Issue No: 12 | March- 2020 | New Delhi Newsletter Dear Patron The month of March saw a spurt of activities on the Customer Experience front by installing Fit India Squat Machine last month which has been well patronised by the public; and then getting a five star rated Eat Right Station Certificate for Anand Vihar (Delhi) Railway Station with 92.08% for the first time in the history of Indian Railway. This cover story of this issue is technical achievements of IRSDC in planning and construction of 5-star hotel on top of Railway Tracks at Gandhinagar(Gujarat) Railway Station and second part of FORM BASED CODES genesis. Month of March 2020 has been a tough month for the entire humanity. Not just India, but the entire world is fighting an unprecedented enemy called COVID-19 virus. Whole of the country is locked down from 24 th March 2020 onwards. Lockdown Period has offered us time for introspection and self improvement with determination to turn adversity into opportunity for stations on Indian Railways. We at IRSDC firmly resolve that WE SHALL OVERCOME this pandemic successfully and convert this adversity into opportunity. The show must go on. We have resumed partial work from home by video conferencing. Take care & stay safe. S R I J A N S TATION R EJUVENATION I NITIATIVE BY J OINT A CTIO N An IRSDC Newsletter on Station Development MD & CEO’s MESSAGE IRSDC NEWS MD&CEO, IRSDC contributes in the 'Transit Retail Report‘ Sh. Sanjeev Kumar Lohia, Managing Director & CEO, IRSDC shared his views on the Growth and up-gradation of India’s infrastructure and its impact which has translated into a retail opportunity in the 'Transit Retail Report'. Get your copies here- https://t.co/ExPHFtaqJS https://t.co/LePkFyzcE9 IRSDC installs 'Fit India Squat Machine' at the 7th PHD Global Rail Convention 2020 IRSDC has received immense appreciation for the 'Fit India Squat Machine' initiative. With a view to showcase this 'Squat Machine' among dignitaries at the 7th PHD Global Rail Convention 2020 - "Indian Railways Future Growth on Fast Track" the machine was installed at the Convention venue. The effort received good participation. Ministry of Railways and Govt. of Gujarat selected Gandhinagar Railway Station for redevelopment along with exploitation of Railway Station Airspace for development of a 5-star Hotel and integration of Mahatma Mandir and Helipad Ground owned by the Govt. of Gujarat. An SPV named GARUD has been formed with Equity Contribution of Government of Gujarat (GoG) (74%) and IRSDC (26%) for the development, operation and management of the complete project. COVER STORY GANDHINAGAR CAPITAL RAILWAY STATION First Five Star Hotel in India on top of Rail tracks FULL STORY ON PAGE 4 1

S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Dear Patron

The month of March saw a spurt of activities on the Customer Experience front by installing Fit

India Squat Machine last month which has been well patronised by the public; and then

getting a five star rated Eat Right Station Certificate for Anand Vihar (Delhi) Railway Station

with 92.08% for the first time in the history of Indian Railway. This cover story of this issue is

technical achievements of IRSDC in planning and construction of 5-star hotel on top of

Railway Tracks at Gandhinagar(Gujarat) Railway Station and second part of FORM BASED

CODES genesis.

Month of March 2020 has been a tough month for the entire humanity. Not just India, but the

entire world is fighting an unprecedented enemy called COVID-19 virus. Whole of the country

is locked down from 24th March 2020 onwards.

Lockdown Period has offered us time for introspection and self improvement with

determination to turn adversity into opportunity for stations on Indian Railways. We at IRSDC

firmly resolve that WE SHALL OVERCOME this pandemic successfully and convert this adversity

into opportunity. The show must go on. We have resumed partial work from home by video

conferencing.

Take care & stay safe.

S R I J A NSTAT I ON REJUVENATION INI T I AT IVE BY JOI NT ACTI ONAn IRSDC News le t te r on S ta t ion Development

MD & CEO’s MESSAGE

IRSDC NEWS

MD&CEO, IRSDC

contributes in the

'Transit Retail Report‘Sh. Sanjeev Kumar Lohia,Managing Director &CEO, IRSDC shared hisviews on the Growth andup-gradation of India’sinfrastructure and itsimpact which hastranslated into a retailopportunity in the 'TransitRetail Report'. Get yourcopies here-https://t.co/ExPHFtaqJShttps://t.co/LePkFyzcE9

IRSDC installs 'Fit India

Squat Machine' at the 7th

PHD Global Rail

Convention 2020IRSDC has received immenseappreciation for the 'Fit IndiaSquat Machine' initiative.With a view to showcase this'Squat Machine' amongdignitaries at the 7th PHD

Global Rail Convention 2020 -"Indian Railways FutureGrowth on Fast Track" themachine was installed at theConvention venue. The effortreceived good participation.

Ministry of Railways and Govt. of Gujaratselected Gandhinagar Railway Station for redevelopment along withexploitation of Railway Station Airspace for development of a 5-starHotel and integration of Mahatma Mandir and Helipad Groundowned by the Govt. of Gujarat. An SPV named GARUD has beenformed with Equity Contribution of Government of Gujarat (GoG)(74%) and IRSDC (26%) for the development, operation and

management of the complete project.

COVER STORY

GANDHINAGAR CAPITAL RAILWAY STATION – First Five Star Hotel in India on top of Rail tracks

FULL STORY ON PAGE 4

1

Page 2: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Anand Vihar (ANVT) received 'Eat Right'

Station' CertificationIn a momentous feat, FSSAI India Chairperson, Ms.Rita Teaotia handed over ‘Eat Right Station’Certification to MD & CEO, IRSDC, Sh. S.K. Lohia atANVT Station, Delhi.ANVT has scored 92.08% with 5 star rating(Exemplary) by FSSAI, which is highest ever onIndian Railways.

v

2

IRSDC NEWS

WELCOMEMr. Dhruv Singh, IRAS, has joined

us as Director (Finance) in the month of March

IRSDC NEWS

New catering stall inaugurated at Pune

Railway StationA new catering stall ‘Let’s Chaat’ is nowoperational at platform no. 1 of Pune RailwayStation. Passengers can choose from a variety ofsnack options available at this stall.

Six new catering stalls inaugurated at Anand

Vihar (Delhi) StationSix new catering stalls were inaugurated at ANVTby FSSAI India Chairperson, Ms. Rita Teaotia andMD & CEO, IRSDC. IRSDC is happy to have set abenchmark and we are committed towardsproviding world class passenger experience atrailway stations.

v

Covid 19 IEC Posters widely placed across

five railway stationsIRSDC undertakes Facility Management of fiverailway stations namely, Chandigarh, AnandVihar, Secunderabad, Bangalore and Pune. Tomake passengers aware about the emergingthreat of COVID 19, IRSDC installed IEC Posters allacross these railway stations. Precautionaryaudio messages were also played at thestations.

Page 3: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Housekeeping efforts in full swing across five

railway stationsTo minimise the threat of COVID 19 pandemic andto make passengers aware about the essence ofcleanliness, rapid sanitisation activities wereconducted by housekeeping staff of IRSDC atSecunderabad, Anand Vihar (Delhi), Bangalore,Pune and Chandigarh Railway Station.

v

3

IRSDC NEWS IRSDC NEWS

Facility Management initiatives of fiscal year

2019 shared on social media portalsOn the official Face book and Twitter accounts,Facility Management updates of fiscal year 2019were shared. This initiative was undertaken toreiterate our commitment towards passengerconvenience and satisfaction.

IRSDC whole heartedly contributes in the PM

Relief Fund

Employees of IRSDC have contributed a

day's salary to PM Relief Fund.

v

Presentation on "Indian Station Development

A story so far"Sh R K Singh Director (Planning & Projects), IRSDCgiven a presentation on "Indian StationDevelopment - A story so far" in India Infrastructuresummit on 6th March 2020 at ITC Maurya, NewDelhi.

v

Page 4: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Gandhinagar Railway Station- First Five Star Hotel on Rail Tracks.

4

Ministry of Railways and Govt. of Gujarat selected Gandhinagar Railway Station for its

redevelopment along with exploitation of Railway Station Airspace for development of a 5-star

Hotel , integration of Mahatma Mandir and Helipad Ground owned by the Govt. of Gujarat. A

SPV named GARUD has been formed with Equity Contribution of Government of Gujarat

(GoG) (74%) and IRSDC (26%) which is working as a Joint Venture Company for

redevelopment of Gandhinagar Railway Station, development of Hotel on the Airspace

above Railway Station , management of Mahatma Mandir and Exhibition Centre at Helipad

Ground.

In January 2017 foundation stone was laid down by Hon’ble PM. The same month GARUD was

formed and the contractor for Civil works was appointed.

The project has undergone numerous changes since conception to implementation

incrementally from initial concept of development of 300 room ( mixed category hotel with 30

rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

star hotel category ,in a limited space of 100m X 100m above the tracks. After appointment of

M/s Leela on 10.10.2017 as Operator on Management contract model, the design underwent

lots of changes with inputs from M/s Leela which led to construction of 2 additional floors, 1 no.

of banquet hall, 2 restaurants along with changes in the room sizes. Complete layout plan

underwent transformation to accommodate a road underbridge and an elevated ramp to

provide direct road connectivity to the reception lobby at 22.5m above the ground. Thus the

design was evolving while the construction was going on, thereby making the project quite

challenging.

Railway Station & Hotel Building, Gandhinagar GARUD

Change in concept and design of project

As per R0 design As per R5 designProposed As Built

Hotel Built up area increased from 19090 sq.m. to 34507 sqm.

No. of floors of 3 Hotel Building towers changed from 6,8,10 to 9,11,11 floors

respectively,along with an additional core tower of 13 floors added to the Hotel

Building for services.

Introduction of Two Service floors in Hotel & Provision of Banquet hall and two

restaurants.

Maximum height of building is increased from 53m changed to 76.99m.

Page 5: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter 5

Gandhinagar Railway Station

Transformation of Concept Plan into layout Plan of Hotel Tower

Railway Station & Hotel Building, Gandhinagar GARUD

Change in Typical floor plan of Hotel

• All three towers proposed in thetender drawings are petal shaped inflower pattern.

• In As built drawing, towers are proposedat 120 degree from one another.

As per R0 drawing As per R5 drawing

Change in Hotel Entry

As per proposed design, Hotel Entry was from Ground level which was later changed to entry at

+22 m above Ground level via Elevated Flyover (937 m long)

Proposed

As Built

Page 6: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter 6

Gandhinagar Railway Station

Considering these design changes and with project structure being unique and one of its kind, IRSDC has

worked dilligently for achieving progress whilst getting over the obstacle/challenges that have come during

the Construction Period. Few of the challenges overcome are illustrated below:

Incessant Rains for two months during 2017With unusual heavy rains in 2017, the execution of pile foundation was very difficult as the site got flooded

with water. However, keeping in mind, the tight deadline and number of piles to be executed as high as 609

Nos. (depth varying from 32.79-37.79 m), execution of work was continued even in monsoon by taking

precautionary measure using Bentonite slurry and metal casing to avoid the collapsing of soil.

Foundation Plan Pilling Images

Construction of 100 m x 100 m slab being over Live OHE and operation stationMassive construction of approximately 10,000 sqm Concourse slab over and above the live OHE cable and

operational railway station was a mammoth task with various challenges. However, challenges were tackled

using innovative methodology, safety precautions, and parallel support of Western Railway. It was also

possible due to our constant follow up and coordination with Western Railways which helped us in taking

approvals for necessary block in record time with minimal hindrances.

Concourse Slab Plan Concourse Slab

Page 7: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter 7

Gandhinagar Railway Station

Execution of RCC Transfer girder of 7.5 m depth

Structural changes due to increase in load because of increase in height of building from 54 m to 76 m and

introduction of 2 service floors resulted into revision of design of transfer girder from 2.5 mtr depth(RCC

Beam) to 7.5 mtr depth(Composite Girder) Execution of this activity can be considered as an engineering

challenge, since enormous amount of concrete was needed to be poured between the crowded

reinforcement and structural steel beams. However, casting of slab in sequences and different strength gain

stages helped us to tackle the above challenges under monitoring of our team 24*7.

Also, there was a challenge of shortage of 40 mm dia TMT bar in market which we managed by replacing the

40 mm dia TMT bars with structural steel beams with due consultation of Structural Designer. It also helped us

in maintaining the casting cycle as per the planning with minimal deviations.

1st Lift (1500 mm) De-shuttering of 1st Lift

2nd lift (2700 mm) Placement of Structural Steel

Beam in different levels

3rd lift (1100 mm) 4th lift (2200 mm) with top deck slab

Page 8: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter 8

Gandhinagar Railway Station

Execution of 105 m span space frame (Station roof structure)

2nd lift (2700 mm)

Description Value

Span of Space Frame on Both Side North

and South Side

105 Meter

Width of Space Frame on Both Side North

and South Side

72 Meter

Height at Center of Space Frame +19.030 Meter from +0.00 Meter Track Top Level

Total Quantity of Structural Steel 1845 Ton

Total No of Rafter on Both Side 12 No’s

Type of Rafter A-B B-C C-D D-E

Length of Member ( Meter) 19 36 24 31

Weight of Member ( Ton) 9.5 14.5 8.5 13.6

Arc Length of Rafter 110 Meter

Width of Rafter 300 mm

Depth of Rafter 900 mm

Total No of Purlin on Both Side 948 No’s Weight of One Purlin 565 Kg

Dimension of Square Hollow Section Purlin 180*180*8 mm

Total Quantity of KALZIP Sheet Roof 14000 Sq. Meter

Total Quantity of Flashing Sheet 3152 Sq. Meter

Total Quantity of Sky Light Panel 2240 Sq. meter

Total Quantity of Rain Water Gutter 300 Rmt

Type of Welding Slot Welding, Butt Welding, Half V Groove Welding, Full

Penetration Weld,

In the month of February 2019, we accomplished an engineering milestone by completing the erection of Arch

shaped space frame structure 105 m x 72 m on either side of the new station building. It is one of its own kind

and a longest single span roof structure ever built in India. Erection of Space Frame over live OHE cables and

operational railway station with 5 tracks was a mammoth requiring engineering precision. With proper

planning, elaborate safety precautions and pre-decided sequence of erection, our team could achieve

successful erection of the rafters of space frame within approved railway traffic blocks. Each rafter was erected

in 4 separate segments, held properly by cranes till the joints were completed and also supports were erected

on platforms as additional safety

Space Frame

Drawing

Page 9: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Genesis for Form Based Codes (Part-2)

1.0 Layout Regulating Plan

Layout Plan for Station DevelopmentScheme shall refer to the set of drawings whichindicate arrangement of Railway Station,Railway operational areas, Sub-plots forcommercial development, common roads,common plazas, common green areas, sharedutility areas and areas reserved for futuredevelopment.

Layout Plan for a station area shall refer to thefollowing set of drawing-

A. Layout Regulating Plan- Shall indicate theRailway land holding, Land areas allocated

for Sub-Plots, Roads, ROBs RUBs, Parkinglots, Plazas, Green areas, Utility zones andland parcels reserved for futuredevelopment.

B. Green Area Layout Plan- Shall indicate allgreen areas for common use

C. Street Layout Plan- Shall indicate layout ofstreets, junctions, ROBs, RUBs, etc.

D. Movement Network Plans- As a set of atleast four drawings, it shows circulation andinfrastructure for movement of PublicTransport, Intermediate Public Transport,Pedestrians, Bicycles, and Private vehicles.

Layout Regulating Plan includes station areadevelopment and its connectivity withsurrounding plots, green area, etc.Comprehensive planning shall ensure thatRailway Land and all its sub-divisions like sub-plots, streets and green areas integrate thestation building with surroundingdevelopment and movement network whilecomplementing each other.

The integrated, transit and use planning atrailway land shall improve work and residentrelationship by providing mix of uses whichshall be complemented by adequate greenspace, public streets and pedestrian plazas foractive use by the public and passengers. Theprinciples of National TOD policy have beenadopted by IRSDC and shall inform thepreparation of these layout plans.

9

1.A. Layout Regulating Plan

Part -1 published in the February, 2020 issue of Newsletter. Link: http://irsdc.in/sites/default/files/IRSDC%20Newsletter-Feb%202020.pdf

Page 10: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

1.A. Layout Regulating Plan

Applicable objectives and

development guidelines for Layout

Regulating Plan adopted from

National TOD Policy (NTOD)-

5.1. To promote the use of public

transport by developing high density

zones in the railway land, which would

increase the share of transit and walk

trips made by the users to meet the

daily commute and long-distance travel

and resulting in reduction in pollution

and congestion in the station and

surrounding area.

5.2. To provide all the basic needs of

work/ job, shopping, public amenities,

entertainment in the railway land with

mixed land-use development which

would reduce the need for travel.

5.5. To develop inclusive habitat in the

railway land so that the people

dependent on public transport can live

in the livable communities within the

walkable distance of railway stations.

5.6. To promote the economically

weaker sections (EWS) and affordable

housing in the railway land by

allocating a prescribed proportion of

built-up area for them wherever

possible.

Applicable Norms for Layout Regulating Plan

adopted from National TOD Policy (NTOD)-

7.3. Mixed Use Development

7.3.2. Mix of land-uses are permitted as it helps in

optimization of physical infrastructure and resources.

7.3.4. Mix of uses within sub-plots can be achieved

either by horizontal mixing, i.e. separate activities in

separate buildings or vertical mixing i.e. combining

different activities within the same building.

7.4. Affordable Housing

7.4.1. 30% permissible built up area may be provided as

affordable housing (for example up to 60 sq.mt. area).

7.4.4. 10-15 percentage of residential built up area

within sub-plots may be provided as EWS housing. it

should also be ascertained that only low-income

families/ individuals are provided ownership of these

EWS units.

7.7. Street Oriented Buildings And Vibrant Public

Spaces

7.7.1. Retail and other 'active uses' with in sub-plot

should be supported on the ground floor along the

main streets, key intersections, interchange points and

parking garages to ensure high quality pedestrian

environments.

7.7.2. Buildings within sub-plot should be developed up

to the edge of the street as per relevant property

development cards or buildable volume cards. buildings

should be oriented so as to face the pedestrian facilities.

1.B Green Area Layout Plan

10

Page 11: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

1.B. Green Area Layout Plan

1.C. Street Layout Plan

11

Green Area Layout Plan specifiesthe location, sizes and areas of thegreen space and its integrationwith various functions. It providesnot only the recreational/entertainment, but also enhancingthe quality of life for all users.Green area layout also helps todefine safe movement ofpedestrians as per the desired lineof travel by the users. It alsoprovides relief in high density andhigh intensity user area likerailway stations.

Applicable objectives and development guidelines for Green

Area Layout Plan adopted from National TOD Policy (NTOD)-

5.7: To provide recreational/entertainment/ open spaces, required

for a good quality of life in the railway land.

Applicable Norms for Green Area Layout Plan adopted from

National TOD Policy (NTOD)-

7.7: STREET ORIENTED BUILDINGS AND VIBRANT PUBLIC

SPACES

7.7.8 Green areas as per approved green area layout plan shall

be preserved and maintained. some proportion of green area can

be utilized for kiosks, cafes, open gym and other suitable

activities.

Street Layout Plan defines Right of Way, Junctions, its geometries and circulation of vehicles

ensuring safety of the passengers and pedestrians. It also earmarked adequate and seamless

integration of pedestrian movement with conflict with vehicular movement.

Page 12: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

1.C. Street Layout Plan

12

Applicable objectives and development

guidelines for Street Layout Plan adopted from

National TOD Policy (NTOD)-

5.3: To establish a dense road network within the

development area for safe and easy movement and

connectivity of NMT and pedestrians between

various uses as well as modes of transportation.

5.4: To achieve reduction in the private vehicle

ownership, traffic and associated parking demand.

5.10: To reduce carbon footprints by shifting

towards environmentally friendly travel options for

the line haul as well as for access and egress trips.

Applicable Norms for Street Layout Plan

adopted from National TOD Policy (NTOD)-

7.5: MULTIMODAL INTEGRATION

7.5.1: Station area has been planned with high

quality integrated multimodal transport system

for the optimum use of the facilities by the

residents/users.

7.6: FOCUS ON PEDESTRIANS, CYCLISTS AND NMT

USERS

7.6.6: Traffic Calming: To promote a safe and

secure environment for pedestrian and NMT

users, necessary measures should be taken to

reduce speed as well as volume of motorized

traffic in the influence zone. Streets with row

less or equal to 12m, the maximum design

speed limit should be restricted to 20 kmph by

design by use of tabletop crossings, carriage

way surfaces etc. for all other streets, the design

speed should not exceed 40 kmph.

7.7: STREET ORIENTED BUILDINGS AND VIBRANT

PUBLIC SPACES

7.7.1: Street Vendors: designated spaces for

street vendors should be created while

designing the streets.

1.D. Movement Network Plans

Bicycle Network Plan

Public Transport Network Plan

Private Vehicle Transport Network Plan

Pedestrian Movement Network Plan

As overlays of Street Layout Plans,

Movement network plans ensure seamless

movement between railway land and

surrounding developments

NOTE-This section on Layout Plans have been elaborated

taking Chandigarh Station as a test case. The

drawings shown here are only for reference

purpose.

The subsequent newsletter shall delve into the

codes for the sub divisions of the typical Layout

Plan, like Sub-Plots, Streets etc.

Page 13: S R I J A Nirsdc.in/sites/default/files/IRSDC SRIJAN Newsletter... · 2020-04-18 · rooms five star, 120 rooms 3 star and 150 rooms of budget hotel), to all the 300 rooms of five

Issue No: 12 | March- 2020 | New DelhiNewsletter

Live Tenders/ Empanelment:

• Mixed Use Development on land parcel on leasehold rights basis along with Redevelopment Worksat Chandigarh Railway Station

• Mixed Use Development on land parcel on leasehold rights basis at Anand Vihar Railway Station• Mixed Use Development on land parcel on leasehold rights basis at Bijwasan Railway Station• RFQ for Redevelopment of Nagpur Railway Station• RFQ for Redevelopment of Gwalior Railway Station• RFQ for Redevelopment of Amritsar Railway Station• RFQ for Redevelopment of Sabarmati Railway station

Upcoming Tenders:

• RFQ for Redevelopment of Chhatrapati Shivaji Maharaj Terminus (CSMT) Railway Station on PPP mode.

• RFQ for Development of MMTH at Surat Railway Station on PPP mode.

FOR MORE INFORMATION, VISIT- https://irsdc.in/

Follow IRSDC on Twitter: @irsdcinfo | Facebook: facebook.com/IRSDC

IRSDC TENDERS

DISCLAIMER: This is an IRSDC publication meant for disseminating information on station development

program on Indian Railways. Any statement given in this newsletter cannot be construed as official

communication or assurance or official plan of IRSDC. All information given here must be checked from

official sources. IRSDC will not be responsible for any action taken or any impression gained on the basis

of any news/information given herein.

For feedback and enquiries, contact: [email protected] and [email protected]

Tel. : +91-11-68142400

IRSDC Address: Indian Railway Stations Development Corporation Limited, Tower-1, Konnectus Tower,

Bhavbhuti Marg, New Delhi- 110002.

Twitter- March, 2020 Highlights

13