40
1 Presentation on Rural Roads: Changing Scenario & Challenges Ahead By: N C Solanki Director (Projects-I) National Rural Roads Development Agency Ministry of Rural Development Government of India

Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

  • Upload
    others

  • View
    18

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

1

Presentation on

Rural Roads: Changing Scenario &

Challenges Ahead

By:

N C Solanki

Director (Projects-I)

National Rural Roads Development Agency

Ministry of Rural Development

Government of India

Page 2: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Status of Road Network in India

• Total length of road network in India : 33 Lakh km

• National Highways : 79,443 Km

(2%)

• State Highways &

Major District Roads : 5,99,662 Km

(18%)

• Rural Roads : 26,50,000 Km

(80%)

Rural Roads80%

National Highways2%

State Highwaysand Major District

Roads18%

Source: MoRTH , MoRD

2

Page 3: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

PMGSY- SALIENT FEATURES

• Launched on 25th December 2000 as a 100% Centrally

Sponsored Scheme.

• Aims to provide single all-weather road connectivity to eligible

unconnected rural habitations of having population upto 500 in

normal areas and 250 and above in hilly / desert / tribal and Left

Wings Extremism (LWE) affected / Integrated Action Plan (IAP)

Districts.

• Upgradation of Selected Road Works.

• Implementation through Planned Core Network.

• Project Implementation by the States/UTs

• NRRDA at National Level for technical support to MoRD.

• Implementation by the States- SRRDA at State level and PIUs at

district level.3

Page 4: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

PMGSY- SALIENT FEATURES – Cont..

• Maintenance budgeted by the States.

• Three tier Quality Monitoring Mechanism at District

level (PIU), State level (SQMs) and National Level

(NQMs).

• Inbuilt 5 year maintenance by the same contractor.

• On-Line Monitoring through Online Management,

Monitoring and Accounting System (OMMAS).

4

Page 5: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Management Strategy

• Appropriate Institutional Architecture

• Systematic Network Planning

• Structured Project Preparation and Selection Process

• Setting Standards and Specifications

• Standardization of Bidding Process – e procurement

• Rigorous Quality Monitoring

• Need Based Training, R & D

• Web based Monitoring Mechanism.

Management strategy aimed at embedding quality awareness in all

processes of implementation put in place for PMGSY.

5

Page 6: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Current Status

Physical Progress

6

Scheme Total Eligible

Projects Cleared

(%age in

brackets)

Achievement

( Upto June, 2014)

PMGSY

Habitations (in Nos.) 1,78,184 1,44,612

(81%)

99,696

69% of cleared

Length in km

(New Connectivity)- 3,59,609

2,55,779

71% of cleared

Length in km.

(Up-gradation)2,24,906

1,96,631

(87%)

1,53,373

78% of cleared

PMGSY-II

Upgradation length (Km) 50,00011,234.68

(22.5%)Recent sanctions

Page 7: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Financial Progress

7

(Since inception upto June 2014)

Projects cleared

( Rs. in Crore)

Funds released to the States

( Rs. in Crore)

Expenditure by States

( Rs. in Crore)

1,82,692 1,13,322 1,16,590

*Including interest accrued of Rs..3,341 Cr.

Page 8: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Issues and ChallengesIssues and ChallengesIssues and ChallengesIssues and Challenges

– Developing a transparent and acceptable methodology for selecting projects,

and finalizing assignments with public participation.

– Creating capacity in the engineering organization to be able to prepare need

based DPRs keeping in view traffic and site requirements.

– Developing external institutional support for planning, DPR scrutiny and

technical HR capacity building.

– Contractor development by improving quality of contracts, developing

contracting capacity.

– Creating a quality control system with responsibility of contractor and

accountability of PIU, with independent monitoring.

– Improving project management skills by ensuring institutional development,

creating monitoring tools and laying down clear SOPs and enforcing them.

– Involving local Government and CSOs during the planning, execution and

utilization phases and interaction with local development processes. 8

Page 9: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

• Creating maintenance consciousness, increasing dedicated funding for

maintenance and helping create maintenance management systems

and practices including community based maintenance.

• Creating processes to incentivise innovation and R&D in road

construction including use of local and marginal materials and

development of cost effective need based designs.

• Road Safety issues in design, execution and operation and linking road

safety features with local context.

9

Issues and Challenges Issues and Challenges Issues and Challenges Issues and Challenges –––– Cont..Cont..Cont..Cont..

Page 10: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

PMGSY-II - Features

• Union Cabinet approved PMGSY-II on 1st May, 2013.

• Aims at consolidation of rural road network, to leverage the

gains of PMGSY-I, through upgradation of ‘Through

Routes’ and ‘Major Link Routes’.

• Guidelines published and posted on the website.

• All States/ UTs are eligible to Participate in PMGSY- II once

they substantially award PMGSY works.

• DRRP is the basis of PMGSY – II and not Core Network.

• Centre- State Sharing pattern : 75:25 [ Special Areas- 90:10]

10

Page 11: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

PMGSY-II – Features – Cont..

• 12th Five Year Plan period target- 50,000 Km length

under PMGSY-II.

• State-wise allocation made based on the pro-rata basis

of length in PMGSY [20-25% of PMGSY Up-

gradationTargets].

• 6 States- Andhra Pradesh, Gujarat, Haryana, Karnataka

Maharashtra and Uttar Pradesh - sanctioned PMGSY II

roads. (11234.68 Km length sanctioned).

11

Page 12: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Changing ScenarioChanging ScenarioChanging ScenarioChanging ScenarioSocio Economic ImpactSocio Economic ImpactSocio Economic ImpactSocio Economic Impact

12

Page 13: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

New/ Improved Rural Roads

Better transport, improved access and saving in travel cost

and time

Exploitation of resource potential leading to higher

incomes

Emergence of demand for new activities and

services

Development of small business at villages and road

junctions

Growth in tertiary activities banking, schools, medical

facilities,

public services, service sector employment

13

Page 14: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Socio Economic Impacts

Agriculture…..Livelihoods.. .. Income...

14

Page 15: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Use of Improved Seeds Fertilizers and

Quantity of Production ( % Households)

15Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation, ( 3 years prior &after ): Publication

2011, CMI Social Research Centre , New Delhi , Ministry of Rural Development

Use of Improved Seedsand Fertilizers

Increase in quantity ofproduction

2.39

3.89

5.725.21

Vegetables and Fruits

Use of ImprovedSeeds and Fertilizers

Increase in quantityof production

9.42

11.8912.42

18.27

Cereals

Unconnected Habitations Connected Habitations

Page 16: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Cereals Pulses Vegetables, Fruitsetc.

64.47

8.07

27.47

42.74

11.6

45.66

Before PMGSY After PMGSY

Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation. ( 3 years prior &after ): Publication

2011, CMI Social Research Centre , New Delhi , Ministry of Rural Development

Change in Cropping Pattern

Cropped Area ( % Households)

16

Page 17: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Mini Bus

Four Wheeler

UnconnectedConnected

4.18

2.48

8.04

3.3

Access to Agriculture Market

In minutes/Km.

17Study 2007- 2011 , 10 States, 33 Districts, 750 Habitation , 11,490 Households Publication 2012,

LEA Associates SA, New Delhi , Ministry of Rural Development

Page 18: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation ( 3 years prior &after ): Publication

2011, CMI Social Research Centre , New Delhi , Ministry of Rural Development

% Households Acquired Assets Post PMGSY

18

Farm Machinery Cattles and Poultry Birds

23.73

30.57

38.45

49.42

Unconnected Habaitations Connected Habitations

Page 19: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Increase in days Employed ( % households)

19

Uttar Pradesh Jharkhand Rajasthan

40.34

30.4

36.8

52.5751.07

53.16

Unconnected Connected

Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation ( 3 years prior &after ): Publication

2011, CMI Social Research Centre , New Delhi , Ministry of Rural Development

Page 20: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

% Households Reported Increase in Realized Prices of Agriculture Products

Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation ( 3 years prior &after ):Publication 2011,

CMI Social Research Centre , New Delhi , Ministry of Rural Development

20

Cereals Vegetables, Fruits andOthers

9.49

34.59

13.59

46.64

Unconnected Habaitations Connected Habitations

Page 21: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

4466 4428

5176 5014

7006

5221

2007 2009 2010

Connected Habitations Unconnected Habitations

Status of Household Income (in Rs.)

Study 2007- 2011 , 10 States, 33 Districts, 750 Habitation , 11,490 Households Publication 2012,

LEA Associates SA, New Delhi , Ministry of Rural Development

21

(57%)

(18%)

Page 22: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Kerala

Socio Economic Impacts

Health Services

22

Page 23: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

HealthcareInstitutional Deliveries (Child Birth)

76%

24%

Before PMGSY

Home/ Conventional Institutional Delivery (Govt hospitals, PHC/CHC etc.)

57%

43%

After PMGSY

CMI Social

Research

Centre

LEA

Associates 33% 67%(2009)

51%

49%(2011)

23

Page 24: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Maternal Deaths and Infant Mortality

24

ADB Study- 2005-06 to 2007-08, Madhya Pradesh and Chhattisgarh, Connected road- length of

550 km and serves 82 habitations.

-12.26

-7.98

-18.29

-10.28

-20

-18

-16

-14

-12

-10

-8

-6

-4

-2

0

% Change in Maternal Deaths % Change in Mortaility Under 5 Yrs Age

Unconnected Connected

Page 25: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Socio Economic Impacts

Education

25

Page 26: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

% Females Enrolled in Schools

26Study 2007- 2010 , 17 States, 50 Districts, 748 Habitation ( 3 years prior &after ): Publication

2011, CMI Social Research Centre , New Delhi , Ministry of Rural Development

Page 27: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Road Ahead

� Focus on Capacity Building through

orientations/trainings of field engineers.

� Relaxations for faster implementation in IAP areas.

� Engaging CPSUs under Tripartite agreement to augment

execution capacity.

� A Rural Road Maintenance Policy in all States to ensure

long term sustainability of road assets.

� State Quality Monitor (SQM) and National Quality

Monitor (NQM) inspections enhanced with use of IT

intervention to ensure qualitative improvement.

� Focus on cost effective technologies and marginal

materials in the rural road construction.

� Cluster approach in sanctioning projects in difficult areas

in place of Comprehensive New Connectivity Priority List

(CNCPL). 27

Page 28: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Socio Economic Impacts

Other Impacts

28

Page 29: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Rural Access

before PMGSY and After

29

Page 30: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Rural Access

before PMGSY and After

30

Page 31: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Rural Access

before PMGSY and After

31

Page 32: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Machinery & Equipments in PMGSY

32

Page 33: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

INNOVATIONS

RCCP- Karnataka

Water conservation along CDs Gravel Roads

33

Page 34: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Hill Cutting in difficult terrainArunachal Pradesh

34

Page 35: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Earth Work in Plain Terrain

35

Page 36: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Field Quality Checks

36

Page 37: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Construction of Base Course

37

Page 38: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Bituminous Layer Construction

38

Page 39: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

Roads Built in Forest Areas

M P

39

Page 40: Rural Roads: Changing Scenario & Challenges Ahead · Rural Roads Better transport, improved access and saving in travel cost and time Exploitation of resource potential leading to

40