‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Embed Size (px)

Citation preview

Page 1: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

‘S ORDER ON

AVAILABILITY BASED TARIFF

PRESENTATION BYC.V.ANAND

Sr.Supdt (Comml)

Page 2: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

NEED FOR ABT

• LOW FREQUENCY DURING PEAK HOURS (48.0-48.5 HZ)• HIGH FREQUENCY DURING OFF PEAK HOURS (50.5-51.0 HZ)

• RAPID & WIDE FREQUENCY CHANGES OF 1 HZ WITHIN 5 TO 10 Mts. FOR MANY HOURS IN A DAY

• VERY FREQUENT GRID DISTURBANCES,CAUSING TRIPPING OF GENERATING STATIONS

• IN 2 PART TARIFF FC+VC IS BEING CHARGED TO BENEFICIARIES IN PROPORTION TO ACTUAL ENERGY DRAWN

Page 3: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

TERMINOLOGYTWO PART ABT

1.FIXED COST *CAPACITY CHARGES

2.VARIABLE COST *ENERGY CHARGES

3.MONTHLY DATA *15 Mts TIME BLOCK

4.JMR READINGS *SEMS READINGS

OTHER TERMSDECLARED CAPABILITYSCHEDULED ENERGYUNSCHEDULED INTERCHANGE (UI)

Page 4: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

FEATURES OF ABT• RLDC WILL REVISE THE SCHEDULE IN CASE OF UNIT OUTAGE.IT

WILL BE EFFECTIVE FROM THE 4TH TIME BLOCK COUNTING THE TIME BLOCK IN WHICH REVISION IS ADVICED BY THE GENERATOR TO BE 1ST ONE.

• IN CASE OF TRANSMISSION LINE BOTTLENECK RLDC WILL REVISE THE SCHEDULE. IT WILL BE EFFECTIVE FROM THE 4TH TIME BLOCK

• REVISION BY GENERATORS WILL BE EFFECTIVE FROM THE 6TH TIME BLOCK

• IN CASE OF GRID DISTURBANCE,SCHEDULES OF GENERATION AND DRAWAL SHALL BE DEEMED TO HAVE BEEN REVISED TO ACTUALS.GRID DISTURBANCE & IT’S DURATION WILL BE CERTIFIED BY RLDC

• IN ABT,TRANSMISSION LOSSES WILL BE APPORTIONED IN PROPORTION TO DRAWALS

Page 5: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

TWO PART TARIFF CONCEPTS• FIXED PART RECOVERY

PLF RECOVERY0% 50% OF FIXED COST

0%-62.78% 50%-100% FIXED COST

62.78-68.48% DEAD BAND

>68.48% INCENTIVE STARTS• INCENTIVE AT 1 Ps/Kwh FOR EVERY 1%

INCREASE IN PLF RISE ABOVE 68.48%

(WHICH INCLUDES DEEMED GENERATION )

Page 6: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

TWO PART TARIFF CONCEPTS• FIXED PART TARIFF INCLUDES1.RETURN ON EQUITY (ROE) 16%

2.DEPRECIATION 7.84%

3.INTEREST ON WORKING CAPITAL

4.MISC TAXES

5.O&M COST- WHICH INCLUDES

a)EMPLOYEE COST

b)REPAIR& MAINTENANCE COST

c)OVERHEADS

Page 7: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

TWO PART TARIFF CONCEPTS• VARIABLE PART RECOVERY

AS PER NORMS1.AUX.POWER CONSPN 8.43%

2.COAL HEAT RATE 2464.72 Kcal/kWh

3.OIL HEAT RATE 34.28 Kcal/kWh • PRICE ESCALATION OF FUEL IS PROTECTED WITH

FUEL PRICE ADJUSTMENT.• FUEL COST= BASE COST+FUEL PRICE ADJ (FPA)• BASE COST AS DETERMINED IN 1992 IS 37.66

Ps/kWh

Page 8: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

APPLICABLE NTPC STATIONS

• APPLICABLE TO FOLLOWING STATIONS OF NTPC– NR

• NCTPP-DADRI (4*210 MW)

• FGUTPS UNCHAHAR (2*210 MW)

• DADRI GAS (829.78 MW)

• ANTA GAS (419.33 MW)

• AURAIYA GAS (663.36)

• SINGRAULI STPS (2000 MW)

• RIHAND STPS (1000 MW)

– WR

• KORBA STPS (2100 MW)

• VINDHYACHAL STPS (1260 MW)

• KAWAS GAS ( 656.2 MW)

• JHANOR GANDHAR GAS (657.39 MW)

Page 9: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

APPLICABLE NTPC STATIONS

• SR– RAMAGUNDAM STPS (2100 MW)

• ER– FARAKKA STPS (1600 MW)– KAHALGAON STPS (840 MW)– TALCHAR STPS (1000 MW)

Page 10: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

COMPONENTS OF

AVAILABILITY BASED TARIFF • CAPACITY CHARGES:

– ANNUAL FIXED CHARGES (AFC)REMAINS UNALTERED TILL NEW NOTIFICATION ON NORMS. (INCLUDING 16 % ROE)

– CAPACITY CHARGES AS PER DECLARED EQUIVALENT AVAILABILITY

– FROM 01-04-2001 TO 31-03-2004– 0-80 % AV-ANNUAL CAPACITY CHARGES =AFC* AV(%)/ 80 %– EACH BENEFICIARY SHALL PAY AS PER GOI ALLOCATED

SHARE .UNALLOCATED SHARE WILL ALSO BE ALLOCATED BY GOI TO THE BENEFICIARIES FROM TIME TO TIME.

– ALLOCATION CAN BE SURRENDERED OR TRADED IF NEEDED.– WEIGHTED AVERAGE OF CUMULATIVE CAPACITY CHARGES AS

PER DRAFT NOTIFICATION AND ADJUSTED AT END OF FINANCIAL YEAR.

Page 11: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

COMPONENTS OF AVAILABILITY BASED TARIFF

• INCENTIVES:• BASED ON SCHEDULED GENERATION ( NO DEEMED

GENERATION)• FROM 01-04-2001 TO 31-03-2004

ABOVE 77 %PLF- 50% OF FIXED CHARGES/Kwh AND ABOVE 90% PLF, RECOVERY WILL BE 50% OF ELIGIBLE INCENTIVE.

– PAYABLE AS PER THE INDIVIDUAL ALLOTTED CAPACITY.

• PAYMENT ON MONTHLY BASIS ,YEARLY ADJUSTED.

Page 12: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

COMPONENTS OF AVAILABILITY BASED TARIFF

• ENERGY CHARGES:

• AS PER EX-BUS :SCHEDULED

ENERGY .

ENERGY CHARGES=Rate of Energy

Charges X Scheduled Generation(Ex-Bus)

Page 13: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Proposed operational normsfor energy charges

• Gross Heat rate – GROSS HEAT RATE OF TURBINE GENERATOR

CYCLE:(GHR)– The comparison of norms with actual is given below for

Ramagundam: in kcal/kWh at loading of

Units Steam Pr 100% 80 % 60 % 50 %• Stg I 150 ksc Norms 2040 2080 2140 2175

Actual 1954 1982 2028 2065• Stg II 170ksc Norms 2040 2080 2140 2175

Actual 1987 2033 2100 2135

Page 14: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Proposed operational normsfor energy charges

• STEAM GENERATOR EFFICIENCY:(SGE)– SG EFFICIENCY:(SGE)

– SGE % = 92.5 - (50A+630(M+9H))

GCV• A-ASH CONTENT%,M-MOISTURE%,H-HYDROGEN%

• GCV= GCV(AS RECEIVED)-100 kcal/kWh

• M is increased by 1% to take into account heat lost.

• DAILY NET HEAT RATE:(DNHR)

• DNHR= GHR*100 *100

100-AEC SGE

• AEC=NORMATIVE AUX.ENERGY CONSUMPTION

Page 15: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Proposed operational normsfor energy charges

– AUX.ENERGY CONSUMPTION:– For Ramagundam unit with run of mines coal and closed

cycle cooling using wet cooling tower the norms given are:– Stage I 9.0 % instead of 9.5 % earlier– Stage II 7.5 % instead of 8.0 % earlier– Station AEC 7.93% instead of 8.43% earlier.

Page 16: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

COMPONENTS OF AVAILABILITY BASED TARIFF

• UNSCHEDULED INTERCHANGES (UI):– UI GEN / DRWAL = (ACTUAL GEN / DRAWL -

SCHEDULED GEN / DRAWL)– CALCULATED WITH 15 MIN TIME BLOCK.– RATES BASED ON AV.FREQUENCYOF THE TIME

BLOCKAVG..FREQUENCY( HZ) UI RATE ( PS / kWh)

• 50.5 AND ABOVE 0.00• BETWEEN 50.48 AND 50.50 5.6• BETWEEN 49.02 AND 49.04 414.49• BELOW 49.02 420.00• BETWEEN 49.02 AND 50.5 LINEAR IN 0.02 HZ STEP.

5.6 Ps/kWh TO BE CALCULATED

Page 17: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

OTHER ISSUES IN AVAILABILITY BASED TARIFF

• SCHEDULING :AS PER IEGC CODE.

• DEMONSTRATION OF DECLARED CAPABILITY:• RLDC MAY ON ITS OWN OR REQUESTED BY BENEFICIERIES

ASK FOR DEMONSTRATION OF DECLARED CAPABILTY.• PENALTY ON FAILING TO DEMONSTRATE /

MIS DECLARATION:– TWO DAYS FIXED CHARGES FOR FIRST TIME.– FOUR DAYS FIXED CHARGES FOR SECOND TIME.– SAME WAY IN GEOMETRICAL PROGRESSION .– CONTINUED GAMING BEYOND FIVE TIMES IN A YEAR

CAN BE DEALT AS PER SECTION 45 OF ERC ACT.

Page 18: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

OTHER ISSUES IN AVAILABILITY BASED TARIFF

• METERING AND ACCOUNTING:– METERING -INSTALLATION,TESTING,OPERATION

-MAINTENANCE OF METERS AND COLLECTION- TRASNSPORTATIONAND PROCESSING OF DATA REQUIRED FOR ACCOUNTING OF ENERGY CHARGES AND AVAILABILITY, FREQUENCY ON 15 MIN BLOCK SHALL BE PROVIDED BY PGCIL/RLDC.

– DATA PROCESSED SHALL BE SUPPLIED BY RLDC TO REB FOR REGIONAL ENERGY ACCOUNTING AND UI CHARGES FOR BILLING ON MONTHLY BASIS.

Page 19: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

FINAL ABT ORDER• TARGET GENERATION IS SET AT 80%

AVAILABILITY• INCENTIVE STARTS AT 77% PLF (SCHEDULED

GENERATION)• NO DEEMED GENERATION CONCEPT• INCENTIVE AS 50% OF FIXED CHARGES/Kwh FOR

GENERATION BEYOND 77% PLF WITH A CEILING OF 21.5 Ps/Kwh.

• BEYOND 90% PLF, INCENTIVE WILL BE ONLY 50% OF THE INCENTIVE ELIGIBLE.

• ROE IS RETAINED AT 16%• ALL OPERATIONAL NORMS ARE RETAINED AS OF

NOW

Page 20: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

FINAL ABT ORDER• SETTLEMENT PERIOD PROPOSED - DAILY BASIS

(INSTEAD OF 15 MINUTES)

• SEC.FUEL OIL CONSPN - 2ml/kwh (PROPOSED)

(INSTEAD OF 3.5 ml/kwh)

• AUX.POWER CONSPN - REDUCED BY 0.5%

(EARLIER 8.43%) - PROPOSED

• HEAT RATE CORRECTION - 4% INSTEAD OF 10% AS REQUESTED BY NTPC (PROPOSED)

• BOILER EFFICIENCY CORRECTION - 0.296% INSTEAD OF 3.72% AS REQUESTED BY NTPC

• HEAT RATE,COAL CONSPN,SEC.F.O CONSPN,PLF,AVAILABILITY,AUX.POWER DATA TO BE SUBMITTED TO CERC QUARTERLY TO SET THE NORMS IN THE NEXT REVIEW OF TARIFF FIXATION IN THE YEAR 2004

Page 21: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

FIXED COST CALCULATION• 1st Month = (1xACC1)/12• 2nd Month = (2xACC2-1xACC1)/12• 3rd Month = (3xACC3-2xACC2)/12• 4th Month = (4xACC4-3xACC3)/12• 5th Month = (5xACC5-4xACC4)/12• 6th Month = (6xACC6-5xACC5)/12• 7thMonth = (7xACC7-6xACC6)/12• 8thMonth = (8xACC8-7xACC7)/12• 9th Month = (9xACC9-8xACC8)/12• 10th Month = (10xACC10-9xACC9)/12• 11th Month = (11xACC11-10xACC10)/12• 12th Month = (12xACC12-11xACC11)/12

ACC:1-12 REPRESENTS THE AMOUNT OF ANNUAL CAPACITY CHARGES, CORRESPONDING TO THE AVAILABILITY FOR THE CUMULATIVE PERIOD UPTO THE END OF CALCULATED MONTH

Page 22: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

CONCERNS FOR NTPC ,RAMAGUNDAM:

• CAPABILITY DECLARATIONS ARE CONSIDERED FOR EQUI.AVAILABILITY.HENCE IT NEED TO BE FAIRLY ACCURATE.

• UNDER DECALRATION MAY NOT FETCH ANYTHING BUT OVER DECLARTION WILL BE PENALISED HEAVILY DUE TO LOWER FREQUENCY RANGE.

• INTENTIONAL OVER DECLARATION CAN BE PUNISHED HEAVILY IF WE ARE UNABLE TO DEMONSTRATE WHEN REQUESTED.

• UNIT TRIPPINGS / OUTAGES WILL ALWAYS ATTRACT UI.

• NO DEEMED GENERATION ON PLF FOR BACKING DOWN.

• AS PLF (WITHOUT DEEMED GEN ) IS USED FOR INCENTIVE, DURING HIGH FREQUENCY TIMES ,GENERATING ABOVE THE SCHEDULE WILL NEITHER EARN FIXED CHARGES NOR VARIABLE CHARGES .

Page 23: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

CONCERNS FOR NTPC ,RAMAGUNDAM

• INCENTIVE PORTION IS REDUCED

• NORMS IN BOTH CAPACITY AND ENERGY CHARGES ARE YET TO BE REVISED,HENCE PRESENT NORMS REMAINS SAME.

• ENERGY CHARGES ARE BASED ON SCHEDULED, NOT ON ACTUAL GEN. HENCE STICKING TO SCHEDULE AS PER FREQUNCY IS THE RIGHT WAY.

• MAJOR EQUIPMENT OUTAGES IN STAGE- II WILL INVITE UI.

• ONLY IMPROVEMENT IN MARGINAL CONTRIBUTIONS CAN EARN PROFIT

Page 24: ‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)

Thank You