PT Madhucon Sriwijaya Power 1
S R I W I J A Y A P O W E R
PT. MADHUCON
POWER TO PROSPER MADHUCON
Project Site Location:
Tanjung Dalam,
Keluang, Bayung Lencir,
Musi Banyuasin Regency,
South Sumatera - Indonesia
Corporate Office
Menara Bidakara, 3rd Floor,
Jl. Gatot Subroto Kav 71-73,
Jakarta 12870, Indonesia
2x150MW Mine Mouth Coal Fired Thermal Power
Plant
PT Madhucon Sriwijaya Power 2
MADHUCON
Following a successful global tender, a Madhucon consortium has formed
a Special Purpose Vehicle (SPV), PT Madhucon Sriwijaya Power (PT.
MSP).
PT. MSP is setting up a 2 x 150 MW mine mouth coal fired thermal power
plant in South Sumatera, Indonesia and will supply Power to PT. PLN, the
State owned Electricity Corporation of Indonesia. In line with the Power
Purchasing Agreement (PPA) signed on May 1, 2012 PT. MSP will supply
Power for 25 years.
PT. MSP has concluded a Coal Supply Agreement with PT. Madhucon
Indonesia for the entire tenure of the agreement with PT. PLN.
Lahmeyer (India) has prepared the Detailed Project Report confirming the
technical and commercial viability of the project.
About us
PT Madhucon Sriwijaya Power 3
MADHUCON Madhucon Group Companies Madhucon Projects Limited (MPL)
EPC Company – Listed on BSE
& NSE Stock Exchanges.
Madhucon Infra Limited (MIL)
Infrastructure Company, holding the verticals of
Power, Roads, BOT, Toll Gates & Coal Mines etc.,
Simhapuri Energy Private Limited
1,920 MW Thermal Power Plant
PT Madhucon Indonesia (PT.MI)
Holds substantial reserves of mineable coal
Madhucon Granites Limited (MGL)
100% Export Oriented Unit, serving the
US, European & Middle Eastern markets.
Madhucon Sugars & Power Ltd.
3,500 TCD Capacity, along with
manufacture of Ethanol and Co-
generation of Power - 24MW.
PT Madhucon Sriwijaya Power 4
MADHUCON Madhucon Group Companies.. Special Purpose Vehicles for BOT Projects – Toll Roads
Madhucon Agra Jaipur Expressways Limted
TN(DK) Expressways Limited
Trichy – Thanjavur Expressways Limited
Madurai – Tuticorin Expressways Limited
Chappra – Hazipur Expressways Limited
Barsast – Krishnagar Expressways Limited
Ranchi Expressways Limited
Vijayawada – Machilipatnam Expressways Limited
Special Purpose Vehicles for Realty Projects
Madhucon Mega Mall Private Limited
Nama Hotels Private Limited
Madhucon Heights Private Limited
PT Madhucon Sriwijaya Power 5
MADHUCON Madhucon Infra Limited
Around 95 % shares held by MPL in MIL
Holding company of all infrastructure assets such as BOT Road
projects, Thermal Power, Hydel Power & Gas based power
projects and Coal mining businesses in India & overseas.
As on date MPL and MIL has invested in different infra SPVs to
the extent of around Rs. 932 Crores ( US$ 207 Mln).
Madhucon Projects Limited
(MPL)
Madhucon Infra Limited (MIL)
PT. Madhucon Sriwijaya Power
Madhucon Energy Limited
Madhucon Toll Highway Ltd
PT. Madhucon Indonesia
PT Madhucon Sriwijaya Power 6
MADHUCON Power Holding Structure
Simhapuri Energy Private
Limited 1, 920 MW
Thermal Power Plant at Nellore, Andhra
Pradesh, India.
MoU With
Jharkhand Govt. for
2x660 MW 1,320 MW
Thermal Plant
Rajanagaram Gas Power Project 400 MW Phase 1 600 MW Phase 2
Hydro Power Projects -
Uttarakhand 3 X 25 = 75 MW
Orissa Power Project
2x660 MW 1,320 MW
Thermal Plant
Madhucon Infra Limited
Madhucon Energy Limited
PT Madhucon Sriwijaya Power 7
MADHUCON Mining Holding Structure
Dawas Mine South Sumatra 8,663 Hectares
Substantial Mineable Reserves
Madhucon Infra Limited
PT. Madhucon Indonesia
Muara Dua Mine South Sumatra 30,970
Hectares
Kauro Mine Kalimantan
Muara Kommam Kalimantan
3,930 Hectares
PT Madhucon Sriwijaya Power 8
MADHUCON
₰ The power sector in Indonesia is organized under the Ministry of Energy and
Mineral Resources. PT. Perusahaan Listrik Negara (PT. PLN) is responsible for
the majority of Indonesia’s generation and is the monopoly provider of
transmission, distribution and retail supply of electricity in Indonesia.
₰ In order to support a population of over 238 million people, reliable electricity
generation is needed for Indonesia’s economic growth.
₰ The National Electricity Development Plan 2005 (RUKN 2005) estimates that the
peak power demand of the country will increase at an average annual rate of
7.5% and will reach 79,900 MW in 2025. It also estimates that the energy demand
will increase at almost same rate and will reach 4,50,000 GWhr in 2025.
Power Scenario of Indonesia
₰ The Indonesian Government
through the National Electric
Co. (PT. PLN) had introduced
the participation of the private
sector, as Independent Power
Producers (IPP) since the
1990’s to fulfill Indonesia’s
growing electricity demand.
Balance of Power System of Sumatra
PT Madhucon Sriwijaya Power 9
MADHUCON Power Overview
Sector Overview
The Electricity Law 30/2009 is the legal
foundation of the electricity sector in
Indonesia. The Law has brought in major
changes on regulating the electricity
sector. It eliminates the monopoly power
of PLN and enables other entities to
develop electric infrastructures in regions
not yet served by PLN.
The regulatory power for national grid
and PLN is maintained by the Ministry of
Energy and Mineral Resources (MEMR).
PLN has a history wherein it has not met
its obligations with some IPPS which
ultimately had to go for arbitration.
The major consumer of energy is the
residential sector
Of Indonesia’s current installed capacity of
30.941 HW, IPPs account for 4.269 GW or
approx 14%
Electricity Generation Licenses or “IUPTLs”
are offered to private entities with up to 95%
foreign shareholding, with PLN acting as the
single buyer.
The power consumption per capita is the lowest in the region despite the abundant natural resources present.
PT Madhucon Sriwijaya Power 10
MADHUCON
PT Madhucon Sriwijaya Power
Power Planning of South Sumatera
PT Madhucon Sriwijaya Power 11
INDONESIA
MUSIBANYUSIN
SOUTH SUMTATRA
PT Madhucon Sriwijaya Power – Plant Location
Plant Location
PALEMBANG
S. MERANG
TELUK SEKANAK
BUYUNG LENGCIR
MUARAMENDAK
MUARA MENNAG
TANAHBANG SUNGAI SEMBILANG
SUNGAI BUNGIN
KULAA SUGIHAN
DUSUN SERDANG SENANG
SUNGSANG
PANUGUAN TELUKKUBU
BENTAYAN PENINGGLAN
HULUSUNGAI BAYAT
LUBUK BANCAL
BABAT KELUANG
SUNGAILIIN TELUK TENGGULANG
KULA PUNTIAN
MUARTELANG
KARANGNYAR
MANUNJAYA SEKAYU BABT PALEMBANG
BOOMBARU SEBOKAR
JIRAK
MADHUCON
PT Madhucon Sriwijaya Power 12
MADHUCON Salient Features of The Project
ss
dd
Project Site Location: Tanjung Dalam, Keluang, Bayung Lencir,
Musi Banyuasin Regency, South Sumatera - Indonesia
Aur Duri Substation
Betung Substation
Coal Source: From PT. Madhucon Indonesia 5 kms from the Project Site
Water Source : from Dawas River (Brackish / River ) 3 kms from the Project site
Power Evacuation: Inter connection with
275 KV Transmission Line 11 kms from the Project Site
PT Madhucon Sriwijaya Power 2x150 MW CFPP
PT Madhucon Sriwijaya Power 13
MADHUCON
Activities Date
Issuance of RFP July 15, 2011
Pre-Bid Meeting July 19, 2011
Issuance of Addenda July 26, 2011
Bid Closing of Administrative & Technical and Price Proposal Aug 22, 2011
Bid Opening of Administrative & Technical and Price Proposal Aug 23, 2011
Evaluation and Clarification Aug 23, 2011
Bid Opening of Price Proposal Sep 20, 2011
Evaluation of Price Proposal Oct 12, 2011
Announcement of the Preferred Bidder Oct 16, 2011
Objection Period Oct 16, 2011
Clarification of Objection Oct 20, 2011
Issuance Letter of Intent of the Preferred Bidder Nov 25, 2011
Finalization of PPA Dec 10, 2011
Price Approval from Ministry of Energy and Mineral Resources. Jan 01, 2012
Signing of PPA May 01, 2012
Financing Date (12 months from signing of PPA) April 30, 2013
Commercial Operation Date of the Plant (30 month from Financing Date) Oct 31, 2015
Chronology of 2x150 MW CFPP Bidding Process by PT. PLN (PERSERO)
PT Madhucon Sriwijaya Power 14
MADHUCON Project Milestones Schedule (From the date of Financial Closure-29.04.2013)
Milestone Month
Financing Date 0
Commencement of Work 1
Completion of :
Site Preparations 6
Steel Structure 16
Steam Generator 26
Steam Turbine 26
Electric Generator 26
Coal Handling System 24
Mining Construction 22
Ash Handling System 23
Installation of 275kV Switch yard and 275kV T/L 25
Back Feeding power for testing 24
Special Facilities:
• PLN Power for testing of Special Facilities 23
• Taking-Over by PLN of Special Facilities 24
Initial Plant Synchronization 25
Commissioning Date for Unit 1 27
Commercial Operation Date (Plant COD) 30
PT Madhucon Sriwijaya Power 15
MADHUCON
Description Parameter Remarks
Plant Capacity 2 x 150 MW Sub Critical Boiler with CFBC Technology
Project Cost 414 USD Million
(Approx.) Negotiations with potential Contractors in China / Europe / India
Debt / Equity Ratio 75 : 25
Fuel GCV 3800 kCal/kg Coal Supply Agreement with PT. Madhucon Indonesia
PPA Term 25 Years
Power Evacuation 275 KV
Transmission System
Interconnection point is located at 7 km’s from the proposed plant location.
Water Source 3km (Approx.) Dawas River
Land 60 Ha Adjacent to Coal Mine, Approx. distance 5 km.
Nearest City
Airport / Port Palembang 140 km from the Project Location
Major Road State Highway 10 km from the Project Location
Highway between Palembang to Jambi
New Technologies
Adopting Coal Dryer for enhancement of Plant performance.
RO Plant for Water Treatment
Dry Fly Ash collection System for utilization in Cement Plants
Project Highlights
PT Madhucon Sriwijaya Power 16
MADHUCON
This Presentation dated November 2012 is submitted for evaluation to prospective debt & equity partners. This document
is delivered by PT. Madhucon Sriwijaya Power (“PT. MSP”) on its own behalf.
The receipt of this presentation constitutes an agreement on part of all recipients hereof to maintain the confidentiality of the
information contained herein. Use of this presentation for any other purpose is prohibited.
The Company has furnished the information contained in this presentation using its own knowledge and other sources
believed to be reliable. PT. MSP has not conducted any independent investigation of such information and does not make
any representation or warranty as to the accuracy or completeness of such information.