    RPS HYDRO ELECTRIC POWER

    PLANT

  • 8/11/2019 RPS power Plant

    4/14

    THE RPS DAM ( HEPS) IS PART OF CHAMBAL PROJECT .

    THIS PLANT WAS OFFICIALLY DECLARED OPEN ON 9FEBRUARY 1970 BY INDRA GANDHI.

    THIS DAM IS USED FOR BOTH IRRIGATION ANDGENERATION OF ELECTRICITY. THE TOTAL DAM LENGTHIS ABOUT 1 KM AND 25 FEET WIDE.

    RPS HYDRO POWER PLANT CONSIST OF FOUR UNITSOF EACH 43 MW.

    THE GENERATED VOLTAGE IS 11 KV ANDTRANSMISSION VOLTAGE IS 132 KV .

  • 8/11/2019 RPS power Plant

    5/14

    GENERAL DESCRIPTION OF RPS HEPS

    AT RPS HEPS 4 UNITS OF FRANCIS TURBINE AREINSTALLED & EACH TURBINE ROTATE AT 125 RPM.

    GENERATOR IS DIRECTLY COUPLED WITH TURBINE,GIVING OUTPUT OF 43MW AT 11KV & 50HZFREQUENCY.

    THE OUTPUT VOLTAGE IS STEP UP TO 132KV BYTRANSFORMER.

    THE PLANT OPERATED AND CONTROLLED FROMCENTRALIZED ROOM WHICH IS HAVING ALL THEINFORMATION RAGARDING DIFFERENT SYSTEMS OFPLANT.

  • 8/11/2019 RPS power Plant

    6/14

    PARTICULARS R.P.S UNITS

    1. CATCHMENT AREA2. SUBMERGED AREA3. FULL RESERVOIR LEVEL4. MX. WATER LEVEL5. MIN. DRAWM DOWN LEVEL6. NO. & SIZE OF CREST

    GATES7. NO. & SIZE OF SULICE

    GATES8. INSTALLED CAPACITY9. NO. OF PENSTOCK& DIA.10. MAX. HEAD

    11. MIN. HEAD

    1. 96200 MILESQUARE

    2. 76.55 MILESQUARE

    3. 1157.50 FEET4. 1162.00 FEET5. 1125.00 FEET

    6. 17,60*28 FEET SQUARE

    7. 4, 9*11 FEETSQUARE

    8. 4*43 MW9. 4*20 FEET10. 189 FEET11. 152 FEET

  • 8/11/2019 RPS power Plant

    7/14

    STORAGE RESERVOIR

    DAM

    PENSTOCK

    TAIL RACE

    DRAFT TUBE

    HYDRAULIC TURBINE

    GENERATOR

  • 8/11/2019 RPS power Plant

    8/14

  • 8/11/2019 RPS power Plant

    9/14

    HYDRAULIC TURBINE

    THE RPS HEPS IS LOW HEAD POWER PLANT SO FRANCIS TURBINEIS USED.

    IT IS A REACTION TURBINE.

    THIS TURBINE DEVELOPS POWER PARTIALY DUE TO VELOCITYOF WATER & PARTIALY DUE TO DIFF. IN PRESSURE.

    IT CONSIST GUIDE APPARATUS WITH AN OUTER RING OF

    STATIONRY BLADES & INNER RINGS CONSISTING OF ROTATINGBLADES FORMING A RUNNER .

    THE EFFICIENCY OF TURBINE VARIES IN 80% TO 85%.

  • 8/11/2019 RPS power Plant

    10/14

    SPECIFICATION OF FRANCIS TURBINE

    KW - 52000

    NET HEAD - 49.7 M

    NO. OF BLADES - 16

    RPM - 125

  • 8/11/2019 RPS power Plant

    11/14

    SPECIFICATION OF GENERATOR

    MODEL

    TYPE

    KW

    SPEED

    VOLTS ON LOAD

    AMP

    WOUND

    POLES

    101213

    EVF-8

    250125 RPM

    250

    1000

    SHUNT

    8

  • 8/11/2019 RPS power Plant

    12/14

    FUNCTION OF RPS HEPS

    THIS PLANT SERVES ELECTRICITY TO KOTA , BHILWARA

    AND GANDHI SAGAR.

    WHEN THE GRID FAILS THIS POWER STATION PROVIDE S

    START UP POWER FOR RESTORING THE NORTHEN GRID.

    IT PROVIDES STABILITY TO MACHINES OF RAWATBHATA

    ATOMIC POWER PLANT CONTRIBUTING TO THE STABILITY

    OF THE GRID.