AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF
SCHEDLING PROCEEDURESCHEDLING PROCEEDUREANDAND
SETTLEMENT MECHANISMSETTLEMENT MECHANISMUNDER ABT REGIMEUNDER ABT REGIME
T. SRINIVAST. SRINIVASMANAGER,SRLDCMANAGER,SRLDC
BANGALOREBANGALORE
LINKS
GIST OF CGS BRIEF OF ABT SCHEDULINGPROCEDURE
SETTLEMENT SYSTEM
UI
SOUTHERN REGIONAL GRIDSOUTHERN REGIONAL GRID▀ Central Generating Stations in the Region are
• Ramagundam Super Thermal Power Stn. : 2,600 MW (200x3 + 500x4)
• Neyveli Lignite Corporation Ltd. - II : 1,470 MW (210 x 7)
• Madras Atomic Power Station : 390 MW (170 x 1 + 220X1)
• Kaiga Atomic Power Station : 440 MW (220x2)
• NLC EXPANSION TPS 1 : 420 MW (210X2)
• TALCHER STAGE II : 2000 MW (500X4) situated
in ER▀ Beneficiaries in southern Region are
. ANDHRA PRADESH
• KARNATAKA• KERALA• TAMIL NADU• Union Territory of Pondicherry• NLCMINES• GOA has share of 100MW from RSTPS
CONTROL AREASCONTROL AREAS
REGIONAL GRID
SEB’S GRID
CS -3CS - 2
CS - 1
CENTRALSHARE
STATEGENR
STATEIPP
DISTR-B
DISTR- A
DISTR- C
SEB - A SEB -CSEB -B
SLDCCOORDINATESDIRECTS
RLDCCOORDINATES
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
VISAKHAPATNAM
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAHDAVANAGERE
KAIGA
115
317
RSTPP
130x216
4x2
182
151
181
173
302
308172
277
279
155
178x
2
PONDICHERY
BANGALORE
SIRSI
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
PALLOM
KAYANKULAMEDAMON
JEYPORE
63
187
2x78
2x221
54
HOSUR
KADRA
KODASAALY
Nagjhari
1
120
60
MAPS
P
SSLMM
MMDP
THIRUVANATHAPURAM
ALMATHI
NELLORE
400 KV LINE PRESENTLY
OPERATED AT 220 KV
NELAMANGALA
KURNOOL
GAZUWAKA(AP)
SIMHADRI NTPC
HIRIYUR
189
195
267x
2
258
242
175
179
127
130x
2
221x2
146x252x2
197x2
301x2
8x4
15x2
300
28
330
TALGUPPA
AC TRANSMISSION NETWORK IN AC TRANSMISSION NETWORK IN SRSR
KOODANKULAM
THIRNELVALI
KHAMMAM
VIJAYAWADAN’SAGAR
GAZUWAKA
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
GUTTUR
KAIGA
RSTPP
BHADRAVATI
BANGALORE
MUNIRABAD
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
TALCHER
JEYPORE
HOSUR
P
SSLMM
MMDP
THIRUVANANTHAPURAM
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI NTPC
HIRIYUR
TALGUPPA
SIRSI
CUDDAPAH1000 MW HVDC BACK TO BACK LINK
2000 MW HVDC BIPOLE
500 KV HVDC LINE
400 KV LINE POWERGRID
400 KV LINE APTRANSCO
400 KV LINE KPTCL
400 KV LINE OPERATED AT 220 KV
THERMAL GENERATING STATION
NEYVELI TPS – 1 (EXP) EXP
400KV SUB-STATION
KHAMMAM
VIJAYAWADAN’SAGAR
GAZUWAKA
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
GUTTUR
KAIGA
RSTPP
BHADRAVATI
BANGALORE
MUNIRABAD
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
TALCHER
JEYPORE
HOSUR
P
SSLMM
MMDP
THIRUVANANTHAPURAM
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI NTPC
HIRIYUR
TALGUPPA
SIRSI
CUDDAPAH1000 MW HVDC BACK TO BACK LINK
2000 MW HVDC BIPOLE
500 KV HVDC LINE
400 KV LINE POWERGRID
400 KV LINE APTRANSCO
400 KV LINE KPTCL
400 KV LINE OPERATED AT 220 KV
THERMAL GENERATING STATION
NEYVELI TPS – 1 (EXP)EXP
400KV SUB-STATION
KHAMMAM
VIJAYAWADAN’SAGAR
GAZUWAKA
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
GUTTUR
KAIGA
RSTPP
BHADRAVATI
BANGALORE
MUNIRABAD
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
TALCHER
JEYPORE
HOSUR
P
SSLMM
MMDP
THIRUVANANTHAPURAM
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI NTPC
HIRIYUR
TALGUPPA
SIRSI
CUDDAPAH1000 MW HVDC BACK TO BACK LINK
2000 MW HVDC BIPOLE
500 KV HVDC LINE
400 KV LINE POWERGRID
400 KV LINE APTRANSCO
400 KV LINE KPTCL
400 KV LINE OPERATED AT 220 KV
THERMAL GENERATING STATION
NEYVELI TPS – 1 (EXP)EXP
400KV SUB-STATION
GENERATORS ABOVE 1000 MW
GENERATORS 500 – 1000 MW
GENERATORS BELOW 500 MW
- HYDRO
- THERMAL
- GAS / NAPTHA
- NUCLEAR
LOAD 500-1500 MW
LOAD 200-500 MW
MAJOR GENERATORS
SCATTERED ACROSS SR
MAJOR LOAD CENTRES SCATTERED ACROSS SR
KOLAR
FROM TALCHER (4 x 500MW)
±500KV
KUDAKULAM APP
2 x 1000MW BACK
CONVENTIONAL METHOD OF CONVENTIONAL METHOD OF OPERATIONOPERATION
SHARE BASED ON ACTUAL GENERATION:-SHARE BASED ON ACTUAL GENERATION:- DOES NOT REFLECT THE AVAILABILITY DOES NOT REFLECT THE AVAILABILITY
OF ISGS –RATHER ITS EX-BUS OF ISGS –RATHER ITS EX-BUS GENERATIONGENERATION
IS FIXED AND TIME INVARIANTIS FIXED AND TIME INVARIANT INSENSITIVE TO CONSTRAINTSINSENSITIVE TO CONSTRAINTS DOES NOT ALLOW FOCUSED CHANGESDOES NOT ALLOW FOCUSED CHANGES
SUB OPTIMAL UTILIZATION OF SUB OPTIMAL UTILIZATION OF RESOURCESRESOURCES
CONVENTIONAL METHOD OF ENERGY CONVENTIONAL METHOD OF ENERGY ACCOUNTINGACCOUNTING
PAYMENTS ARE MADE AS PER THE PAYMENTS ARE MADE AS PER THE DRAWALSDRAWALS
OVER AND UNDER DRAWALS - OVER AND UNDER DRAWALS - UNAVOIDABLEUNAVOIDABLE
UNUTILISED RESOURCES ARE OFTEN UNUTILISED RESOURCES ARE OFTEN BILLED.BILLED.
INFLEXIBLE – BILATERALS, SHORT INFLEXIBLE – BILATERALS, SHORT TERM CONTRACTS – NOT ALLOWEDTERM CONTRACTS – NOT ALLOWED
ADVANTAGES OF SCHEDULINGADVANTAGES OF SCHEDULING
SCHEDULE REFLECTS BOTH –SCHEDULE REFLECTS BOTH –AVAILABILITY OF ISGS & REQUIREMENT AVAILABILITY OF ISGS & REQUIREMENT OF CONSTITUENTOF CONSTITUENT
FLEXIBILITYFLEXIBILITY TIME VARIANT - MIRRORS GRID TIME VARIANT - MIRRORS GRID
BEHAVIOURBEHAVIOUR SENSITIVE TO CONSTRAINTSSENSITIVE TO CONSTRAINTS FOCUSED – SCHEDULE IS NON GENERICFOCUSED – SCHEDULE IS NON GENERIC OPTIMAL UTILIZATION OF RESOURCESOPTIMAL UTILIZATION OF RESOURCES ECONOMIC OPERATIONECONOMIC OPERATION INDEPENDENT OF SETTLEMENT SYSTEM.INDEPENDENT OF SETTLEMENT SYSTEM.
C H A P T E R - 7 SCHEDULING & DESPATCHING CODE
Demarcation of Responsibilities
. Each Region is a loose power pool and each state is a notional Control Area. (Decentralized Scheduling and Dispatch)
. RLDC can direct SLDCs/ISGSs in case of system contingencies, to change drawal/injection and if time permits, RLDC will ascertain whether situation
has arisen due to => Deviations from schedule
=> Bilateral Exchange or Short Term Open Access
These can be terminated by RLDC. . All joint/bilateral agreements to be filed with RLDC/REB Secretariat . SEMs to be installed by CTU at all interconnection points for recording Actual Interchanges and MVARh drawals.. Regional Energy Accounting to be done by REB Sectt.based on metered and processed data (Actual net injection of ISGS and actual net drawal of each
beneficiary) received from RLDC .SRLDC/Comml/IEGC/33
Settlement Systems* . Accounting on weekly basis
. Capacity and Energy Charges billing on monthly basis
• Billing of adjustments for deviations on weekly basis
• RLDC to furnish data to REB Secretariat by Thursday noon for week ending Sunday
. REB Secretariat to finalize and issue REA by Tuesday, for seven day period
ending on penultimate Sunday
. All data to be retained for 20 days (for RLDC & REB) for verification.
Commercial Mechanism * Availability Based Tariff
( a) Capacity Charge (b) Energy Charge (c) Adjustment for Deviations
SRLDC/Comml/IEGC/34
Scheduling Process
On Day-l
10 AM10 AM ISGSs advise foreseen plant-wise ex- . power plant MW, ISGSs advise foreseen plant-wise ex- . power plant MW, MWh * capability for next dayMWh * capability for next day
11 AM11 AM RLDC advises SEBs their MW, MWh* shares in foreseen RLDC advises SEBs their MW, MWh* shares in foreseen ISGSs' availability ISGSs' availability
3 PM 3 PM SLDCs furnish their ,time-wise MW requisition from the SLDCs furnish their ,time-wise MW requisition from the above, and schedule of bilateral exchanges, if anyabove, and schedule of bilateral exchanges, if any
5 PM5 PM RLDC issues' despatch schedules' for ISGSs and 'net RLDC issues' despatch schedules' for ISGSs and 'net drawal schedules' for SEBs, for each hour the next day drawal schedules' for SEBs, for each hour the next day starting at midnightstarting at midnight
10 PM10 PM SLDCs may inform any change of the above or bilateral SLDCs may inform any change of the above or bilateral exchanges to RLDC, if required by any new development exchanges to RLDC, if required by any new development during the dayduring the day
11 PM11 PM Schedules frozen for the next day. RLDC Issues final Schedules frozen for the next day. RLDC Issues final drawal schedules to each State & Despatch schedule to drawal schedules to each State & Despatch schedule to each ISGS each ISGS SRLDC/Comml/IEGC/41
On Day 0
On Day + 1
.
RLDC to issue before-the- fact Capacity Declaration/Schedules finally implemented by RLDC (Datum for accounting and working out
average ex-power plant capability).
Time block tTime block t Any State may revise drawal schedule Any State may revise drawal schedule from any/all ISGS Any ISGS may from any/all ISGS Any ISGS may revise their foreseen capability revise their foreseen capability
Time block t+3Time block t+3 RLDC to issue revised ‘drawal RLDC to issue revised ‘drawal schedules' and despatch schedulesschedules' and despatch schedules
SRLDC/Comml/IEGC/42
Scheduling ProcessScheduling for the next day • Every day by 10 AM, RLDC collects the foreseen plant-wise ex-power plant MW capability of ISGSs for the next day
• By 11 AM, RLDC advises SEBs, on a 15 minutes blockwise level, their entitled MW shares from each ISGSs’ availability
• By 3 PM, RLDC receives block-wise MW requisition from SLDCs and also the schedule of bilateral exchanges, if any
• By 5 PM, RLDC issues ‘despatch schedules’ for ISGSs and ‘net drawal schedules’ for SEBs, 15 minutes block-wise for the next day starting at midnight.
• Upto 10 PM SLDCs may inform any change of the above or bilateral exchanges to RLDC, if required by any new development during the day.
• At 11 PM Schedules are frozen for the next day. RLDC issues final drawal schedules to each State & Despatch schedule to each ISGS.
Scheduling Process Any change of schedule for the current day
• In case of any forced outage of a unit, or in case of any transmission bottleneck or in the interest of better system operation, RLDC may revise the schedules. The revised schedules will become effective from the 4th time block.
• ISGSs and/or SLDCs may also revise their schedules during a day. The revised schedules will become effective from the 6th time block.
REVISION OF SCHEDULES/REQUISITIONSREVISION OF SCHEDULES/REQUISITIONS
A)A) OUTAGE OF GENERATING UNITOUTAGE OF GENERATING UNITB)B) REVISED DECLARATION OF AVAILABILITY BY ISGSREVISED DECLARATION OF AVAILABILITY BY ISGSC)C) OUTAGE OF A TRANSMISSION ELEMENTOUTAGE OF A TRANSMISSION ELEMENTD)D) UNFORESEEN LOAD-CRASHUNFORESEEN LOAD-CRASH
TAKES EFFECT FROMTAKES EFFECT FROM
A)A) 44THTH TIME BLOCK IN CASE OF TIME BLOCK IN CASE OF- FORCED OUTAGE OF A GENERATING UNITFORCED OUTAGE OF A GENERATING UNIT- TRANSMISSION CONSTRAINTTRANSMISSION CONSTRAINT- GRID DISTURBANCEGRID DISTURBANCE- SUO MOTO BY RLDCSUO MOTO BY RLDC
B) 6B) 6THTH TIME BLOCK IN CASE OF TIME BLOCK IN CASE OF- REVISION OF DECLARED AVAILABILITY BY ISGSREVISION OF DECLARED AVAILABILITY BY ISGS-- REVISION OF REQUISITIONS BY BENEFICIARIESREVISION OF REQUISITIONS BY BENEFICIARIES
A new scheduling software in Visual Basic A new scheduling software in Visual Basic is developed by SRLDC which has the is developed by SRLDC which has the following advantages:following advantages: - Minimize data entry errors.- Minimize data entry errors.- Faster reconciliation of schedules- Faster reconciliation of schedules- Facilitate electronic data transfer - Facilitate electronic data transfer - Modularly structured, simple and - Modularly structured, simple and practicablepracticable
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
The station-wise (Ex-bus) capability The station-wise (Ex-bus) capability would be submitted by the ISGSs would be submitted by the ISGSs in the specified format. ISGSs in the specified format. ISGSs would declare the capability i.e. the would declare the capability i.e. the MW and MWH quantum in the MW and MWH quantum in the absolute values and not in the absolute values and not in the form of some relative percentages form of some relative percentages or in any other manner.or in any other manner.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
Based on the declared capability Based on the declared capability & the allocations of different & the allocations of different States / Beneficiaries in different States / Beneficiaries in different ISGSs, the station wise ISGSs, the station wise entitlements would be worked entitlements would be worked out and intimated to all the out and intimated to all the States/Beneficiaries by SRLDC.States/Beneficiaries by SRLDC.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
The requisitions would be The requisitions would be submitted by the States in the submitted by the States in the specified format. The States would specified format. The States would submit the requisitions indicating submit the requisitions indicating the quantum desired against the the quantum desired against the given entitlement, and not the given entitlement, and not the quantum surrendered. The quantum surrendered. The requisitions in case of nuclear and requisitions in case of nuclear and run of the river hydro stations run of the river hydro stations would be equal to the entitlements. would be equal to the entitlements.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
The details of the despatch and drawal The details of the despatch and drawal schedules and Unrequisitioned, schedules and Unrequisitioned, surpluses shall be made by SRLDC and surpluses shall be made by SRLDC and the information would be exchanged the information would be exchanged through fax and/or through FTP. through fax and/or through FTP.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
In the event of any unrequisitioned In the event of any unrequisitioned surpluses, the Owner State ( the surpluses, the Owner State ( the State to which the share actually State to which the share actually belongs and pays the capacity belongs and pays the capacity charges) may find out a suitable charges) may find out a suitable Buyer/ Willing State to take such Buyer/ Willing State to take such unrequisitioned surplus and/or the unrequisitioned surplus and/or the Buyer/Willing State may contact the Buyer/Willing State may contact the Owner State for such exchange. The Owner State for such exchange. The agreed Short Term Open Access agreed Short Term Open Access Transactions be intimated / consented Transactions be intimated / consented to SRLDC by both the States for to SRLDC by both the States for incorporating in the final schedules. incorporating in the final schedules.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
Any unrequisitioned surpluses still Any unrequisitioned surpluses still available, can be agreed for available, can be agreed for Short Term Open Access Short Term Open Access Transactions between the Transactions between the concerned ISGS and one or more concerned ISGS and one or more desiring States. The agreed Short desiring States. The agreed Short Term Open Access Transactions Term Open Access Transactions from ISGS to a State be intimated from ISGS to a State be intimated to SRLDC by both the agencies to SRLDC by both the agencies (ISGS as well as States) for (ISGS as well as States) for incorporation in the final schedule. incorporation in the final schedule.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
During the current day in case During the current day in case the Owner State requisitions the Owner State requisitions back its surrendered share, then back its surrendered share, then the same is withdrawn from the the same is withdrawn from the other State/ States to which it other State/ States to which it was allocated as surplus energy was allocated as surplus energy and the schedules are revised in and the schedules are revised in line with the Grid Code.line with the Grid Code.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
While making or revising their While making or revising their declaration of capability the declaration of capability the generators shall ensure that the generators shall ensure that the declared capability during peak declared capability during peak hours is not less than during hours is not less than during other hours.other hours.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY While communicating the requisitions, the While communicating the requisitions, the States shall ensure that:States shall ensure that:
maximum economy and efficiency in the maximum economy and efficiency in the operation of the power system in the State operation of the power system in the State is achieved while requisitioning and /or is achieved while requisitioning and /or surrendering power from different ISGSs surrendering power from different ISGSs vis-à-vis from their own stations. vis-à-vis from their own stations.
the requisitions are operationally the requisitions are operationally reasonable, particularly in terms of reasonable, particularly in terms of ramping-up / ramping-down rates and ratio ramping-up / ramping-down rates and ratio between minimum and maximum between minimum and maximum generation levels, and are in line with the generation levels, and are in line with the agreed philosophy in the region amongst agreed philosophy in the region amongst different agencies. different agencies.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
In the event of despatch schedule in In the event of despatch schedule in respect of a particular ISGS, (as agreed respect of a particular ISGS, (as agreed between ISGS and the State constituents in between ISGS and the State constituents in respect of thermal units it would be taken respect of thermal units it would be taken as 70%) the changes in requisition between as 70%) the changes in requisition between two successive blocks is higher than a ramp two successive blocks is higher than a ramp up/down quantum, then the State/States up/down quantum, then the State/States due to which such anomaly is being due to which such anomaly is being experienced would be requested by SRLDC experienced would be requested by SRLDC to change its/their requisition in that to change its/their requisition in that particular ISGS, to make the schedule particular ISGS, to make the schedule operationally reasonable. operationally reasonable.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
While issuing the final schedules, While issuing the final schedules, SRLDC shall check that the schedules SRLDC shall check that the schedules do not give rise to any transmission do not give rise to any transmission constraints. In case any imperssible constraints. In case any imperssible constraints/ anomalies are foreseen, constraints/ anomalies are foreseen, the RLDC shall moderate the the RLDC shall moderate the schedules to the required extent , schedules to the required extent , under intimation to the concerned under intimation to the concerned agencies.agencies.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
During the periods of low demand in the During the periods of low demand in the region, in spite of all efforts if the despatch region, in spite of all efforts if the despatch schedule of an ISGS(s) during certain blocks schedule of an ISGS(s) during certain blocks in the off-peak period remains below the in the off-peak period remains below the minimum agreed value, and the concerned minimum agreed value, and the concerned ISGS (s) is not able to operate the units ISGS (s) is not able to operate the units due to technical constraints, then the due to technical constraints, then the concerned ISGS(s) may close down some concerned ISGS(s) may close down some unit(s) in consultation with SRLDC and the unit(s) in consultation with SRLDC and the despatch schedule of the ISGS(s) shall be despatch schedule of the ISGS(s) shall be revised accordingly. Under such a situation revised accordingly. Under such a situation the net drawal schedule of the beneficiary the net drawal schedule of the beneficiary (ies) having share in the ISGS(s), may get (ies) having share in the ISGS(s), may get reduced during peak hours also. reduced during peak hours also.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
If at any point of time SRLDC If at any point of time SRLDC observes that there is need for observes that there is need for revision of schedules in the revision of schedules in the interest of better system interest of better system operation, it may do so on its operation, it may do so on its own and make it effective in line own and make it effective in line with the grid code provisions. with the grid code provisions.
SCHEDULING METHODOLOGYSCHEDULING METHODOLOGY
While entering into a bilateral While entering into a bilateral agreement, the concerned agreement, the concerned parties shall ensure that the parties shall ensure that the agreements are clear and agreements are clear and explicit and contains all the explicit and contains all the relevant details which may be relevant details which may be necessary from scheduling and necessary from scheduling and computation of energy flow.computation of energy flow.
BACK
Payment to Inter State Generating Payment to Inter State Generating Stations (ISGS) from beneficiaries Stations (ISGS) from beneficiaries
underunder
Availability Based Tariff Availability Based Tariff (ABT)(ABT)
Capacity chargesCapacity charges Energy chargesEnergy charges Unscheduled Interchange (UI)Unscheduled Interchange (UI)
CAPACITY CHARGECAPACITY CHARGE
Capacity charge will be related Capacity charge will be related to ‘availability’ of the to ‘availability’ of the generating station and the generating station and the percentage capacity allocated percentage capacity allocated to the state. ‘Availability’ for to the state. ‘Availability’ for this purpose means the this purpose means the readiness of the generating readiness of the generating station to deliver ex-bus output station to deliver ex-bus output expressed as a percentage of expressed as a percentage of its rated ex-bus output its rated ex-bus output capability.capability.
ENERGY CHARGEENERGY CHARGE
Energy charges shall be worked Energy charges shall be worked out on the basis of a paise per out on the basis of a paise per kwh rate on ex-bus energy kwh rate on ex-bus energy scheduled to be sent out from scheduled to be sent out from the generating station as per the generating station as per the following formulathe following formula
Energy chargesEnergy charges = = Rate of Rate of energy energy charges (paise/kwh) x charges (paise/kwh) x ScheduledScheduled Generation (ex-bus Generation (ex-bus MWh)MWh)
UNSCHEDULED INTERCHANGE (U I) UNSCHEDULED INTERCHANGE (U I) ::
Variation in actual generation / drawal with Variation in actual generation / drawal with respect to scheduled generation / drawal shall respect to scheduled generation / drawal shall be accounted for through Unscheduled be accounted for through Unscheduled Interchange (UI).Interchange (UI).
UI for generating station shall be equal to its UI for generating station shall be equal to its total actual generation minus its scheduled total actual generation minus its scheduled generation.generation.
UI for beneficiary shall be equal to its total UI for beneficiary shall be equal to its total actual drawal minus its total scheduled actual drawal minus its total scheduled drawal.drawal.
UNSCHEDULED INTERCHANGE (U I) UNSCHEDULED INTERCHANGE (U I) ::
UI shall be worked out for each 15 UI shall be worked out for each 15 minute time block.minute time block.
Charges for all UI transactions Charges for all UI transactions shall be based on average shall be based on average frequency of the time block.frequency of the time block.
UI rates shall be frequency UI rates shall be frequency dependent and uniform dependent and uniform throughout the country.throughout the country.
0
50
100
150
200
250
300
350
400
450
500
550
600
650
48.9 49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5 50.6 50.7 50.8 50.9 51
Frequency ----------->
UI ra
te
-----
------
------
>
Below 49.0 Hz UI rate =570 p/u
At 50.0 Hz UI rate =150 p/u
At 49.8 Hz UI rate =210 p/u
Above 50.5 Hz UI rate =0 p/u
UI RATE
Rate of Unscheduled Drawal/Injection
Frequency Frequency (Hz)(Hz)
Rate Rate (p/u)(p/u)
Above 50.5Above 50.5 00
50.050.0 150150
49.849.8 210210
49.0 and 49.0 and belowbelow
570570
AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF
(A)(A) CAPACITY CHARGECAPACITY CHARGE
(B)(B) ENERGY CHARGEENERGY CHARGE
(C)(C) ADJUSTMENT FOR DEVIATIONS ADJUSTMENT FOR DEVIATIONS
(U I CHARGE)(U I CHARGE)(A) = (A) = a function of the Ex-Bus MW availability of a function of the Ex-Bus MW availability of
Power Plant for the day declared before the day Power Plant for the day declared before the day starts x SEB’s % allocation from the plantstarts x SEB’s % allocation from the plant
(B) = MWh for the day as per Ex-Bus drawal schedule (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x for the SEB finalised before the day starts x Energy charge rateEnergy charge rate
(C) = (C) = Σ (Actual energy interchange in a 15 minute time Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the block – scheduled energy interchange for the time block) x UI rate for the time block time block) x UI rate for the time block
TOTAL PAYMENT FOR THE DAY = (A) + (B) TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C) ± (C)
FEATURES :FEATURES : ((A) and (B) do not depend on actual plant A) and (B) do not depend on actual plant
generation / drawal. No metering required generation / drawal. No metering required for this as they are based on off-line for this as they are based on off-line figures. All deviations taken care of by (C)figures. All deviations taken care of by (C)
No complication regarding deemed No complication regarding deemed generation.generation.
Perpetual incentive for maximizing Perpetual incentive for maximizing generation and reducing drawal during generation and reducing drawal during deficit, but no incentive to over generate deficit, but no incentive to over generate during surplus.during surplus.
BACK
UI IN SR (FROM 01/01/03 TO 04/12/05)UI IN SR (FROM 01/01/03 TO 04/12/05)
TOTAL UI TURNOVER :- 10141 MUTOTAL UI TURNOVER :- 10141 MU
TOTAL UI AMOUNT DISBURSED:- 1933 TOTAL UI AMOUNT DISBURSED:- 1933 CRCR
AVG WEEKLY TRANSACTION:- 66 MUAVG WEEKLY TRANSACTION:- 66 MU
AVG WEEKLY UI AMOUNT DISBURSED:- 13 CRAVG WEEKLY UI AMOUNT DISBURSED:- 13 CRContd..
APAP KARKAR KERKER TNTN PONDPONDYY
Total UI Total UI exported(-) / exported(-) / Imported(+) Imported(+)
in MUsin MUs
--46884688 47344734 679679 17021702 -199-199
Total amount Total amount paid in paid in
Crores Rs.Crores Rs.-899-899 862862 117117 448448 -36-36
Average rate Average rate of UI in of UI in
paise/unitpaise/unit192192 182182 173173 263263 183183
SUMMARY OF UI – 153WKSSUMMARY OF UI – 153WKS(FROM 01/JAN/03 TO 04/DEC/05)(FROM 01/JAN/03 TO 04/DEC/05)
Contd..
OD UD AND UI RATES OF CONSTITUENTS
182 179
234
200184
149
379
185
0
50
100
150
200
250
300
350
400
AP KAR KER TN
RA
TE
(P
AIS
E/U
NIT
)
OVER DRAWAL (PURCHASE) UNDER DRAWAL (SOLD)
226MU
4914MU
4766MU
31MU
1315MU
2281MU
579MU
636MU
Inter Regional Links
Present IR CapacityPresent IR Capacity= 9,500 MW= 9,500 MW
700 MW700 MW
1200MW1200MW
2000MW2000MW
1200 MW1200 MW
900 MW900 MW30,500 MW
16,000
32,700 MW
34,500 MW
2300
1850 MW1850 MW
1650 MW1650 MW
Contd..
DEVELOPMENT OF NATIONAL GRID
NER
ER
NR
WR
SR
EXISTING
500MW
MW1000
MW500
GAZUWAKA
CHANDRAPUR
VINDHYACHAL
SASARAM
UNDERCONST.
EXISTING
400 kV
220 kV
BONGAIGAONBIRPARA
MALDA
KORBA BUDHIPADAR
KOLHAPUR
BELGAUM
U.SILERU
BALIMELA
DEHRISAHUPURI
MALANPUR
AURAIYA
PHASE-I(By 2002)
HVDC STATION
KOLAR
(KARNATAKA)
TALCHER
ORISSA)
TALCHER KOLAR HVDC LINE
LENGTH:100 KMS
INTER REGIONAL LINKS
CHIKKODI
KOLHAPUR
UJJAIN
KOTLA
INTER REGIONAL EXCHANGES
265
221
150 138
0
50
100
150
200
250
300
350
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
IMPORT BY SR FROM WR (668 MU)
IMPORT BY SR FROM ER (805 MU)
INTER REGIONAL EXCHANGES
146 139
286 295
0
50
100
150
200
250
300
350
SR RATE WR RATE SR RATE ER RATE
RA
TE
(P
AIS
A/K
WH
) -
>
EXPORT BY SR TO WR (610 MU)
EXPORT BY SR TO ER (311 MU)
INTER-REGIONAL EXCHANGES DETAILS INTER-REGIONAL EXCHANGES DETAILS UPTO 151 WKS (Till 20.11.05)UPTO 151 WKS (Till 20.11.05)
WRWR ERER
Net Energy Net Energy TransactionTransaction
57.5 MU 57.5 MU
IMPORT BY IMPORT BY SRSR
493.9MU493.9MU
IMPORT BY SRIMPORT BY SR
Amount Due toAmount Due to
SR ConstituentsSR ConstituentsRs. 79.7 Cr.Rs. 79.7 Cr. Rs. 24.5 Cr.*Rs. 24.5 Cr.*
Amount Amount Credited TO SR Credited TO SR
ConstituentsConstituents
Rs. 76.2 Cr.Rs. 76.2 Cr. Rs. 24.5 Cr.Rs. 24.5 Cr.
*from 06.09.04 (when ER exchanges computed @ respective frequencies)