Safe by Design Group – PSLG Safety Forum 14th December 2012

Paul Clark -IP (Central) Head of Engineering

Tony Wilkins - SBDG Chairman (Mott McDonald)

Jason Johnston – IP Programme Engineering Manager 1

Page 2: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Design Risk Assessment

Safe by Design (SbD) - Overview

2

Safe by Design Programme

Plan

Develop

Implement

Review

BAU

Plan

Develop

Implement

Review

Plan

Develop

Implement

Review

Plan

Develop

Implement

Review

Plan

Develop

Implement

Review

Procurement & Programme

Early Focus on Buildability and

Temporary Works

CDM Roles & Responsibilities

Lessons Learnt

CONTINUOUS IMPROVEMENT

Page 3: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

PSLG Feedback (1) – Progress to date

• Designer’s Risk Assessment

– Implementation phase, sharing ideas capacity added to the SbD collaboration site

– New multi-disciplinary PAN/0082 published Oct 2012

– Red triangles on drawings adopted to highlight risks from DRA

• Early focus on Temporary Works and Buildability

– Guidance notes uploaded onto collaboration site

– Key messages being incorporated into Contract Requirements Technical

3

Page 4: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Standard Design – Use of Warning Triangles

4

Page 5: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

PSLG Feedback (2) – Progress to date

• CDM Roles / Responsibilities

– Development complete

– Implementation challenges

• Lessons learnt

– Examples received

– Uploaded onto collaboration site

– Engagement challenges

• Procurement & Programme

– Include commitment to SbD in CRT, mid tender reviews and tender assessment

– Wider adoption of collaborative working and ECI

5

Page 6: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Safe by Design

Forward Plan

6

Page 7: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

PSLG Feedback – Future Initiatives

• Cross discipline representation on 2013 Safety by Design Steering Group endorsed

• Behavioural change foundation to SbD endorsed

• SbD Group to consider and report back on measures to be put in place to monitor the effectiveness of implementation

• ORR feedback on recent Safety by Design audits to be disseminated

• The need to coordinate cross discipline / cross route SbD initiatives was emphasised

7

Page 8: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Future Governance of SbD

Steering Group

Working Group

Workstream 1 e.g

BehaviouralChange

Working Group

Workstream 2

E&P

Working Group

Workstream 3

B&C

Working Group

Workstream 4

Signalling

Working Group

Workstream 5

Track

Steering GroupActivities: Governance / Coordination / StrategyFeature: Cross-discipline (B&C/T/E&P/S&T/Sys)

Chair: Designer RepMembers: NR (e.g. HoE, HSEA, Commercial,

RDD, DRAM), x Designers, y Contractors, ORR

Working GroupsActivity: Develop & deliver work-stream (plan)

Features: Either single or cross-discipline (depending on workstream)

Lead: Nominated by SGMembers: NR (e.g. PEM, HSEA, RAM, Competence & Training), x Designers, y

Contractors

Page 9: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Mott MacDonald Actions

9

Page 10: Safe by Design Group – PSLG Safety Forum 14 th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald)

Safe by Design

Questions

10