairwe Press$ri
8/12/2019 Sample TAB Specification
14/14
*.* &f -0 of the random "erification tests demonstrate a measured flo$
de"iation of -0 or more from that recorded in the certified test and
#alance report, the report shall #e automatically reected &n the e"ent thereport is reected, all systems shall #e readusted and tested, ne$ data
recorded, a ne$ certified test and #alance report su#mitted, and a ne$
inspection test made, all at no additional cost to the %$ner
*.+ 7inal Acceptance $ill occur after successful completion of the TAB
"erification process