5
MISSOURI LOTTERY HEADQUARTERS OWNER: STATE OF MISSOURI MICHAEL L. PARSON, GOVERNOR PROJECT MANAGEMENT: OFFICE OF ADMINISTRATION DIVISION OF FACILITIES MANAGEMENT, DESIGN AND CONSTRUCTION PROJECT NUMBER: N200701 ASSET NUMBER: LOTTERY HEADQUARTERS BUILDING: 8611951001 JEFFERSON CITY, MISSOURI ROOF REPLACEMENTS SHEET NUMBER: G-101 1 OF 5 SHEETS FEBRUARY 27, 2020 DEPARTMENT OF REVENUE, STATE LOTTERY COMMISSION AND DISTRIBUTION CENTER DISTRIBUTION CENTER: 8611951002 HEADQUARTERS DISTRIBUTION CENTER SHEET NO. SHEET NAME DESCRIPTION 1 G-101 COVER SHEET 2 3 4 5 A-102 A-103 ROOF PLAN - DISTRIBUTION CENTER A-501 ROOF DETAILS A-101 ROOF PLAN - HEADQUARTERS ROOF PLAN - HEADQUARTERS

ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

MISSOURI LOTTERY HEADQUARTERS

OWNER: STATE OF MISSOURIMICHAEL L. PARSON, GOVERNOR

PROJECTMANAGEMENT:

OFFICE OF ADMINISTRATIONDIVISION OF FACILITIES MANAGEMENT,DESIGN AND CONSTRUCTION

PROJECT NUMBER: N200701

ASSET NUMBER:LOTTERY HEADQUARTERS BUILDING: 8611951001

JEFFERSON CITY, MISSOURI

ROOF REPLACEMENTS

SHEET NUMBER:

G-101 1 OF 5 SHEETSFEBRUARY 27, 2020

DEPARTMENT OF REVENUE,STATE LOTTERY COMMISSION

AND DISTRIBUTION CENTER

DISTRIBUTION CENTER: 8611951002

HEADQUARTERS

DISTRIBUTION

CENTER

SHEET NO. SHEET NAME DESCRIPTION

1 G-101 COVER SHEET

2

3

4

5

A-102

A-103 ROOF PLAN - DISTRIBUTION CENTER

A-501 ROOF DETAILS

A-101 ROOF PLAN - HEADQUARTERS

ROOF PLAN - HEADQUARTERS

Page 2: ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

E

E

E

E

151'-4"

22'-4"

151'-4"

V

43'-8"10'-8"21'-8"10'-8"64'-8"

69'-10"

21'-8"

69'-10"

161'-4"

11.5"

1.5"

11.5"

11.5"

6.5"

1.5" 1.5" 1.5"

6.5"

1.5" 1.5" 1.5"

5.5"5.5"

6.5"

3.5"

.5:12 .5:12

.2

5:1

2

.5:12

.2

5:1

2

.5:12

.5:12

.2

5:1

2

.5:12

.5:12

.5

:1

2

.5:12

.2

5:1

2

.2

5:1

2

.2

5:1

2

.25:12

.5:12

.5:12

.2

5:1

2

.5:12

.2

5:1

2

.5:12

.2

5:1

2

.5:12

.2

5:1

2

.5:12

.2

5:1

2

.2

5:1

2

.2

5:1

2

.2

5:1

2

9.5"

RTU - 4 RTU - 3

RTU - 2

RTU - 1

RTU - 5

RIDGE

2

10

65

7

8

13 13 13

6

5

4

11

10

10

2

1

9

1715

6 6

10 10

10

11

13 13 13 13

23

10

1715

15

14

14

6

15

6

6

3

17

65

24

6

15

6

56

22

2

3

3

A-501

16

15

16

16

6

12.5"

6

17

17

6

7

65

65

3

A-501

1

A-501

2

A-501

25 25

25

25

25

25

25

25

25

.25:12 FINISH SLOPE

BUILDING HAS .125:12 MECH SLOPE

.25:12 FINISH SLOPE

BUILDING HAS .125:12 MECH SLOPE

.5:12

.5:12

3/32" = 1'-0"

ROOF PLAN

1

####-#####-2020-0227-####

ISSUE DATE:

SHEET NUMBER:

CHECKED BY:DRAWN BY:

DESIGNED BY:

DATE:REVISION:

SHEET TITLE:

REVISION:DATE:

REVISION:DATE:

CAD DWG FILE:

STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR

OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT / DESIGNAND CONSTRUCTION

A-101

DEPARTMENT OF REVENUESTATE LOTTERY COMMISSION

ROOF REPLACEMENTS

MISSOURI LOTTERYHEADQUARTERS ANDDISTRIBUTION CENTER

1823 SOUTHRIDGE DRIVEJEFFERSON CITY, MISSOURI

PROJECT # N200701ASSET #LOTTERY HEADQUARTERS8611951001DISTRIBUTION CENTER8611951002

2/27/2020

N200701A-RF-A101Rkelled

blockl

ROOF PLAN - HEADQUARTERS

MA

TC

H LIN

E

SE

E D

RA

WIN

G A

-102

NOT TO SCALE

KEY PLAN

NORTH

SHEET 2 OF 5

KEYED NOTES1 REMOVE EXISTING FULLY ADHERED TPO ROOF SYSTEM DOWN TO THE

EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

2 REMOVE EXISTNG FULLY ADHERED EPDM ROOF SYSTEM DOWN TO THE EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

3 MOVEMENT AND REINSTALLATION OF EXISTING CONDENSING UNIT (SERVING TEMPERATURE SENSITIVE EQUIPMENT) SHALL BE COORDINATEDWITH OWNER. RE-USE EXISTING SUPPORT PADS FOR THIS UNIT.

4 EXISTING SATELLITE DISH TO REMAIN. COORDINATE RELOCATION DURINGCONSTRUCTION WITH OWNER.

5 EXISTING CONDENSING UNIT, INCLUDING EQUIPMENT PADS, TO REMAIN.6 REPLACE EXISTING ROOF PENETRATION CURB WITH NEW URETHANE CURB

SYSTEM.7 EXISTING SATELLITE TO REMAIN. OPERATION TO BE MAINTAINED

THROUGHOUT CONSTRUCTION.8 EXISTING METAL FLASHING OVER SATELLITE FRAME/PARAPET WALL

CONNECTION TO BE REMOVED. INSTALL NEW PREFINISHED METAL FLASHING TO MATCH EXISTING.

9 EXISTING METAL PARAPET CAP TO BE REMOVED. COMPLETELY COVER PARAPET WITH FULLY ADHERED MEMBRANE WITH NO METAL CAP.

10 EXISTING METAL PARAPET CAP TO BE REMOVED. INSTALL NEW PRE-FINISHED METAL FASCIA COVER (DRIP EDGE) OVER NEW MEMBRANE PER DETAIL 3/A-501.

11 EXISTING VIDEO SECURITY SYSTEM TO REMAIN DURING CONSTRUCTION. COORDINATE TEMPORARY REMOVAL AND REINSTALLATION WITH OWNERPRIOR TO CONSTRUCTION.

12 EXISTING SATELLITE TO REMAIN IN OPERATION DURING CONSTRUCTION.13 EXISTING ROOF SCUPPER AND CONDUCTOR HEAD/DOWNSPSOUT TO

REMAIN. PROVIDE NEW FLASHING PER MANUFACTURER.14 EXISTING ROOF TRANSITION “STEP”: INSPECT SUBSTRATE FOR DAMAGE

AND REPAIR AS NECESSARY. INSTALL NEW MEMBRANE ROOFING SYSTEM.15 EXISTING ROOFTOP UNIT: FLASH PER MANUFACTURER'S

RECOMMENDATION.16 EXISTING ROOF VENT: FLASH PER MANUFACTURER'S RECOMMENDATION.17 INSTALL 30” WIDE WALKWAY PADS WHERE SHOWN ON ROOF PLAN.18 EXISTING ROOF HATCH SHALL REMAIN. INSTALL NEW PERIMETER SAFETY

RAILING SYSTEM AROUND ROOF HATCH. SEE DETAIL 5/A-501.19 COORDINATE TEMPORARY REMOVAL AND REINSTALLATION OF FLEXIBLE

CONDUIT FOR WALL MOUNTED SECURITY CAMERA, IF REQUIRED20 REMOVE AND DISPOSE OF EXISTING CONDENSING UNIT. SALVAGE

EXISTING EQUIPMENT PAD AND RELOCATE TO EXISTING CONDENSING UNITAS NOTED.

21 INSTALL RELOCATED EQUIPMENT PAD FOR EXISTING CONDENSING UNIT.22 REMOVE EXISTING I-BEAMS AND REINSTALL EXISTING SATELLITES ON

EXISTING EQUIPMENT PADS.23 RELOCATE EXISTING JUNCTION BOX BELOW ROOF.24 REMOVE EXISTING CURB.25 INSTALL ½” PER 1' INSULATION CRICKET.

GENERAL NOTES26 DIMENSIONS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR SHALL

FIELD VERIFY ALL DIMENSIONS.27 CONTRACTOR SHALL FLASH AROUND ALL ROOF PENETRATIONS AND CURBS

PER MANUFACTURERS RECOMMENDATIONS, WHETHER SPECIFICALLY SHOWN OR NOT.

28 THE ENTIRE ROOF SYSTEM SHALL BE FULLY ADHERED. NO FASTENERS MAYPENETRATE THE EXISTING METAL DECKING DUE TO ELECTRICAL EQUIPMENT/CONDUIT LOCATED AGAINST THE UNDERSIDE OF THE DECK.

Page 3: ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

RTU

E

E

E

E

E

E

V

267'-4"

56'-0"

26'-0 1/4"

22'-4" 20'-0" 171'-4" 15'-8"

38'-0"

267'-4"

161'-4 1/2"

V

V

V

V

V

V

11.5"

11.5"

.5:12

.5:12

V

V

1

9

5

6

22

79'-4 1/4"

1

10

15

15

15

13 13 13

13 13 13 13TYP.

2

2.5"

3

A-501

3

A-501

3

A-501

3

A-501

3

A-501

1

A-501

4

A-501

Typ

16

16

15

15

16

16 16

6

20

10

15

16

16

VENT

TYP.

E

SLOPE19

15

15

17 TYP.

17 TYP.

15

.25:12 FINISH SLOPE

BUILDING HAS .125:12 MECH SLOPE

.25:12 FINISH SLOPE

BUILDING HAS .125:12 MECH SLOPE

10

18

6

3

12.5"

EXISTING

HYDRANT

12.5"

15

16

10

10

2.5"

621

RTU

65

2

A-501

25

25

25

.5:12 .5:12.5:12 .5:12.5:12 .5:12

25 25

25

25

25

25

25

2525

25

.5:12 .5:12 .5:12 .5:12.5:12 .5:12.5:12 .5:12

25

2525 2525

3/32" = 1'-0"

ROOF PLAN

1

####-#####-2020-0227-####

ISSUE DATE:

SHEET NUMBER:

CHECKED BY:DRAWN BY:

DESIGNED BY:

DATE:REVISION:

SHEET TITLE:

REVISION:DATE:

REVISION:DATE:

CAD DWG FILE:

STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR

OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT / DESIGNAND CONSTRUCTION

A-102

DEPARTMENT OF REVENUESTATE LOTTERY COMMISSION

ROOF REPLACEMENTS

MISSOURI LOTTERYHEADQUARTERS ANDDISTRIBUTION CENTER

1823 SOUTHRIDGE DRIVEJEFFERSON CITY, MISSOURI

PROJECT # N200701ASSET #LOTTERY HEADQUARTERS8611951001DISTRIBUTION CENTER8611951002

2/27/2020

N200701A-RF-A101Rkelled

blockl

ROOF PLAN - HEADQUARTERS

MA

TC

H LIN

E

SE

E D

RA

WIN

G A

-101

NOT TO SCALE

KEY PLAN

NORTH

SHEET 3 OF 5

KEYED NOTES1 REMOVE EXISTING FULLY ADHERED TPO ROOF SYSTEM DOWN TO THE

EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

2 REMOVE EXISTNG FULLY ADHERED EPDM ROOF SYSTEM DOWN TO THE EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

3 MOVEMENT AND REINSTALLATION OF EXISTING CONDENSING UNIT (SERVING TEMPERATURE SENSITIVE EQUIPMENT) SHALL BE COORDINATEDWITH OWNER. RE-USE EXISTING SUPPORT PADS FOR THIS UNIT.

4 EXISTING SATELLITE DISH TO REMAIN. COORDINATE RELOCATION DURINGCONSTRUCTION WITH OWNER.

5 EXISTING CONDENSING UNIT, INCLUDING EQUIPMENT PADS, TO REMAIN.6 REPLACE EXISTING ROOF PENETRATION CURB WITH NEW URETHANE CURB

SYSTEM.7 EXISTING SATELLITE TO REMAIN. OPERATION TO BE MAINTAINED

THROUGHOUT CONSTRUCTION.8 EXISTING METAL FLASHING OVER SATELLITE FRAME/PARAPET WALL

CONNECTION TO BE REMOVED. INSTALL NEW PREFINISHED METAL FLASHING TO MATCH EXISTING.

9 EXISTING METAL PARAPET CAP TO BE REMOVED. COMPLETELY COVER PARAPET WITH FULLY ADHERED MEMBRANE WITH NO METAL CAP.

10 EXISTING METAL PARAPET CAP TO BE REMOVED. INSTALL NEW PRE-FINISHED METAL FASCIA COVER (DRIP EDGE) OVER NEW MEMBRANE PER DETAIL 3/A-501.

11 EXISTING VIDEO SECURITY SYSTEM TO REMAIN DURING CONSTRUCTION. COORDINATE TEMPORARY REMOVAL AND REINSTALLATION WITH OWNERPRIOR TO CONSTRUCTION.

12 EXISTING SATELLITE TO REMAIN IN OPERATION DURING CONSTRUCTION.13 EXISTING ROOF SCUPPER AND CONDUCTOR HEAD/DOWNSPSOUT TO

REMAIN. PROVIDE NEW FLASHING PER MANUFACTURER.14 EXISTING ROOF TRANSITION “STEP”: INSPECT SUBSTRATE FOR DAMAGE

AND REPAIR AS NECESSARY. INSTALL NEW MEMBRANE ROOFING SYSTEM.15 EXISTING ROOFTOP UNIT: FLASH PER MANUFACTURER'S

RECOMMENDATION.16 EXISTING ROOF VENT: FLASH PER MANUFACTURER'S RECOMMENDATION.17 INSTALL 30” WIDE WALKWAY PADS WHERE SHOWN ON ROOF PLAN.18 EXISTING ROOF HATCH SHALL REMAIN. INSTALL NEW PERIMETER SAFETY

RAILING SYSTEM AROUND ROOF HATCH. SEE DETAIL 5/A-501.19 COORDINATE TEMPORARY REMOVAL AND REINSTALLATION OF FLEXIBLE

CONDUIT FOR WALL MOUNTED SECURITY CAMERA, IF REQUIRED20 REMOVE AND DISPOSE OF EXISTING CONDENSING UNIT. SALVAGE

EXISTING EQUIPMENT PAD AND RELOCATE TO EXISTING CONDENSING UNITAS NOTED.

21 INSTALL RELOCATED EQUIPMENT PAD FOR EXISTING CONDENSING UNIT.22 REMOVE EXISTING I-BEAMS AND REINSTALL EXISTING SATELLITES ON

EXISTING EQUIPMENT PADS.23 RELOCATE EXISTING JUNCTION BOX BELOW ROOF.24 REMOVE EXISTING CURB.25 INSTALL ½” PER 1' INSULATION CRICKET.

GENERAL NOTES26 DIMENSIONS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR SHALL

FIELD VERIFY ALL DIMENSIONS.27 CONTRACTOR SHALL FLASH AROUND ALL ROOF PENETRATIONS AND CURBS

PER MANUFACTURERS RECOMMENDATIONS, WHETHER SPECIFICALLY SHOWN OR NOT.

28 THE ENTIRE ROOF SYSTEM SHALL BE FULLY ADHERED. NO FASTENERS MAYPENETRATE THE EXISTING METAL DECKING DUE TO ELECTRICAL EQUIPMENT/CONDUIT LOCATED AGAINST THE UNDERSIDE OF THE DECK.

Page 4: ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

152'-0"

50'-2 3/4"

75'-6"

84'-8" 35'-4" 32'-0"

8'-0"

117'-8 3/4"

3

A-501

Sim

3

A-501

Sim

3

A-501

3

A-501

Sim

RTU

RTURTU

RTU

RTU

3

A-501

Sim

125'-8 3/4"

DUSK TO DAWN

SENSOR

ACCESS LADDER

V

V

EX

IS

T. 1/4" : 12"

DS DS DS DS

4

A-501

Sim

A-103

2

A-103

3

10

10

10

10EXISTING

13 13 13 13

10 17

161

156

156

156

156

156

.5:12 .5:12 .5:12 .5:12 .5:12 .5:12

.5:12.5:12

25 2525 25

25

25 25

25

25NEW FULLY ADHERED TPO

OVER ADHERED COVER BOARD

OVER ADHERED 5" RIGID INSULATION

OVER EXISTING METAL DECK.

5" M

IN

. R

IG

ID

IN

SU

LA

TIO

N

50'-0"

7'-5 11/16"

EXISTING ROOF DRAIN

3

A-501

Sim

3

A-501

Sim

.125":12"

.

.1

25

":1

2"

2

A-501

Sim

NO EXISTING SLOPE, TYP.

1

10

FULLY ADHERED TPO MEMBRANE

OVER 1/2" COVER BOARD

OVER .125":12" TAPERED RIGID

INSULATION OVER EXISTING

METAL DECK.

ROOF DRAIN

31'-6"

3

A-501

Sim

3

A-501

Sim

.125" : 12"

2

A-501

Sim

EXISTING

1

10

1/8" = 1'-0"

ENTRY CANOPY - DISTRIBUTION CENTER

2

####-#####-2020-0227-####

ISSUE DATE:

SHEET NUMBER:

CHECKED BY:DRAWN BY:

DESIGNED BY:

DATE:REVISION:

SHEET TITLE:

REVISION:DATE:

REVISION:DATE:

CAD DWG FILE:

STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR

OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT / DESIGNAND CONSTRUCTION

A-103

DEPARTMENT OF REVENUESTATE LOTTERY COMMISSION

ROOF REPLACEMENTS

MISSOURI LOTTERYHEADQUARTERS ANDDISTRIBUTION CENTER

1823 SOUTHRIDGE DRIVEJEFFERSON CITY, MISSOURI

PROJECT # N200701ASSET #LOTTERY HEADQUARTERS8611951001DISTRIBUTION CENTER8611951002

2/27/2020

N200701A-RF-A101Rkelled

blockl

ROOF PLAN - DISTRIBUTION CENTER

NOT TO SCALE

KEY PLAN

3/32" = 1'-0"

ROOF PLAN - DISTRIBUTION CENTER

1

1/8" = 1'-0"

DOCK CANOPY - DISTRIBUTION CENTER

3

NORTH

SHEET 4 OF 5

KEYED NOTES1 REMOVE EXISTING FULLY ADHERED TPO ROOF SYSTEM DOWN TO THE

EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

2 REMOVE EXISTNG FULLY ADHERED EPDM ROOF SYSTEM DOWN TO THE EXISTING METAL DECK. INSTALL NEW FULLY ADHERED TPO ROOF SYSTEM PER DETAILS AND SPECIFICATIONS.

3 MOVEMENT AND REINSTALLATION OF EXISTING CONDENSING UNIT (SERVING TEMPERATURE SENSITIVE EQUIPMENT) SHALL BE COORDINATEDWITH OWNER. RE-USE EXISTING SUPPORT PADS FOR THIS UNIT.

4 EXISTING SATELLITE DISH TO REMAIN. COORDINATE RELOCATION DURINGCONSTRUCTION WITH OWNER.

5 EXISTING CONDENSING UNIT, INCLUDING EQUIPMENT PADS, TO REMAIN.6 REPLACE EXISTING ROOF PENETRATION CURB WITH NEW URETHANE CURB

SYSTEM.7 EXISTING SATELLITE TO REMAIN. OPERATION TO BE MAINTAINED

THROUGHOUT CONSTRUCTION.8 EXISTING METAL FLASHING OVER SATELLITE FRAME/PARAPET WALL

CONNECTION TO BE REMOVED. INSTALL NEW PREFINISHED METAL FLASHING TO MATCH EXISTING.

9 EXISTING METAL PARAPET CAP TO BE REMOVED. COMPLETELY COVER PARAPET WITH FULLY ADHERED MEMBRANE WITH NO METAL CAP.

10 EXISTING METAL PARAPET CAP TO BE REMOVED. INSTALL NEW PRE-FINISHED METAL FASCIA COVER (DRIP EDGE) OVER NEW MEMBRANE PER DETAIL 3/A-501.

11 EXISTING VIDEO SECURITY SYSTEM TO REMAIN DURING CONSTRUCTION. COORDINATE TEMPORARY REMOVAL AND REINSTALLATION WITH OWNERPRIOR TO CONSTRUCTION.

12 EXISTING SATELLITE TO REMAIN IN OPERATION DURING CONSTRUCTION.13 EXISTING ROOF SCUPPER AND CONDUCTOR HEAD/DOWNSPSOUT TO

REMAIN. PROVIDE NEW FLASHING PER MANUFACTURER.14 EXISTING ROOF TRANSITION “STEP”: INSPECT SUBSTRATE FOR DAMAGE

AND REPAIR AS NECESSARY. INSTALL NEW MEMBRANE ROOFING SYSTEM.15 EXISTING ROOFTOP UNIT: FLASH PER MANUFACTURER'S

RECOMMENDATION.16 EXISTING ROOF VENT: FLASH PER MANUFACTURER'S RECOMMENDATION.17 INSTALL 30” WIDE WALKWAY PADS WHERE SHOWN ON ROOF PLAN.18 EXISTING ROOF HATCH SHALL REMAIN. INSTALL NEW PERIMETER SAFETY

RAILING SYSTEM AROUND ROOF HATCH. SEE DETAIL 5/A-501.19 COORDINATE TEMPORARY REMOVAL AND REINSTALLATION OF FLEXIBLE

CONDUIT FOR WALL MOUNTED SECURITY CAMERA, IF REQUIRED20 REMOVE AND DISPOSE OF EXISTING CONDENSING UNIT. SALVAGE

EXISTING EQUIPMENT PAD AND RELOCATE TO EXISTING CONDENSING UNITAS NOTED.

21 INSTALL RELOCATED EQUIPMENT PAD FOR EXISTING CONDENSING UNIT.22 REMOVE EXISTING I-BEAMS AND REINSTALL EXISTING SATELLITES ON

EXISTING EQUIPMENT PADS.23 RELOCATE EXISTING JUNCTION BOX BELOW ROOF.24 REMOVE EXISTING CURB.25 INSTALL ½” PER 1' INSULATION CRICKET.

GENERAL NOTES26 DIMENSIONS SHOWN ARE FOR REFERENCE ONLY. CONTRACTOR SHALL

FIELD VERIFY ALL DIMENSIONS.27 CONTRACTOR SHALL FLASH AROUND ALL ROOF PENETRATIONS AND CURBS

PER MANUFACTURERS RECOMMENDATIONS, WHETHER SPECIFICALLY SHOWN OR NOT.

28 THE ENTIRE ROOF SYSTEM SHALL BE FULLY ADHERED. NO FASTENERS MAYPENETRATE THE EXISTING METAL DECKING DUE TO ELECTRICAL EQUIPMENT/CONDUIT LOCATED AGAINST THE UNDERSIDE OF THE DECK.

Page 5: ROOF REPLACEMENTS MISSOURI LOTTERY HEADQUARTERS … · 9 existing metal parapet cap to be removed. completely cover parapet with fully adhered membrane with no metal cap. 10 existing

ROOF EDGE WITH UNA-EDGE GRAVEL STOP (GS)

1/2" (13 mm) MIN.

1/2" (13 mm) MIN.

EXISTINGMASONRY WALL

1-3/4" STAINLESS STEEL RING SHANK 5DCOMMON NAILS @ 8" (203 mm) O.C. MAX. 3/4"FROM TOP OF CLEAT.

CONTINUOUS BEAD OFTPO GP SEALANT (REQUIRED)

1-1/4" HOT DIPPED GALVANIZED ROOFNAILS @ 6" (152 mm) O.C. MAX

EXISTNG WOOD NAILER

PRE-FINISHED METALSYSTEM 8" MAX FACE

20 GA.CONTINUOUS CLEAT

INSTALL PERIMETER SAFETY

RAILING SYSTEM, PER ROOF

HATCH MANUFACTURER.

TYPICAL.

ACCESS GATE

1 1/2" = 1'-0"

CANOPY WALL DETAIL

2

####-#####-2020-0227-####

ISSUE DATE:

SHEET NUMBER:

CHECKED BY:DRAWN BY:

DESIGNED BY:

DATE:REVISION:

SHEET TITLE:

REVISION:DATE:

REVISION:DATE:

CAD DWG FILE:

STATE OF MISSOURIMICHAEL L. PARSON,GOVERNOR

OFFICE OFADMINISTRATIONDIVISION OF FACILITIESMANAGEMENT / DESIGNAND CONSTRUCTION

A-501

DEPARTMENT OF REVENUESTATE LOTTERY COMMISSION

ROOF REPLACEMENTS

MISSOURI LOTTERYHEADQUARTERS ANDDISTRIBUTION CENTER

1823 SOUTHRIDGE DRIVEJEFFERSON CITY, MISSOURI

PROJECT # N200701ASSET #LOTTERY HEADQUARTERS8611951001DISTRIBUTION CENTER8611951002

2/27/2020

N200701A-RF-A501Rkelled

blockl

ROOF DETAILS

1 1/2" = 1'-0"

WALL TRANISITION DETAIL

1

TPO MEMBRANE

PLATED MEMBRANE FASTENERS @ 6" O.C. MAX TPO FLASHING

TPO MEMBRANE COVER BOARD TAPERED INSULATION SYSTEM

EXISTING E.I.F.S.PARAPET WALL

PREFINISHED METALFASCIA COVER

EXISTING WOOD BLOCKINGEXTEND MEMBRANE OVER WALL

TPO MEMBRANE COVER BOARDTAPERED INSULATION SYSTEM

MEMBRANE FLASHING

EXISTING WOOD BLOCKING

TPO MEMBRANE

PLATED MEMBRANE FASTENERS @ 6" O.C. MAX TPO FLASHING TPO MEMBRANE COVER BOARD TAPERED INSULATION SYSTEM

EXISTING METAL DECK

1 1/2" = 1'-0"

RTU CURB SECTION

4

PRE-FINISHED COUNTER FLASHING WITHFOLDED LOWER EDGE FASTENED @ 8" O.C. MAX

EXISTING RTU GASKETEXISTING RTU CURB FRAMENEOPRENE-GASKETED METAL TO WOODFASTENERS

FULLY ADHERED MEMBRANEEXISTING CANT

FULLY ADHERED MEMBRANE COVER BOARD

TAPERED INSULATION SYSTEM

6" = 1'-0"

TERMINATION AT TOP OF WALL WITH FASCIA COVER

3

EXISTING WOOD BLOCKING

EXISTING INSULATION SYSTEM

NOT TO SCALE

ROOF HATCH SAFETY RAILING

5

SHEET 5 OF 5