Safe by Design Group – PSLG Safety Forum 14th December 2012
Paul Clark -IP (Central) Head of Engineering
Tony Wilkins - SBDG Chairman (Mott McDonald)
Jason Johnston – IP Programme Engineering Manager 1
Design Risk Assessment
Safe by Design (SbD) - Overview
2
Safe by Design Programme
Plan
Develop
Implement
Review
BAU
Plan
Develop
Implement
Review
Plan
Develop
Implement
Review
Plan
Develop
Implement
Review
Plan
Develop
Implement
Review
Procurement & Programme
Early Focus on Buildability and
Temporary Works
CDM Roles & Responsibilities
Lessons Learnt
CONTINUOUS IMPROVEMENT
PSLG Feedback (1) – Progress to date
• Designer’s Risk Assessment
– Implementation phase, sharing ideas capacity added to the SbD collaboration site
– New multi-disciplinary PAN/0082 published Oct 2012
– Red triangles on drawings adopted to highlight risks from DRA
• Early focus on Temporary Works and Buildability
– Guidance notes uploaded onto collaboration site
– Key messages being incorporated into Contract Requirements Technical
3
Standard Design – Use of Warning Triangles
4
PSLG Feedback (2) – Progress to date
• CDM Roles / Responsibilities
– Development complete
– Implementation challenges
• Lessons learnt
– Examples received
– Uploaded onto collaboration site
– Engagement challenges
• Procurement & Programme
– Include commitment to SbD in CRT, mid tender reviews and tender assessment
– Wider adoption of collaborative working and ECI
5
Safe by Design
Forward Plan
6
PSLG Feedback – Future Initiatives
• Cross discipline representation on 2013 Safety by Design Steering Group endorsed
• Behavioural change foundation to SbD endorsed
• SbD Group to consider and report back on measures to be put in place to monitor the effectiveness of implementation
• ORR feedback on recent Safety by Design audits to be disseminated
• The need to coordinate cross discipline / cross route SbD initiatives was emphasised
7
Future Governance of SbD
Steering Group
Working Group
Workstream 1 e.g
BehaviouralChange
Working Group
Workstream 2
E&P
Working Group
Workstream 3
B&C
Working Group
Workstream 4
Signalling
Working Group
Workstream 5
Track
Steering GroupActivities: Governance / Coordination / StrategyFeature: Cross-discipline (B&C/T/E&P/S&T/Sys)
Chair: Designer RepMembers: NR (e.g. HoE, HSEA, Commercial,
RDD, DRAM), x Designers, y Contractors, ORR
Working GroupsActivity: Develop & deliver work-stream (plan)
Features: Either single or cross-discipline (depending on workstream)
Lead: Nominated by SGMembers: NR (e.g. PEM, HSEA, RAM, Competence & Training), x Designers, y
Contractors
Mott MacDonald Actions
9
Safe by Design
Questions
10