RSF for CG mobile home park

Embed Size (px)

Citation preview

Item Sand Black Beauty Sand

Pretreatment Varies Varies

Recirculation tank and pumping system $10,000 $9,000

Sand filter $10,000 $43,100

Engineering $3,000 $7,800

Contingencies $3,000 $7,800

Land Varies Varies

Total Capital Cost $26,000 $67,700

Labor $20/hr $20/hr

Power Varies Varies

Sludge disposal at 10 cents/gal 50/yr 50/yr

Table 1.0 shows the cost

estimates for a 5,000 GPD

facility using two different

media