Safety in the Process Industry Notes

Embed Size (px)

Citation preview

  • 8/20/2019 Safety in the Process Industry Notes

    1/3

    Philippine Electrical Code RA 7920

    Historical Background The frst documented case o a Code as a requirement o ruleswas published on !th "o#$ %% entitled &The 'an(ers o Electric )i(htin(*$ The frst "EC was de#eloped in %97+ ei(hteen ater thein#ention o incandescent li(ht bulb b, Thomas A$ Edison$ The 2009 PEC used the 200- Edition o the "ational ElectricalCode as reerenced Code$

    Introduction

     These (uidelines aim to attain e.cient ener(, utili/ation inbuildin(s$ t contains ener(, conser#ation (uidelines or thedesi(n o buildin(s and their ser#ices$ The (uidelines arebased on present da, #iewpoint and are thereore sub1ect tore#iew+ with re(ard to ur(enc, and ri(idit,+ as time passes$ The o#erall ob1ecti#e o the (uidelines is to sa#e ener(, in thebuildin( sector and pa#e the wa, or desi(nersarchitects toappl, ener(, conser#ation principles and techniques in theirdesi(ns$ To be able to meet this ob1ecti#e+ the (uidelines werede#eloped to address the aspects o desi(n o new buildin(sas well as the up(radin( o e3istin( buildin(s$

    ScopePEC co#ers the electric conductors includin( optical fbercable and installed within or on+ to or rom4 public and pri#atebuildin(s+ industrial plants+ transormer stations+ airfelds and

    railwa, switch,ard

    Intention"5T intended as a desi(n specifcation or an instructionmanual or untrained person$ The term untrained person can be interpreted to meanan,one who does "5T ha#e an understandin( o electricit,and electrical construction$t can also mean that the Code assumes a person readin( orstud,in( it 6nows and understands basic 5hm )aw+ ircho8s)aw+ the trian(le o fre+ etc$

    Classifcation o Code Rules$ wirin( desi(n rules2$ installation rules:$ manuacturin( rules

    The National Building Code

    Introduction The "ational ;uildin( Code o the Philippines is also 6nown asRA !-E CodeP?>E Code co#ers basic principles anddata used in the mechanical en(ineerin( feld

    Contains 29 ChaptersAn >E o.ce should ha#e at least one cop, o the Code@nli6e a andboo6+ this Code is intended not onl, ormechanical en(ineers but also to the (eneral public

     TE C5'E4 29 Chapters B202 #ersion ?A=ETD C5"?'ERAT5"?

    Chapter 74 Combustion AirChapter %4 Chimne,s and entsChapter 94 ?mo6e Control ?,stemsChapter 24 Reri(erationChapter :4 nstallation o EquipmentChapter 24 ndirect Faste+ Traps+ and nterceptors

    Chapter 224 =lammable and Combustible )iquid Pipin(?,stems and ?tora(eChapter 2:4 Pressure essels

    PRE??@RE E??E)?

    Chapter 2:4 Pressure esselsRule in Pressure essels Bb, '5)E in accordance with theP>E4

    Rule !04 ;oiler

    Rule 704 @nfred Pressure essels

     

    PRE??@RE E??E)?4 Rule !0 B;oiler

    Power ;oilerG a steam boiler with a wor6in( pressure e3ceedin( $0--

    6(cmH (au(e B- psi( eatin( ;oiler

    G a steam boiler with a wor6in( pressure not e3ceedin( $0--6(cmH (au(e B- psi( or a wor6in( temperature note3ceedin( 2IC

    PRE??@RE E??E)?4 Rule !0 B;oiler

    =actor o ?aet, J not less than -

    ;oiler Rooms J a clearance o 00 cm between boiler

    and the walls ?aet, al#e J boiler is equipped with at least one i 

    heatin( surace is

    pressure or the #al#e Fater Column Pipes G pipes connectin( water

    columns to power boilers shall not be less than 2-mm B in pipe si/e+ and as short and direct aspossible$

    PRE??@RE E??E)?4 Rule !0 B;oiler

    Cleanin( and Repairs

    G Repairs and ad1ustments+ such as ti(htenin( up Man(edfttin(s shall not be made on boilers and steam lines whileunder pressure$

    ;oiler and Pressure essel Plans

    G ;eore a boiler or pressure #essel is installed+ theownermana(er or hisher authori/ed representati#e shall flewith the ;ureau or in the Re(ional 5.ce concerned Bwitha#ailable P>EG )ocation Plan+ Room )a,out+ nstallation and =oundation

    Plans+ =oundation 'esi(n Computation+ 'etailed Construction'rawin(+ ?i/es o Plans+ Title ;loc6+ nstallation PRE??@RE E??E)?4 Rule 70 B@nfred Pressure

    essels =actor o ?aet, J not less than -

    ?aet, #al#es G shall be set within plus or minus ten

    percent B0L o its desi(ned pressure )iquefed Petroleum Nas B)PN essels and other

    C,lindersG ?hall be properl, mar6ed and identifed+ handled and stored+and transported

    )iquefed Petroleum Nas B)PN essels and other

    C,linders >ar6in( and dentifcation

    C,linders shall be le(ibl, mar6ed or the purpose o identi,in( the content inside with4 a$ chemical s,mbols G to

    be stamped on the metal at the shoulder o the c,linderK andb$ chemical name and trade name G to be stenciled+ labeledor stamped and shall not be easil, remo#ed$

    andlin( and ?tora(e

    C,linders shall be adequatel, protected a(ainst e3cessi#e#ariations o temperature+ direct ra,s o the sun andcontinuous dampness$C,linders shall be se(re(ated or stora(e b, t,pe o (as andempt, c,linders shall be stored apart rom char(ed c,linders

     Transportation

    C,linders shall be transported in a wa, that no part o thec,linders shall pro1ect be,ond the sides or ends o the #ehicle$Adequate precaution shall be ta6en to pre#ent rou(h handlin(+e3cessi#e shoc6s or local stress

    5ther Pressure essels

    ?team eated Pressure essels

    Closed ?team eated Pressure essels 5pen ?team eated Pressure essels

    Fater and Air Pressure Tan6s

    Reri(eration Tan6s

    Compressor

    The Fire Code o the Philippines R !"#$&t is the polic, o the state to ensure public saet,+ promoteeconomic de#elopment throu(h the pre#ention andsuppression o all 6inds+ o destructi#e fres+ and promote theproessionalism o the fre ser#ice as a proession$*

    ;, #irtue o RA !97- ;=P primaril, to perorm the ollowin(unctions4

  • 8/20/2019 Safety in the Process Industry Notes

    2/3

    • ;e responsible or the pre#ention and suppression o all destructi#e fres on buildin(+ houses and otherstructuresK orestK land transportation #ehicles andequipmentK ships and #essels doc6ed at piers orwhar#es anchored in ma1or sea portsK petroleum industr, installationsK plane crashesK and other similar acti#ities

    • ;e responsible or the enorcement o the =ire Codeo the Philippines BP' %- and other related lawsK

    • ?hall ha#e the power to in#esti(ate all causes o fresand i necessar,+ fle the proper complaint with thecit, or pro#incial prosecutor who has 1urisdiction o#er

    the caseK• n the time o national emer(enc,+ all elements o

    the ;=P shall upon direction o the President+ assistthe A=P in meetin( the national emer(enc,K and

    • ?hall establish at least one B fre station withadequate personnel+ fref(htin( acilities andequipment in e#er, pro#incial capital+ cit, andmunicipalit, sub1ect to standard rules andre(ulations as ma,be promul(ated b, the ')N$

    REP@;)C ACT 9-

  • 8/20/2019 Safety in the Process Industry Notes

    3/3

    P?>E Code 9%<Philippine ?ociet, o >echanical En(ineers Code 9%<

    Chapter J NeneralArticle $ ?cope$$ This chapter pro#ides the (eneral requirements or

    wor6s in#ol#in( machiner, installations andoperations$

    Chapter 2 J Commercial and ndustrial ;uildin(Article 2$ ?cope2$$ This chapter co#ers (eneral (uidelines in the choice anddesi(n o industrial buildin(s$ t includes saet, rules andrequirements or the #arious aspects o industrial buildin(s+and matters on machiner, and equipment oundation desi(ns$

    Chapter : J Power Transmission Equipment+ Prime >o#ers+>achines and >achine PartsArticle :$ Purpose:$$ To re(ulate the (uardin( o power transmissionequipment+ prime mo#ers+ machines+ and machine parts+ butdo not include point o operation ha/ards$

    Chapter < J >achiner, 'an(er Oone and Points o 5perationArticle etrolo(,Article 2$ Purpose and ?cope

     To amiliari/e all practitioners with the concepts andtechniques o measurin( instruments$ t co#ers the applicationo metrolo(, in all industries+ which concerns with theundamental standards and techniques o measurements+ andwith the scientifc principles o the instrumentation in#ol#ed$

    Chapter : J >achine ?hop >achiner, and EquipmentArticle :$ Purpose and ?cope:$$ To identi, each and e#er, equipmentmachiner, andtools in a machine shop and the correspondin( operatin(principles in#ol#ed$

    >achine shop practice consists o certain mechanicalprinciples that are part o all machine shop wor6 e#er,wheresuch as the principles o cuttin( tools+ cuttin( speeds andeeds+ actions o (ears+ screws+ cams+ etc$+ applied in theconstruction o certain machines and tools and in the #ariousmachine operations4 that is+ in the methods o holdin( anddoin( the wor6$

    A machine shop is a room or space with sidin(s androos where metal parts are cut to si/e required and putto(ether to orm mechanical units or machine+ which aremade to be used in the production o the necessities o ci#ili/ation$ 5ne or more machines constitute to a machineshop$

    Chapter < J >anuacturin( ProcessesChapter - J =uels and )ubricants

    Chapter ! G >aterials