Page 1: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS

SAGE Suite Subcontract Module Project - Campus ImpactsJason Myers – Business Systems AnalystOffice of Research Information Services (ORIS)

Page 2: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS Subcontract Module Project Goals

GOAL: Improve subcontract budget accounting by automating subcontract F&A cost recovery

• Automate the calculation of F&A Subcontract expenditures in FAS

• Ensure subcontract PO Requisition Number and Budget Number entered in SPAERC match the numbers entered in the Purchasing and Accounts Payable System (PAS) through systematic validation

• Enable recording and tracking of key subcontract F&A data in SPAERC

• Synchronize key subcontract F&A data stored in SPAERC with data in Financial Accounting System (FAS) on a daily basis 2

Page 3: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISCurrent: Process and Systems State - Summary

• Only direct costs for subcontracts are automatically updated in FAS.

• The subcontract amount subject to UW F&A costs is set up as an encumbrance in FAS.

• GCA manually enters actual F&A costs for subcontracts as Journal Vouchers (JVs).

3

Page 4: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISCurrent: Subcontract F&A Encumbrances

4

• Subcontract F&A costs are set up as an encumbrance under Restricted Funds (line item 37-99).

• The 37-99 encumbrance is liquidated once the F&A expenditures are manually charged off.

Page 5: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS Current: Subcontract F&A Transactions

5

GCA manually enters a Journal Voucher (JV) to charge off actual F&A costs for a subcontract.

Page 6: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISFuture: Processes and Systems - Summary

• For each subcontract, OSP will specify the amount subject to UW F&A costs in SPAERC, and that value will be interfaced to FAS.

• Subcontract F&A costs will be charged off automatically using the budget’s F&A cost rate.

• The 37-99 subcontract F&A encumbrance will be removed, eliminating the current double encumbrance issue.

• Manual entry of Journal Vouchers (JVs) to account for subcontract F&A costs will no longer be necessary.

6

Page 7: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS Future: System and Process - SPAERC

OSP will enter the subcontract amount subject to UW F&A costs for each subcontract in SPAERC (SAGE database).

7

Page 8: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS

Future: SPAERC & FAS Systems – Interface

The subcontract amount subject to UW F&A cost for each subcontract in SPAERC will be interfaced to FAS Monday – Friday at 6 pm.

8

Page 9: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISFuture: Subcontract F&A Encumbrances

9

The current practice of including the F&A encumbrance for sub-contracts under the Indirect Costs (line item 25-99) will be maintained, However, The double-encumbrance under 37-99 will be eliminated.

Page 10: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISFuture: My Financial Desktop – Subs F&A Transactions

10

F&A transactions for subcontracts will display in line item 25-99, along with all other F&A transactions.

Page 11: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORISSeptember SAGE ReleaseSubcontracts Module Project

• Implementation of the features to enter and manage the subcontract amount subject to UW F&A costs, amongst other OSP and GCA system enhancements, is planned for 9/21.

• Data reconciliation and clean-up planning is in progress with the expectation of reconciling and adjusting data in early October.

• Once data is reconciled and adjusted Campus users will be notified of the intended date of activating the SAGE to FAS interface for automating subcontract F&A expenditures.

11

Page 12: SAGE Suite  Subcontract  Module Project -  Campus Impacts

ORIS

QUESTIONS?

12