    2013 DOTD Engineering

    Conference

    Effort to Address Consultant Services

    Workloadand Expedite Requests

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    2/46

    Amount Contracted Last Three Years

    Data from Lotus Notes

    FY 2010/2011 - $90.2 million FY 2011/2012 - $155 million

    FY 2012- present - $81 million

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    3/46

    CCS Titles 48 Current Personnel

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    4/46

    Additional Personnel to be Added

    Contract Worker to add in the development of contracts, taskorders and supplements.

    An over hire was approved due to an existing worker on FMLA

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    5/46

    Effort to Reduce Number of Requests

    Time Extension

    Time extension with justification will be granted by

    the Project Manager (except for retainer contracts

    extensions are allowed for Task Orders)

    Written notification from the PM shall be sent to theconsultant and two copies shall be provided to CCS.

    By granting time extensions, the PM will impact the

    contracts provision listed under the PROSECUTION

    OF WORK.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    6/46

    Negotiation of Contracts

    Negotiation of the contract is part of the PMsduties. Initial negotiation shall now beperformed by PM using State Wide Averages, ifwithin 10%, submitted to CCS for action.

    Negotiation shall continue until both parties arewithin 10% or the Negotiation time as establishedin the advertisement has exceeded.

    If negotiations fail or cannot be completed within

    this time period, the PM shall request CCS tosubmit another shortlist to the Secretary for theAward of the contract.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    7/46

    Multiphase Contracts of Less Than

    $1,000,000

    The total contract will be advertised for all

    known phases. This is an effort to reduce the number of Supplemental Agreements.

    After each phase/task is completed, the PM shall give approval by writtennotification to the consultant (copy CCS) to advance to the next phase or task.

    If at any time a change in scope or compensation will impact the Original

    Contract, the PM shall request a Supplemental Agreement.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    8/46

    Multiphase Contracts of Over

    $1,000,000

    The total contract will be advertised for all knownphases.

    This is an effort to reduce the number of SupplementalAgreements.

    After the each phase/task is completed, the PM shallgive approval to advance by a Detailed Scope &Compensation letter (all work must be within theoriginal scope and fee established in the contract).

    If at any time a change in scope or compensation willimpact the Original Contract, the PM shall request aSupplemental Agreement.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    9/46

    Notice To Proceed

    Notice to proceed will no longer be delayed due

    to budget issues

    The PM shall inform CCS as to the recommended

    NTP date.

    The PM is responsible for the projects budget

    including contract actions.

    The PM shall ensure that budget is in place andsufficient to pay the invoice before submitting the

    invoice to CCS.

    CCS will return invoices if budget is not adequate.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    10/46

    Invoice CCS Web Site

    INVOICE SUBMITTAL INFORMATION FOR

    PROJECT MANAGERS Last Updated: 02/06/2013

    http://notes1/ContWEB.nsf/b88769326453be

    f886256fe00047183a/dca7a93559830ece862

    57b0a00793883?OpenDocument

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    11/46

    Advance Notice to Proceed

    Not recommended unless absolutely necessary

    Division Heads may consider for state funded

    projects and for delegated projects (benefitting

    projects must have FHWA authorization).

    Consultants should be made aware that invoices

    will not be processed until the contract is

    executed, budget is in place, and Purchase Orderis available.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    12/46

    Purchase Order

    Section 80 is the buyer for most of HQsections

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    13/46

    Purchase Order

    The PM or other member of their section willbe the Requisitioner.

    The Requisitioner is the business line expert.

    The business line expert is responsible for allaccounting codes required for the ShoppingCart or Purchase Order.

    The Requisitioner is responsible for providingaccounting coding and other data needed forshopping carts or purchase orders.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    14/46

    2013 DOTD Engineering

    Conference

    Past Rating System

    (RTNG old2012 CPPR new)

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    15/46

    RTNG System

    Old System end used in 2011

    Based on a 0-4 scale rating

    Limited grading questions Only grader enters data into system

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    16/46

    CPPR System

    New System started in 2012

    Based on a 1-5 scale rating

    Rating questions proposed by each section The data entered by grader is approved by a

    supervisor

    E-mail notification to consultant of the ratings

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    17/46

    Ranking of 24-102 forms

    How are the two different ratings used to determine theconsultants past ratings score for the short list for the Secretary?

    Since both scales have the same number of intervals between the

    low score and the high score, the Department currently reduces the

    CPPR score by one and performs a weighted average of the scores.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    18/46

    Example Firm XYZ has

    3 old RTNG scores for the category stated in theadvertisement

    (2.5, 2.8 and 3.4 average 2.9)

    2 new CPPR for the category stated in the advertisement

    (3.3 and 4.1 average 3.7)

    RTNG Average*# of RTNG Scores + (CPPR Average-1)*# of CPPR Scores

    # of RTNG Scores+ # of CPPR Scores

    (2.9*3)+((3.7-1)*2) Equal 8.7+5.4 Equal 2.82 Use 2.8(3+2) 5

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    19/46

    2013 DOTD Engineering

    Conference

    Direct Expenses

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    20/46

    DIRECT EXPENSES

    Direct Expenses should be reasonable and

    what a prudent person would pay for the

    service or material.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    21/46

    Travel Expenses

    As per Departmental consultant contracts:

    All travel expenses shall be in accordancewith the State Travel Regulations.

    The Louisiana Travel Guide can be found at thefollowing web link:

    http://www.doa.louisiana.gov/osp/travel/travelpolicy/travelguide.pdf

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    22/46

    Extended Stays

    For travel assignments approved by the

    Commissioner of Administration involving duty

    for extended periods (31 or more consecutive

    days) at a fixed location, the reimbursement ratesindicated should be adjusted downward

    whenever possible.

    Prior approval must be given by Division Heads May approve per diem rate (lodging and meals)

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    23/46

    Mileage

    Recent change by DOA effective date 2-1-2013

    Mileage for first 99 miles of any trip will bereimbursed at a rate of $0.51 per mile.

    Mileage beyond the first 99 miles will be

    reimbursed at a rate of $0.40 per mile.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    24/46

    Office of the Commissioner

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    25/46

    Special Rates for Vehicle, Equipment or

    Materials

    The direct expenses will be disallowed if subsequent audits reveal that the

    Consultant has not maintained adequate bookkeeping.

    Special vehicle/equipment rental rates will require prior approval from the

    DOTD Project Manager. These rates shall be established in the contract.

    If the PM lacks knowledge on rental rates for the special vehicle / equipment /

    materials, the PM should request at least 3 quotes from the consultant todetermine if the rental rate is reasonable.

    Direct expense shall not include a profit to a consultant nor be impacted by

    the consultants overhead rate.

    If PM needs help in determining a rate, the PM should contact the Audit

    Section.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    26/46

    2013 DOTD Engineering

    ConferenceConsultant Services

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    27/46

    Consultant Contract Services

    As the name implies, we are here to serve the

    other sections of the Department in acquiring

    consultant contracts.

    These engineering contracts are under Title 48

    of the Louisiana Revised Statues.

    Information requesting services must be in

    accordance with the requirements of theselaws.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    28/46

    Authorization Letter

    Minimum Manpower Requirements

    Weighting factors for RFP Complexity Factors

    Shortlist

    Notice to Proceed

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    29/46

    Request for Consultant Services

    RS:48:286 (1) The magnitude of the work involved in a project is

    determined to be so taxing to the department's availablemanpower that it will be necessary to defer other essentialwork if the work is performed by the department staff.

    (2) The work required by a project is determined to be ofsuch a specialized nature that the department will berequired to go outside its own staff for experts in theappropriate fields to accomplish the work.

    (3) The time frame within which the work must becompleted is determined to be such that the departmentcannot undertake the work and maintain its program onschedule.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    30/46

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    31/46

    Request for Advertisement

    Standard contract templet for engineering

    http://notes1/ContWEB.nsf/b88769326453be

    f886256fe00047183a/f56d1a5493085cd08625

    75d00002e369?OpenDocument

    Scope of services DBE Goal

    Items to be provided Reference Material

    Compensation Contract time

    QC/QA requirements Minimum Personnel Reqd

    Evaluation Criteria Other items as needed

    http://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/f56d1a5493085cd0862575d00002e369?OpenDocument
  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    32/46

    Contract time

    Contract time for the actions to be performed

    Entire contract time shall be noted on

    transmittal letter, used in determining

    compatibility of firm in rating program.

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    33/46

    Scope of Services

    All services to be provided:

    Original contract

    All supplements

    May limit the activity of future supplements

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    34/46

    DBE Goals

    DBE goals will be reviewed for all contract greaterthan $250,000 total (all phases)

    DBE is considered when any activity with the contractcan be performed by a DBE firm located near theproject

    DBE can be established with a No Goal to 10% normalmaximum.

    If goals cannot be satisfied, documentation is neededin accordance with a Good Faith Efforthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/22a8505cdc115fc38625734800681e7e?OpenDocument

    http://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/22a8505cdc115fc38625734800681e7e?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/22a8505cdc115fc38625734800681e7e?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/22a8505cdc115fc38625734800681e7e?OpenDocumenthttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/22a8505cdc115fc38625734800681e7e?OpenDocument
  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    35/46

    Reference Material

    Standard reference material web link:http://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef88625

    6fe00047183a/18fc2860512aba5886257a62006133b8?OpenDocument

    If additional reference material is needed, textis to be included in the advertisement along

    with additional web links

    http://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/18fc2860512aba5886257a62006133b8?OpenDocumenthttp://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/18fc2860512aba5886257a62006133b8?OpenDocumenthttp://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/18fc2860512aba5886257a62006133b8?OpenDocumenthttp://webmail.dotd.louisiana.gov/ContWEB.nsf/b88769326453bef886256fe00047183a/18fc2860512aba5886257a62006133b8?OpenDocument
  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    36/46

    Compensation

    List the entire amount for the contract and the

    amount to be paid for by the current contract

    action

    Direct Expenses may be shown separately

    with a different maximum

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    37/46

    QC/QA requirements

    Standard QC/QA provisions should be stated in

    majority of advertisements.

    New QC/QA provisions are required for contracts

    associated with bridge design elements. Bridgeteam member will grade these provisions. The

    grading of these provisions will be included with

    the short list to the Secretary. Link:http://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-

    %20Quality%20Assurance%20for%20Bridge%20Projects.pdf

    http://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdfhttp://notes1/ContWEB.nsf/b88769326453bef886256fe00047183a/81b8aac81583c4c586257a6700502e85/$FILE/Quality%20Control%20-%20Quality%20Assurance%20for%20Bridge%20Projects.pdf
  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    38/46

    Minimum Personnel Reqd

    Minimum personnel requirements should be

    definable and verifiable by Evaluation Team.

    Normally years of experiences are shown to

    be 3, 5 or 10 years of experiences

    Must list any required documentation of

    profession licenses or certification(s).

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    39/46

    Evaluation Criteria

    The six standard weight factors will be usedunless approval is given by the Chief Engineer forspecialty projects.

    Complexity up to moderate can be requested by

    the Project Manager. For complex rating for anadvertisement, recommendation of the SectionHead, Chief Engineer and approval by theSecretary is required.

    The Project Manager is to list the members of theEvaluation Team.

    continue

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    40/46

    Evaluation Criteria

    Six Factors (weighting factor) Firm Experience as determined by Evaluation Team (3)

    Staff Experience as determined by Evaluation Team (4)

    Past Performance as per ratings given by previous Project Managers

    (6)

    Current Work Load as per CCS records and Consultants 24-102

    submittal (5)

    Compatibility (Firm Size) as determined by CCS rating program (3)

    Location as reported on 24-102 and verified by CCS (location of themajority of the staff meeting the requirements of the minimum

    personnel requirements) (4 with the exception of 6 for Urban System

    Projects).

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    41/46

    Evaluation Criteria

    Past Performance Highest Rated Factor

    Based on similar DOTD projects

    The categories to be considered and their percentage

    are determined by the Project Manager. CCS request that the categories to be considered to be

    limited to at most three difference categories.

    Past ratings from Project Managers are needed in

    order for this factor to be fully utilized.

    Past Ratings are considered for only three years. continue

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    42/46

    Evaluation Criteria

    Modifications or additional factors can be

    added in accordance with RS 48: 293

    the weighting factors may be varied based on the

    specific project requirements

    special evaluation criteria specified in the

    advertisement required to meet particular project

    needs

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    43/46

    Shortlist Evaluation

    Section Input

    Firm and Staff Experience, Evaluation Team inputaccounts for approximately 28% of evaluation

    Past Performance accounts for approximately 24% ofevaluation This is the best reason to rate all of the consultants work under

    your supervision

    Firms without scores will be assigned a rating as per theadvertisement. Either equal to the average of all of the otherrespondents for the project or the statewide average.

    Total percentage of the input by the teams andsections is approximately 52% of evaluation

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    44/46

    Shortlist Evaluation Additional Criteria

    Work Load

    Current Work Load the outstanding work

    excluding retainage without active task orders

    and work officially on hold for more than 6

    months.

    The maximum workload per person is

    currently estimated as $125,000 per year.

    This factor is approximately 20% of evaluation

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    45/46

    Shortlist Evaluation Additional Criteria

    Firm Size

    Firm Size as know as Compatibility

    Based on the percentage of the work to beperformed, the estimated amount of the

    contract, length of the contract, currently$3000/person/month and the number ofemployees of the firm

    Will be impacted by a moderate or complex

    rating factor (large firms will receive a value notless than a 2).

    This factor is approximately 12% of evaluation

    h l l dd l

  • 7/29/2019 S54_Consultants Rating and Proposal Advertisements_LTC2013

    46/46

    Shortlist Evaluation Additional Criteria

    Location

    Location is normally as stated in the firms 24-

    102

    CCS verifies and may change located based on

    a review of the location of the majority of the

    key staff listed to satisfy the minimum

    personnel requirements.

    This factor is approximately 16% of evaluation