Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
TE
NA
NT
S
PA
CE
2
03
1,4
00
R
SF
TE
NA
NT
S
PA
CE
2
01
1,4
75
R
SF
TE
NA
NT
S
PA
CE
1
01
4,2
00
R
SF
TE
NA
NT
S
PA
CE
1
02
2,4
00
R
SF
TE
NA
NT
S
PA
CE
1
03
4,9
02
R
SF
TE
NA
NT
S
PA
CE
2
02
1,4
00
R
SF
TE
NA
NT
S
PA
CE
2
04
1,4
00
R
SF
TE
NA
NT
S
PA
CE
2
05
1,5
57
R
SF
1'-6" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 1'-6"
143'-0"
1'-8" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 1'-8"
103'-4" 19'-2"
1'-0
"39
'-0"
39'-0
"1'
-6"
80'-6
"
1'-8
"33
'-4"
33'-4
"1'
-8"
70'-0
"
PROPOSED 1-STORY, 7,232 GSF RETAIL BUILDING PROPOSED 1-STORY, 11,500 GSF PROFESSIONAL OFFICE BUILDING
SCALE - PROPOSED FIRST FLOOR PLAN
3/32" = 1'-0"SHA1.0
NORTH
10'-8
"
EQUA
LEQ
UAL
EQUAL EQUAL
16'-0"
1'-0" 14'-0" 1'-0"
16'-0"
10'-0
"
6" REINFORCED
CONCRETE PAD, TYP.
CONTROL JOINT, TYPICAL
4X4 WEATHER TREATED
WOOD POST AT 8'-0"
O.C. MAX, TYPICAL
WEATHER TREATED
WOOD FENCE PANEL,
STAINED, TYPICAL
6" BOLLARD - SEE
ELEVATIONS, TYP.
WOOD FENCE PANEL ON
STEEL FRAME GATE -
SEE ELEVATIONS
SCALE - TRASH ENCLOSURE PLAN
1/4" = 1'-0"SHA1.0
6'-0
"
MA
XIM
UM
WEATHER TREATED WOOD
FENCE PANEL, STAINED
STEEL PLATE GATE HINGE, (3) PER
JAMB, BOLTED TO STEEL TUBES BY
GATE MFG., POWDER COATED, TYPICAL
FINISHED GRADE
STEEL FENCE POST PERIMETER FRAME
W/WEATHER TREATED WOOD FENCE PANEL,
STAINED, ATTACHED TO FACE, PROVIDE
VERTICAL SUPPORTS AS REQUIRED FOR
PANEL, POWDER COAT FRAME
SCALE -
TRASH ENCLOSUREFRONT ELEVATION
3/8" = 1'-0"SHA1.0
3'-6
"6
'-0
"
MA
XIM
UM
4X4 WEATHER TREATED
WOOD POST @ 8'-0" O.C., TYP.
6" SLAB ON GRADE W/6X6 W.W.F
@ MID SLAB OVER 4" FREE
DRAINING GRANULAR FILL
WEATHER TREATED WOOD
FENCE PANEL, STAINED, TYP.
EXISTING GRADE
SCALE -
TYPICAL TRASHENCLOSURE SECTION
3/8" = 1'-0"SHA1.0
5'-8
"
4"
1"
7'-0" 7'-0"
14'-0" MIN. CLEAR
PROVIDE STEEL TUBING INSIDE,
AT BOTTOM OF GATES FOR
CANE BOLTS, TYPICAL
3/4" CANE BOLTS
6" DIA. CONC. FILLED STEEL PIPE
BOLLARD W/ PLASTIC SLEEVE,
COLOR T.B.D. - 3'-6" HIGH, TYPICAL
PADLOCKABLE
SLIDE-BOLT
POURED IN PLACE CONC. FOOTING
1/2" FELT EXPANSION JOINT
MATERIAL W/SEALANT
4"
4X4 WEATHER TREATED
WOOD POST, BEYOND
POURED CONCRETE FOOTING
AT FENCE POSTS, TYPICAL
GALVANIZED POST BASE ANCHORED
TO CONCRETE FOOTING
SLOPE TOP OF CONCRETE
FOOTING, TYPICAL
3'-6
"6
'-0
"
MA
XIM
UM
4X4 WEATHER
TREATED WOOD
POST @ 8'-0" O.C., TYP.
WEATHER TREATED
WOOD FENCE PANEL,
STAINED, TYP.
EXISTING GRADE
POURED IN PLACE
CONC. FOOTING,
4"
GALVANIZED POST
BASE ANCHORED TO
CONCRETE FOOTINGSLOPE TOP OF CONCRETE
FOOTING, TYPICAL
SCALE -
TYPICAL FENCEPOST SECTION
3/8" = 1'-0"SHA1.0
WIL
SO
N R
OAD
RETAIL
AN
D P
RO
FES
SIO
NAL
OFFIC
E B
UIL
DIN
GS
WYO
MIN
G,
MIC
HIG
AN
SHEET TITLE
SH
EET N
UM
BER
SW JOB #
NAME & LOCATION
DATE ISSUED
DRAWN BY
ISSUES/DATES
Drawin
g:
S:\W
ork (G
roups)\S
paceW
erks\7
00
-retail
\P1
97
01
- w
ilson r
etail
\drawin
gs\S
HA1
.0.d
wg
Date:
Oct 1
5,
20
19
, 2
:12
pm
Layout:
SH
-1.0
- 2
4x3
6
Plotted b
y:
bsprit
e
DE
SIG
N C
ON
SU
LT
AN
T
2221 H
EA
LT
H D
RIV
E
616-248-3566
WY
OM
IN
G, M
IC
HIG
AN
49519
GR
AN
GE
R G
RO
UP
O
F C
OM
PA
NIE
S
2221 H
EA
LT
H D
RIV
E S
W - S
UIT
E 2200
WY
OM
IN
G, M
IC
HIG
AN
49519
P19701
PROPOSED FLOORPLANS, FENCE &TRASH ENCLOSURE
DETAILS
2019-10-17
BJS
A1
.0
FIRST FLOORELEV. = 100'-0"
ROOFELEV. = 116'-0"
T.O. PARAPETELEV. = 120'-0"
FIRST FLOORELEV. = 101'-2"
ROOFELEV. = 117'-2"
T.O. PARAPETELEV. = 121'-2"
FIRST FLOORELEV. = 104'-0"
ROOFELEV. = 120'-0"
T.O. PARAPETELEV. = 124'-0"
FIRST FLOORELEV. = 100'-0"
ROOFELEV. = 116'-0"
T.O. PARAPETELEV. = 120'-0"
SCALE - WEST ELEVATION
3/32" = 1'-0"SHA3.0
SCALE - SOUTH ELEVATION
3/32" = 1'-0"SHA3.0
SCALE - NORTH ELEVATION
3/32" = 1'-0"SHA3.0
SCALE - EAST ELEVATION
3/32" = 1'-0"SHA3.0
16'-0
"4'
-0"
16'-0
"4'
-0"
STONE VENEER
ALUMINUM STOREFRONT
SYSTEM, TYPICAL
PRE-FINISHED METAL COPING, TYP.
BOARD AND BATTEN
FIBER CEMENT SIDING
LIGHT FIXTURE, TYPICALSTONE VENEER BASE, TYP.FIBER CEMENT SHINGLE
SIDING AT TOP OF WINDOWS
OPEN SLAT METAL CANOPY SYSTEM, TYP.
FIBER CEMENT SHINGLE SIDING
HORIZONTAL FIBER
CEMENT LAP SIDING
STONE VENEER BASE, TYP.
FIBER CEMENT TRIM, TYP.
FABRIC AWNINGS, TYP.
FIBER CEMENT BOARD
AND BATTEN SIDING
OPEN SLAT METAL
CANOPY SYSTEM
HORIZONTAL FIBER
CEMENT LAP SIDING
FIRST FLOORELEV. = 100'-0"
ROOFELEV. = 116'-0"
T.O. PARAPETELEV. = 120'-0"
16'-0
"4'
-0"
LIGHT FIXTURE, TYPICALSTONE VENEER BASE
FIBER CEMENT BOARD
AND BATTEN SIDING
FIBER CEMENT SHINGLE
SIDING AT TOP OF WINDOW
OPEN SLAT METAL CANOPY
SYSTEM, TYP.
ALUMINUM STOREFRONT
SYSTEM, TYPICAL
STONE VENEER
FIBER CEMENT BOARD
AND BATTEN SIDING
ALUMINUM STOREFRONT
SYSTEM, TYPICAL
PARTIAL HEIGHT WALL
WITH STONE VENEER
PRE-FINISHED METAL COPING, TYP.
FIBER CEMENT TRIM, TYPICAL
FIBER CEMENT SHINGLE SIDING
OPEN SLAT METAL CANOPY
SYSTEM AND SUPPORTS
LIGHT FIXTURE, TYP.
HORIZONTAL FIBER
CEMENT LAP SIDING, TYP.
16'-0
"4'
-0"
16'-0
"4'
-0"
FIRST FLOORELEV. = 101'-2"
ROOFELEV. = 117'-2"
T.O. PARAPETELEV. = 121'-2"
HORIZONTAL FIBER
CEMENT LAP SIDING, TYP.
FIBER CEMENT TRIM, TYP.
PRE-FINISHED METAL
COPING, TYPICAL
PRE-FINISHED METAL
GUTTERS AND
DOWNSPOUTS, TYPICAL
PRE-FINISHED METAL
GUTTER AND
DOWNSPOUTS, TYPICAL
SCALE - PROPOSED MATERIALS
N.T.S.SHA3.0
SCALE - PROPOSED TRASH ENCLOSURE
N.T.S.SHA3.0
6' HIGH WOOD FENCE TRASH ENCLOSURE 6' HIGH WOOD FENCE TRASH ENCLOSURE STONE VENEER FIBER CEMENT LAP SIDING FIBER CEMENT BOARD
AND BATTEN SIDING
FIBER CEMENT SHINGLE SIDING WOOD FENCE SCREEN WOOD FENCE SCREEN
WIL
SO
N R
OAD
RETAIL
AN
D P
RO
FES
SIO
NAL
OFFIC
E B
UIL
DIN
GS
WYO
MIN
G,
MIC
HIG
AN
SHEET TITLE
SH
EET N
UM
BER
SW JOB #
NAME & LOCATION
DATE ISSUED
DRAWN BY
ISSUES/DATES
Drawin
g:
S:\W
ork (G
roups)\S
paceW
erks\7
00
-retail
\P1
97
01
- w
ilson r
etail
\drawin
gs\S
HA3
.0.d
wg
Date:
Oct 1
5,
20
19
, 2
:08
pm
Layout:
SH
-3.0
- 2
4x3
6
Plotted b
y:
bsprit
e
DE
SIG
N C
ON
SU
LT
AN
T
2221 H
EA
LT
H D
RIV
E
616-248-3566
WY
OM
IN
G, M
IC
HIG
AN
49519
GR
AN
GE
R G
RO
UP
O
F C
OM
PA
NIE
S
2221 H
EA
LT
H D
RIV
E S
W - S
UIT
E 2200
WY
OM
IN
G, M
IC
HIG
AN
49519
P19701
PROPOSEDEXTERIOR
ELEVATIONS
2019-10-17
BJS
A3
.0