1
7'-2 1 4 " BG.15.77m BG.10.35m(33.96') BG.10.45m(34.28') BG.10.82m(35.50') BG.12.42m BG.12.09m(39.67') IBG.10.76m(35.30') IBG.10.93m(35.87') IBG.11.24m(36.89') IBG.11.31m(37.10') IBG.12.12m(39.76') IBG.12.15m(39.88') IBG.12.33m(40.47') IBG.10.88m(35.70') IBG.11.67m(38.29') BG.13.24m(43.44') BG 13.24M (51.74') BG 12.42M (40.75' PARKING ENTRY SERVICE PARKING UNDER GROUND PARKING FOUNDATION EXISTING BASEMENT FOUNDATION WEST WING FOUNDATION el. 65.25' 3rd FLOOR LEVEL (19.89m) el. 56.41' 2nd FLOOR LEVEL (17.19m) el. 47.58' MAIN FLOOR LEVEL (14.50m) el. 38.13' BASEMENT LEVEL (11.65m) 11'-7" 8'-10" 8'-10" 9'-5 1/2" 9'-3" 57 11 1/2" 10'-0" el. 28.88' SUBBASEMENT LEVEL (8.80m) el. 76.83' 4th FLOOR LEVEL (23.42m) el. 86.83' ROOF LEVEL (26.46m) 5'-9" 5'-9" 234'-0" 234'-0" 15'-10" 15'-10" 12'-0" 12'-0" 10'-6" 10'-6" 11'-6" 11'-6" 12'-4" 12'-4" 16'-7" 16'-7" 14'-8" 14'-8" 12'-4" 12'-4" 11'-3" 11'-3" 11'-3" 11'-3" 18'-0" 18'-0" 15'-11" 15'-11" 12'-4" 12'-4" 18'-2 1/2" 18'-2 1/2" 12'-2" 12'-2" 11'-0" 11'-0" 12'-4 1/2" 12'-4 1/2" 6e 4e 3e 1e 10 9 8 7 6 5 4 3 2 1 6w 4w 3w 2w 1w 5 3 6 4 1 8 4 1 1 3 4 5 6 7 EAST PROPERTY LINE EAST SETBACK LINE WEST PROPERTY LINE WEST SETBACK LINE T.O. PARAPET 78.41' T.O.PARAPET 89.31' T.O. PARAPET 74.50' (EXISTING) TOP 78.41' T.O.PARAPET 89.31' Proposed North Elevation Point Grey Private Hospital Expansion STUART HOWARD MEMBERS AIBC - RAIC - AIA S H A ARCHITECTS INC. STUART HOWARD MEMBERS AIBC - RAIC - AIA S H A ARCHITECTS INC. Sheet: 0 5 10 20 30 50 ft 0 5 10 20 30 50 ft 3.03 Drawing: Date: February 17, 2012 WALL FINISHING SCHEDULE GREEN WALL LEDGESTONE - GRAY STONE SIDING MASONRY PANELS GLAZED SPANDREL PANELS PREFINISHED GRAY ALUMINUM PANELS GLAZED GUARDRAIL GLAZED CANOPY STEEL STAIR 1 3 5 6 4 2 7 9

3.03 [Proposed North Elevation]€¦ · T.O. PARAPET 78.41’ T.O.PARAPET 89.31’ T.O. PARAPET 74.50’ (EXISTING) TOP 78.41’ T.O.PARAPET 89.31’ Point Grey Private Hospital Expansion

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3.03 [Proposed North Elevation]€¦ · T.O. PARAPET 78.41’ T.O.PARAPET 89.31’ T.O. PARAPET 74.50’ (EXISTING) TOP 78.41’ T.O.PARAPET 89.31’ Point Grey Private Hospital Expansion

7'-2

1 4"

BG.15.77

m (51.7

4')

BG.10.35

m (33.9

6')BG.10.45m (34.28')

BG.10.82m (35.50')

BG.12.42m (40.75')

BG.12.09m (39.67')IBG.10.76m (35.30')

IBG.10.93m (35.87')

IBG.11.24m (36.89')

IBG.11.31m (37.10')

IBG.12.12m (39.76')

IBG.12.15m (39.88') IBG.12

.33m (4

0.47')

IBG.10.88m (35.70')

IBG.11.67m (38.29')

BG.13.24m (43.44')

BG 13.24M (51.74')

BG 1

2.42

M (4

0.75

')

PARKINGENTRY SERVICE PARKING

UNDER GROUND PARKING FOUNDATION

EXISTING BASEMENT FOUNDATION

WEST WING FOUNDATION

el.65.25' 3rd FLOOR LEVEL(19.89m)

el.56.41' 2nd FLOOR LEVEL(17.19m)

el.47.58' MAIN FLOOR LEVEL(14.50m)

el.38.13' BASEMENT LEVEL(11.65m)

11'-7

"8'

-10"

8'-1

0"9'

-5 1

/2"

9'-3

"

57 1

1 1/

2"

10'-0

"

el.28.88' SUBBASEMENT LEVEL(8.80m)

el.76.83' 4th FLOOR LEVEL(23.42m)

el.86.83' ROOF LEVEL(26.46m)

5'-9"5'-9"

234'-0"234'-0"

15'-10"15'-10"12'-0"12'-0"10'-6"10'-6"11'-6"11'-6"12'-4"12'-4"16'-7"16'-7"14'-8"14'-8"12'-4"12'-4"11'-3"11'-3"11'-3"11'-3"18'-0"18'-0"15'-11"15'-11"12'-4"12'-4"18'-2 1/2"18'-2 1/2"12'-2"12'-2"11'-0"11'-0"12'-4 1/2"12'-4 1/2"

6e 4e 3e 1e 10 9 8 7 6 5 4 3 2 1 6w 4w 3w 2w 1w

5 36 418 4 113 45 6 7

EAST

PR

OPE

RTY

LIN

E

EAST

SET

BAC

K LI

NE

WES

T PR

OPE

RTY

LIN

E

WES

T SE

TBAC

K LI

NE

T.O

. PAR

APET

78.

41' T.

O.P

ARAP

ET 8

9.31

'

T.O

. PAR

APET

74.

50' (

EXIS

TING

)

TOP

78.4

1'

T.O

.PAR

APET

89.

31'

Proposed North ElevationPoint Grey Private Hospital ExpansionSTUART HOWARD

MEMBERS AIBC - RAIC - AIA

S HA ARCHITECTS  INC.

STUART HOWARD

MEMBERS AIBC - RAIC - AIA

S HA ARCHITECTS  INC.Sheet:0 5 10 20 30 50 ft0 5 10 20 30 50 ft 3.03

Drawing:

Date: February 17, 2012

WALL FINISHING SCHEDULE

GREEN WALL

LEDGESTONE - GRAY STONE SIDING

MASONRY PANELS

GLAZED SPANDREL PANELS

PREFINISHED GRAY ALUMINUM PANELS

GLAZED GUARDRAIL

GLAZED CANOPY

STEEL STAIR

1

3

5

6

4

2

7

9