8
ROTARY TANK REJUVENATION & REPAIR

ROTARY TANK REJUVENATION & REPAIR

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

ROTARY TANK REJUVENATION & REPAIR

1. Extending tank lifecycle

2. Reducing the need for unexpectedCAPEX maintenance

3. Adapting to business requirements(for example – product change,capacity increase etc.)

BENEFITS OF TRR

With close to 50 years of experience in the Oil & Gas industry, Rotary has grown to become one of the leading tankage contractors in South East Asia and the Middle East.

ROTARY TANK REJUVENATION & REPAIR (TRR)

Our in-depth expertise is a result of the millions of hours spent on the field, and accumulation of first-hand experience through decades of sheer hard work from all our workers.

Our best-in-class in-house engineeringlays the cornerstone to our understanding of the projects. Supported by our multi-discipline workforce encompassing mechanical, civil and electrical & instrumentation teams, we offer clients “one-stop” tank maintenance solutions with one of the highest safety and quality standards around.

Smart Thinking. Safe Hands.

Our Service Offerings

Integrated Tank Maintenance

Tank Rehabilitation

CAPEX Upgradation

• Inspection• Tank cleaning• Blasting & painting• Insulation• Discovery work such

as shell patching, bottom patching

• CS cone / dome Roof replacement

• Aluminum floating roof installation

• Fire water line / foam line replacement

• Bottom, shell and roof patching

• Tank painting• Valve servicing

• Tank upgrade due to change of product

• Annular & bottom plate replacement

• EFR and IFR replacement, pontoon repair & air test

• Shell course replacement

• Turnkey product change/business operations upgradation

Cable connection

Soil improvem

ent

Removal and install

of new roof plates

Existing shell

courses demolition

ADR installation

Full bottom plate laying

Key work activities

Our Advantages

ONE-STOP SOLUTION FOR YOUR TANK MAINTENANCE NEEDS

As a multi-discipline EPC company, we have 6,000 employees across all diverse disciplines (tankage, E&I, civil, mechanical) worldwide. Coupled with our 200-men strong in-house engineering team, we offer the full suite of tank maintenance solutions!

In-house EngineeringOur 200-men strong team spread across various disciplines that support all design-related works for tank maintenance projects

Global WorkforceGlobal workforce of 6,000 employees spread across Asia and the Middle East ready for deployment to your projects

Ready-Stock PlatesAvailable ready-stock plates sitting in our warehouses to cater to your time-sensitive projects, reducing tank downtime

Global WorkshopsExisting workshops in Singapore, Thailand, Indonesia, UAE, Saudi to provide any supporting fabrication works

Highest Safety & Quality StandardsSafety is our top priority. Our insistence on the most stringent level of safety processes at every stage of each project.

Phenomenal Track RecordOur best-in-class execution has earned us repeated contracts from IOCs and NOCs worldwide.

AGW EGW Auto Welding Machine

Train Track Roller Bottom Plate

Moveable FrameLong Buggy 9-12 m

Our Strengths

SAW(LT-7) Bottom and Corner Joint Welding

ADR lifting by Grip hoistNew shell plate installation (Shell + WG + Top Angle)

Jack Up

Launching Table For Bottom Plate

Temporary Wind Girder Working Platform

Finite Element Analysis (FEA)

Construction Jack Plasma Cutter

Integrated Tank Maintenance

Tank Rehabilitation

CAPEX Upgradation

Tank Maintenance Case Study

Tank Maintenance AT VOPAK Singapore

Scope

• Total of 34 tanks contracted over a 4-year period• Tank jacking of 2 metres• Tank foundation upgrading : Adding of 50mm river sand,

2mm HDPE sheet laying and final 50mm oily sand laying• Entire tank bottom and annular plate replacement with

hydro-test• Entire foam and drencher line replacement from the bud

wall manifold to tank top (Including header, riser, ring pipes etc.)

Timeline: 2017 to 2020

Client Location Scope Year

Arab Tank Terminal Company Yanbu, Saudi Arabia TK 303 Tank Maintenance 2020

Chevron Singapore Pte Ltd Penjuru, Singapore T535 Cleaning and Roof Replacement 2019

Changi Airport Fuel Hydrant Installation Pte Ltd

Changi Airport, Singapore

Reinstatement of T-11 2019

Thai Tank Terminal Rayong, Thailand Repair Bottom Plate of T-3802 2019

Thai Oil Public Company Limited Chonburi, Thailand Demolition of Tank (T-116) Work 2019

Thai Tank Terminal Rayong, Thailand Repair on Tank shell and roof plate 2018

Thai Oil Public Company Limited Chonburi, Thailand Demolition existing form line, stairway , etc. 2018

Shell Eastern Petroleum Limited Bukom, Singapore T145/ 155 Tank Refurbishment 2019

EPPCO International Dubai, UAE Tk-08, 09 and 113 Repair & Maintenance 2019

Arab Tank Terminal Company Yanbu, Saudi Arabia Tank Bottom Plate Replacement Project 2019

PTT Phenol Rayong, Thailand Roof Demolition work & replace new nozzle 2019

Tankstore Pulau Busing, Singapore

T454 Reconstruction Work 2018

Shell Eastern Petroleum Limited Pulau Bukom, Singapore

T133 Modification EPC Work 2018

Chevron Singapore Pte Ltd Jln Buroh, Singapore

Tank Cleaning & Repairing Works For T-550 2017

Client Location Scope Year

Vopak Terminals Singapore Pte Ltd Pulau Sebarok, Singapore

Ad-Hoc Tankage Maintenance 2017

Tankstore Pulau Busing, Singapore

Ad-Hoc Tankage Maintenance 2017

ExxonMobil Asia Pacific Pte Ltd Jurong Island, Singapore

Ad-Hoc Mechanical Maintenance 2017

BP Singapore Pte Ltd Jalan Tepong, Singapore

Ad-Hoc Mechanical Maintenance 2016

Our Selected Track Record

Client Location Scope Year

Shell Eastern Petroleum (Pte) Ltd

Jurong Island, Singapore

Integrated Tank Maintenance @ MEG/ EGS

Start: 2017Currently ongoing

Shell Chemical Seraya Pte Ltd Jurong Island, Singapore

Integrated Tank Maintenance @ Seraya Start: 2017Currently ongoing

Oiltanking Singapore Chemical Storage Pte Ltd

Jurong Island, Singapore

T8303 Bullet Tank Shutdown 2019

Oiltanking Singapore Chemical Storage Pte Ltd

Jurong Island, SIngapore

T8302 Bullet Tank Shutdown 2018

CAPEX WORKS

ADHOC MAINTENANCE

PLANT AND INTEGRATED MAINTENANCE

Total of

1.5 Million Barrels of Storage Capacity

Maintained To-Date

CHINA

INDIA

BANGLADESH MYANMAR

THAILANDVIETNAM

MALAYSIASINGAPORE

INDONESIA

SAUDI ARABIA

UAE

OMAN

DJIBOUTI

ALGERIA

Rotary Global Presence

Contact Details

General InquiriesEmail : [email protected] : +65 6866 0800

Tank Maintenance: Singapore, Malaysia, Indonesia• Rotary IMC Pte. Ltd.

Tank Maintenance: Thailand, Vietnam• Thai Rotary Engineering Public Company Limited

Tank Maintenance: Saudi, UAE, Oman and other ME countries• Rotary Engineering Fujairah FZE• Rotary Arabia Co. Ltd.

QATAR