Upload
rubbyrd
View
215
Download
0
Embed Size (px)
DESCRIPTION
construction
Citation preview
IIII
III)
BILL
A
10 - EXTERNALWORKS II
I0 WATERDRAINAGE - cont'd I
IroN P0ND ]
vation for detention pond and discharge outlet and get out,ring, compact and remove surplus materials off site to's own dump.
rick of25mm coarse aggregale, l
reinforced concrete (Grade 25) as described frlled intoand well packed around st,gel reinforcement (form\ilork
neasured separately ) in:
DETENT
Bulk excrsides tapContract<
l50mm I
Vibratedformworland steel
Drain
Sawn for nwoik as described to:
Drain
Steel ftembeddtwelded'in (meas
lric reinforcement (BRC) well-lapped at joints andI in r:nnnrele wnrlc chall lre hard rlrarrm nr anlrl rnllad ctecl
'ire mesh to MS 144:1987 anrd MS 145:1987, as desclibedred nett-allow for lans) :
Drain
Approlplanted
Supply
\I/ominc Qimlr^a.d fnr T\o+zra+i^- D^-,1 --,1
ground, as per Engineer's detail
fix m.s. faslr screed to r.c. drain, as per Engineer's detail
ln eniqtino drain
To Colleotion
atu
1272
435
l3
t37
I
ITEM
Unit
MS
MC
MS
NO
NO
10/16
D
E
F
10. EXTERNAL WORKS
for drain pipes, part birckfill, compact and remp'vesite to Contractor'd own
sewer pipe laid in trench to varying depth
sewer pipe laid in tr,engh encased in andl50mm ick concrete (Grade 25) reinforced with one layer of
65 I round
wide exceeding 900rnm deep but not
1200mm deep but not exceeding 1500mm do
1.50rl deep but not exceedigg 3.00m deep for
wide exceeding 150Clmm deep but not
1800mm deep but not txceeding 2100mm do
sand bedding under sewerr pipe
ick Selected well compacted granular backfill to top of
clay (VC) pipes and fittingto Sirim approved completejunctions, diminishing pieces, flanges and joints and
l800mrn
Ditto
25Omm
76Omm
bends,
MR
MR
t22
219
159
48
r37
416
MR
MR
MC
MC
10/18
.|
atu
IO - T;XTERNAL WORKS
es shall be constructed in accordance with the Engineer,sshall comply strictly wit'b the requirements of the Local
the Jbllowing items on manhol'es reference should be made toarry other relevant drawingfor details.
Diameter circular drop manJhole constructed of 150ryn(Grade 25) as described base reinforced with trvo
65, 150mm thick r.c. wall reinforce with one lavercourse 225mm ttrick brickwall, 16mm thick high
ing on all inside faces, l50mm thick r.c. topwith one layer of BRC 61, mass concete to place
50mm thick lean concrete (Grade l5), standmdiron steps staggered at 300nun centres with 87.5mm castfornr openings at wall for: inflow and outflow
and including all excavation, part backfill,of surplus excavated materials, concrete benching, hal
W chrannel, 90 degree C.I. bend with masstee, formwork, forming alll outlets and connections
works as detailed in E:ngineer's drawing. (Manholeseparately)
Drop le exceeding l800mm but not exceeding 2l00mmto invert
Drop e,xceeding 2l00mm but not exceeding 2400mmto invert
Unit
NO
NO
Rate10/19
Antount
(RM)
ae.BILL N IO.EXTERNAL WORKIJ
Diameter circular manhole constructed of l50mm th(Grade 25) as descrlbed base reinforced with two laver ol50mrn thick r.c. wall reinforce with one layer of BRC225mtn thick brickwall, l6mm thick hish alumina
con0reteBRC 65
course
fiame incover in
at wall for inflow and outflow pipes, rebated openingall excavation, part backfill, removal and disposal
on all inside faces, 150mm thick r.c. top slablayer of BRC 61, mass concre[e to place cover correct Iick leam concrete (Grade l5), standard U shape cast
at 300mm centres with 8?.5mm cast into walls.
ing and pointing in cement and sand (l:3) and sealirrgand fine sand complete with protective coating.
invert
materials, concrete benching, formwork, fornrand connections and all necessary works as detailerldrawing. (Manhole cover measured separately)
exceeding 900mm but not exceeding l200mm deep
exceeding l200mm but not exceeding l500mm deep
exceeding l500mm but not exceeding lgOOmm deep
heavy duty circular cast iron manhole cover c/wframe to JKR standard detail and requirements and
ing and pointing in cement and sand (l:3) and sealirrgand fine sand complete with protective coating.
medium duty circular cast iron manhole cover c/whlnges frame to JKR standard detail and requirements and
t 9
l l
hinges aframe incover in
J I
II
To Collecti,on :
Uu!
NO
NO
NO
NO
NO
Rate10t20
Amounl
(RM)
{
(
lO.EXTERN
hleatrnent oiant svstem-I works,, piling works, mechanicgates, aNcess road and etc, asand subj$ct to Engineet's approv
10t21Alnount-T-_
IRM)
tI
l
tt
t
ae.IO - I],XTERNAL WORKT;
and fittings including all bends, tees, junctions,block, diminishing pieces,.flanges, end caps and joints
iamet,:r HDPE pipe (PN-l:2.5) laid in trenchwell compacted sand or granular material, partof surplus excavated materials from site (Typical p
HDPE pipe (PN-1:2.5) laid in trenchwelll compacted sand or granular material, part bacl<fiIof surplus excavated materials from site (Typical pipe
road c;rossing)
HDPE inletpipe (PN-l2.5) and fitrings includinganchor/thrust block, diministring pieces, flanges, joints,llar, m.s. brackets, pipe holder and all necessary
and connection (To Elevated water tank)
HDPE pipe (PN-12.5) laid in renchwell compacted sand or gpnular material; partof surplus excavated materials from site (Typical
iamel,er HDPE pipe (PN-12.5) Iaid in trenchwell compacted sand or gSanular material, partof surplus excavated materials from site (Typical
road crossing)
HDPE inletpipe (flrt-Ii.s) and fitrings includinganchor/thrust block, diminishing pieces, fl anges, joints,ar, rr.s. brackets, pipe holder and all necessaryand connection (From Elevated water tank)
l lOmm
ametr:r HDPE scour & overllow pipe and fittingsall berrds, anchor/thrust block, diminishing pieces, flangps,
collar, m.s. brackets, pipe holder and all necessaryand connection (dischargecl to nearest drain)
Allow interconnection pipe and valves between water tanks.
A for p,ipe jacking works (accross main road) for I 60mnrHDPE connect to existing water govemment's main supply
:uo
64
30
30
8
I
J
system iand toolupon
luding transportation, handling pipe jacking equipmenton an about the site and subsr:quent removal from the site
of the works, temporzrry casing pipe, cast iron teeconnection, temporary manhole, approval to localand.tabatan Air. ( approximiate lOm long)
tI!*I
I
It
l60mm
hench)
l60mm
l60mm
puddle
l lOmm
trench)
l lOmm
hench
l lOmm
puddle
branch
To Collection :
Unit
MR
MR
NO
Rate10t22
(
ll valves
valve
Grade I
concreteluding
isposal
160mmcontrol,and tee
160mmflanged
4
A
BILL IO- TIXTERNALWORKS
be':onstructed in acc ordance. with theEngineer's Draw ing:sstrictly with the requirements of the Local Authorities.
thef<tllowing items onvalve and chamberbe made to the relevant drawings for details
lve and
r,lruumm x /)urnm x lJ)unm oeep nternauyof l20mm thick concrete (Grade 25) as described base,with t'ro layer of BRC ,{6 orAS at l50mm c/c, 120mm
reirnforced with lOmm diameter m.s. reinforcement trarcentres bothway, bitumin fill, 50mm thick lean concrete) blinding, 225mmthick solid brickwall finished with
(1:3) plastering on bothsides, 3l0mm x 457mm castduty siurface box cover chained type, lifting hook, mass
(320) with l2mm diameter m.s. bolts with andll excavation, excavation, parrt backfill, removal andsurphls excavated materials, concrete benching,and forming outlets seal with biturninous sealing
iameter cast iron sluice valve complete with valvevalve spindle, verticall short piece flanged
and joints to pipes irrcluding fixing
x 900mm long flange spigot piece, both endjointing to valve and pipes including 50mm
strap, concrete support, form:ing opening inI and sealing in bituminous compound
sluice valve indicator plantecl into ground, as perdetail
To Collectiion:
Qil, Ilnit
NO
NO
NO
NO
Rate10t23
Amount
(RM)
BILL 10 - TIXTERNAL WORKS
]ULATION SYSTEM
PILLAR YDfu|NT VALVES AND CITAMBERS
fire shall be constructed in accordance with the Engineer'sshall strictly to the requirements of Jabatan Bomba,
litalaysia
ii) When
Hydrantintemal
the following item on Jire hydirants reference should be mcrdethe dratings for detalls
I
alve Clhamber 900inm x 750nrm x l350mm deepconsisliing of 120mm thick concrete (Grade 25) asbase n:inforced with two laver of BRC A6 or A8 at
l20mm thick top slab reinfrrrced with lOmm diameterrem€,nt bar at 100mm centres bothway, bitumin fill,lean concrete (Grade 15; blinding, Z25mmthick solid
finisherd with cement sand (l::3) plastering on bothsides,508mrn cast iron heavy duty siurface box cover chained
hool<, mass concrete plinth (G20) with 12mm diameterwith and including all excavation, excavation, part
val and disposal of surplus excavated materials,formworks and formins outlets seal with
sealine comoound.
pillar hydrant with twin 62l,lZmm diameter outlet andiameter vertical inlet complete with blank caps, brass
concrete, painting, l00mur diameter flange pipe pieceto 1.00mm diameter pipe
cast iron hydrant sluice valve complete withl, e.rtended valve spindle, ,rertical short piece flanged
and joints to pipes :including fixing
l00mm
l00mm
l00mm
leaving
x 900mm long flange spigot piece end flahgedto'valve and pipes including forming opening in
wall and sealing in bituminous compound
x 90 degree duck foot bend, both end flanged,in and including mass concretr3 (Grade 20) seating,
iectiions at both ends
fire hydrant indicator planted into ground, as perdetail
and
To Collection :
ae Unit
NO
NO
NO
NO
Rste10t24
Amou!!(RM)