10
Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping and aux. Systems HV / LV power distribution & Automation system Mechanical Electrical Piping Director, Projects Sales Manager Export Finance & L/C Manager Legal Dept. Manager Procurement Manager Quality Manager Client Project Manager & Project Management Staff P.M. DMH P.E. Rolling process P.E. Mech. Equipment eng. P.E. Hydraulics Lubrication P.E. Piping Utilities P.E. Instrumentat ion P.M. DCC P.E. Combustion process P.E. L.V. Distribution P.E. Automation P.M. DE P.C. WTP process P.E. Civil & structural des. P.E. Interconnectin g piping P.E. Instrumentatio n P.E. HVAC P.E. Firefighting system P.E. Compressed air system P.C. Workshop laboratory eq. P.C. Cranes P.M. DA Process Coordinator P.E. Substation, HV - LV power distrib. P.E. Interconnectin g cabling P.C. Automation system level 1 P.C. Automation system level 2 P.M. DCM P.E. Meltshop process P.E. Mech. Equipment engin. P.E. Hydraulics lubrication P.E. Piping utilities P.E. Instrumentatio n Site Technical Office Field Engineers Civil and infrastructu re construction Supervisor Erection Supervisors Startup and commissioning Team Material Man Client Site manager & Staff P.C. Spare parts P.C. Packing & Shipping P.C. Training P.C. Operation, maintenance & safety manuals P.C. Expediting / testing (E LE) P.C. Quality Control P.C. Manufacturing & expediting P.C. Procurement cc Danieli Construction & Commissioning (UMAC) P.M. Construct Erection & Commiss. Site Manager Deputy Site Manager Danieli Engineering (DE) Project Manager Project Planning & Control Contract Administr. Automation Aux. Systems Turn-key project Key-Personnel Organisation chart

Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Embed Size (px)

Citation preview

Page 1: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Safety Officier

Planning & quantity Survey

Quality Assurance Eng.Accounting & Cost control

Building erection

Mechanical equipment

Reheating furnacePiping and aux. Systems

HV / LV power distribution & Automation system

Mechanical

Electrical

Piping

Director, Projects

Sales Manager

Export Finance & L/C Manager

Legal Dept. Manager

Procurement Manager

Quality Manager

Client Project Manager & Project Management Staff

P.M. DMH

P.E. Rolling process

P.E. Mech. Equipment eng.P.E. Hydraulics Lubrication

P.E. Piping Utilities

P.E. Instrumentation

P.M. DCC

P.E. Combustion processP.E. L.V. Distribution

P.E. Automation

P.M. DE

P.C. WTP process

P.E. Civil & structural des.

P.E. Interconnecting pipingP.E. InstrumentationP.E. HVAC

P.E. Firefighting system

P.E. Compressed air system

P.C. Workshop laboratory eq.

P.C. Cranes

P.M. DA

Process CoordinatorP.E. Substation, HV - LV power distrib.P.E. Interconnecting cablingP.C. Automation system level 1

P.C. Automation system level 2

P.M. DCM

P.E. Meltshop process

P.E. Mech. Equipment engin.

P.E. Hydraulics lubrication

P.E. Piping utilitiesP.E. Instrumentation

Site Technical Office Field Engineers

Civil and infrastructure construction Supervisor

Erection Supervisors

Startup and commissioning Team

Material Man

Client Site manager & Staff

P.C. Spare parts

P.C. Packing & Shipping

P.C. Training

P.C. Operation, maintenance & safety manuals

P.C. Expediting / testing (E LE) P.C. Quality Control

P.C. Manufacturing & expediting

P.C. Procurement cc

Danieli Construction & Commissioning (UMAC)P.M. Construct Erection & Commiss.

Site Manager

Deputy Site Manager

Danieli Engineering (DE) Project Manager

Project Planning & Control

Contract Administr.

Automation

Aux. Systems

Turn-key project Key-Personnel Organisation chart

Page 2: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

SCHEDULE (LEV. III)

WORK BREAKDOWN

PRICE BREAKDOWN

JOB POSITION (TPC/JET)

INSPECTION TEST SCHEDULE (ITS)

CASH FLOW

(PART 2) (PART 3)

RESPONSIBILITY

CONTRACT & FINANCING TOOLS REQUIREMENTS

MASTER PLANT LIST

TECHNICAL SPECIFICATIONCONTRACT SCHEDULE PAYMENT METHOD/FORMALITIES

PICS (PROJECT INTEGRATED CONTROL SYSTEM)

General Management Flow Chart (part 1)

Page 3: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

OUTSIDE (E/LE) INSIDE (I)

(PART 3)

ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)

TECHN. DOCUMENTS

JOB POSITION (TPC / JET) from part 1

MATERIAL REQUIR.

PROCUREMENT

PURCHASE & ORDERS

MANUFACTURING

General management Flow Chart (part 2)

Page 4: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

INSPECTION & TESTING (NOI/IRE/LOC/QCTM)

OUTSIDE (E) INSIDE (I/LE)

INSPECTION TEST SCHEDULE (ITS)

(FROM PART 1)

CERTIFICATIONS (IRE)

SHIPPING & INVOICING

CERTIFICATION (IRP)

PACKING LIST

INSPECTION PLANNING

NOTICE OF SURVEILLANCE (NOS)

PACKING

COMMISSIONING

JOB POSITION (TPC/JET) (FROM PART 1)

RELEASE CERTIFICATE (RC)

PRICE BREAKDOWN (FROM PART 1)

MANUFACTURING (FROM PART 2)

INSPECTION PLANNING

NOTICE OF INSPECTION (NOI)

CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)

General management Flow Chart (part 3)

Page 5: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Master Plant List (esempio)

Page 6: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Estratto Livello 3: Plant Unit 31 (Typical)

Page 7: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Programmazione di Livello 3 (Typical)

Page 8: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Programmazione di Livello 4 (Typical)

Page 9: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

Cut-off date: Progress (Typical)

Page 10: Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control Building erection Mechanical equipment Reheating furnace Piping

planned progress

0

10

20

30

40

50

60

70

80

90

100

2002 2003 20042001

%

N D J MF A M J J A S O N D J MF A M J J A S O N D J MF A

Valide per tutte le discipline e attività

Curve pianificate di avanzamento (typical)