Upload
kyle-fant
View
219
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Final presentation for Saltworks fabrication.
Citation preview
SaltworksFall 2011
Studio:Zephyr Anthony
Andrew DavisKyle Fant
Xiaoshuang HuAllyson JustmannAndrew McCready
Kelly PeoplesXiaofei RenBo Sheng
Jody SmithBen StephensonTommy Watkins
Duo Yu
Instructors:Joe MacDonald
Arash Adel
Reticulated Form
➜ Con-Figurative Processes (Bottom-Up vs Top-Down)
➜ Part to Whole Relationships
➜ Base Unit and Aggregation: Global and Local Modulation
➜ Relational Architecture
➜ Armature, Surface, and Interface
DDescription CostBaltic Birch x 60 $3,992Polypropylene x 13 $2,238Rubber x 300' $527Screws $111Crimps $146Dark Stain $189Home Depot $300Home Depot $433Sligo Steel $387LED lights $450
Sample Crimps, Rubber, etc. $58
Model Materials $220
$9,051
Budget
10,000 allotment
Communication
hierarchical design process / design team
Vs.
bottom-up design process, collaborative design team
Grasshopper Definition
surface analysis
bowl construction
slat construction
spacer construction
end cap construction