6

Click here to load reader

Rohit_Sethi-Resume

Embed Size (px)

Citation preview

Page 1: Rohit_Sethi-Resume

COVER PAGE

My extensive experience in Electrical Engineering aligns me extremely well with the Electrical Manager position currently on offer. I now desire a fresh challenge, with the possibility of progression, to enable me to .I fill my career objectives and build upon the highly relevant skills I have already attained.

As my CV reflects, I have amassed over 7 years & 7 Months progressive experience in Planning, Installation & Commissioning of Electrical projects and I am presently Manager-Electrical at Reliance Industries Limited. In this role, I oversee various Project Planning, Budget planning, material & manpower costing, Project Scheduling, Execution & their timely completion for establishment of new Projects in Oil & gas and Petrochemical Plants and I have expertise in designing, Planning, procurement, installation & commissioning of Electrical Switchgears. I advise on strategies to optimize maintenance with minimal disruption based on Root Cause Analysis, Failure Analysis of Equipment failures and provides solutions to prevent from future failures in Oil/gas & Petrochemical Industries.

I am an Associate Member (AMIE) of ‘The Institution of Engineers (India)’.

Prior to this, I was attached as Electrical Services Engineer at Continental Electrical Industries Ltd with responsibility for designing Single Line Diagrams, Cable layout, selection of Cable & switchgears as per design requirement of client. Some of my Achievements include major energy and cost savings. I believe I am a suitable candidate for the position in view of my professional experience and project management expertise. In the meantime, I look forward to hearing from you at your earliest convenience.

Yours sincerely, Rohit Sethi AMIEMob-91-7600006962Vadodara, Gujarat-391345

Page 2: Rohit_Sethi-Resume

ROHIT SETHI

Address: C-844, Sector-1, Petrochemicals Township,Vadodara, Gujarat- 391345

Mob. No.: 07600006972Email id: [email protected]

[email protected]

Electrical Engineer

Intend to build a career with leading corporate of a Hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential.

TOTAL WORK EXPERIENCE-: 7 Years & 7 Months

1. Employer: Reliance Industries Limited (Vadodara Manufacturing Division). Duration: From JULY’08 till Date.

Designation: Manager-Electrical

Present Job profile/Responsibilities:

1. Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion of multi-discipline projects

2. Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Installation, commissioning, operation & maintenance of HV/MV/LV Switchgears like Vacuum Circuit Breakers, Minimum Oil Circuit Breakers and Air Circuit Breakers.

3. Operation and maintenance of Static and Rotary Electrical equipments in a Petrochemical Plant4. Project Planning, Budget Planning, Material & manpower costing, scheduling, execution & end to end

completion of projects 5. Working on SAP-PM & MM Module(P10) Server for Project planning, day to day Plant engineering jobs.6. Emergency shutdown handling, Troubleshooting of Electrical Equipment Failures and blackout handling.7. Condition Monitoring of critical equipment and analysis of trends to incorporate results into Maintenance

Management system.8. Online and off line condition monitoring of equipments for detection and rectification of abnormalities in the

equipment to improve system reliability.9. Shutdown Planning, procurement and execution of Projects.10. Sizing, Selection & preparing documents of Electrical Equipment Specifications for new Projects. 11. Project Planning, Budget Planning, Material & manpower costing, scheduling and execution &

completion for Installation, commissioning, operation and maintenance of HV/LV Motors, Relays like Numerical Relays.

Objective

Work Experience / Job Profile

Page 3: Rohit_Sethi-Resume

12. Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Installation, commissioning, operation & maintenance of HV Panels, PCC Panels and MCC Panels in Oil & gas and Petrochemical area.

13. Cable Selection and cable Schedule Preparation for HV/MV/LV cables (XLPE,PVC etc.)14. Preparation of Cable Layout for Electrical Systems15. Preparation of Earthing Layout of Substations, Production Plants etc.16. Study of Hazardous area classification and selection of equipment based PHA, HAZOP & TBRA processes.17. Expertise in Process Safety Management in Petrochemical Plants.18. Preparation and enrichment of Bill of Materials for all Static Rotary equipments.19. Installation, commissioning, operation & maintenance of Remote Operated valves.20. Shutdown planning, Material & Manpower Management and execution of the Jobs.21. Installation, commissioning, operation & maintenance of Variable Speed Drives, Battery Banks.22. Root Cause Analysis by Why-Why, Fish-bone & FMEA analysis of Failures to prevent repetitive failures in SAP

system.23. Online and off line condition monitoring of equipments for detection and rectification of abnormalities in the

equipment to improve system reliability.24. Shutdown Planning, procurement and execution of Projects.25. Basic knowledge of AutoCAD.26. Preparation and selection of Electrical Equipment Specifications. 27. Project Lead for Planning, procurement, installation & commissioning of various projects28. Monitor site activities including installation, commissioning & testing of electrical equipment, cable laying etc.29. Energy Saving Team co-ordinator for providing energy saving solutions to Plants.30. Material Procurement, Turnaround Planning, Routine and Turnaround maintenance via SAP-PM & MM Module

System.31. Carry out job hazard analysis and ensure compliance to safety requirements.32. Job scope assessment, prepare cost estimate and functional specifications for switchgears, cables, motors,

transformers, air conditioners etc. and supervise field maintenance jobs.33. Upgradation of existing switchgears by new advanced switchgears to improve the reliability & life of Electrical

systems.34. Working on Process Safety Management to sustain and maintain safety of personnel by compliance of Safety

Procedures and Best Maintenance Practices.35. Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for

Installation, commissioning, operation & maintenance of Lighting Systems, Fire Alarm Systems and grounding systems.

36. Working as a Champion on Process Safety Management.37. Hands on experience on Remote operated Valves in Petrochemical Plants.38. Expertise in Safety Procedures of Lockout/Tagout, temporary Power supply preparations etc.39. Expertise in Reliability engineering of Static & rotary Electrical equipments.

Projects:

11 Worked as Project Lead in a project named ‘LAB-EQ-CRITICAL PANELS’, I had worked on for Load calculation, Preparation of SLDs, their schematics, Breakers selection, Fuse Disconnect Switches, Cables selection & layout preparation, Earthing layout for designing of 30nos. 415V Critical PCC/MCC Panels .11 In a project named- ROV-MCC Panel, I had worked on preparation of SLD & schematics, Selection of VFD, Fuse Disconnect Switches, Fuses selection for designing of 2 nos. MCC panels and also worked on Installation & Commissioning of 10Nos. Motor Operated Valves(MOVs).11 Worked as Project Lead for Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion on selection of PCC/MCC Panels for up-gradation of existing system to enhance the capacity of the plant.11 Worked as Project Lead on Selection, Installation & Commissioning of HV/MV/LV breakers like VCBs, MOCB, ACBs etc.11 Worked as Project Lead Selection, Installation & Commissioning of 10nos. 415V Critical PCC/MCC Panels.11 Worked as Project Lead for Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Selection, Installation & Commissioning of 50Nos. Motor Operated Valves(MOVs).

Page 4: Rohit_Sethi-Resume

11 Worked as Project Manager for Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Selection, Installation & Commissioning of HT/LT Motors11 Worked as Project Engineer Selection, Installation & Commissioning of UPS.11 Worked as Project Manager for Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Selection, Installation & Commissioning of 220V/110V Battery Chargers.111 Worked as Project Manager for Project Planning, Budget Planning, Material & manpower costing, scheduling and execution & completion for Selection, Installation & Commissioning of Variable speed drives.

2. Employer: Continental Electrical Industries Limited, Lucknow Duration: From JULY’07 to JUNE’08( 01 Year) Designation:Electrical Engineer

Job profile/Responsibilities:

11 Designing of all Types of LT Control Panels as per client’s requirement.11 Load calculation of PCC/MCC Panels11 Study & Development of Single Line Diagram (SLD).11 Preparation & execution of Bill of Materials for all Projects.11 Selection of Fuse disconnect switches and breakers.11 Cable Selection & layout preparation for all PCC/MCC panels11 Earthing layout preparation for all projects11 Installation & Commissioning of LT 415V distribution panels like MCC, Relay Panels at Client

Location11 Performance Testing of LT Control Panels before installation.111 Supervision of Fabrication of Control Panels111 Planning, scheduling & execution of all types of Fabrication Jobs of LT Control Panels

Professional:

Qualification Institute/board Year of passing % of marksB.Tech

(Electrical Engineering)Sri Ramswaroop Memorial College of Engineering &

Management (U.P. technical University)

(2003-2007) 68.22

Academic:

Qualification Institute/board Year of passing % of marks

10+2Lucknow Public Inter College,

Lucknow, U.P. Board 2002 73.2

10thLucknow Public Inter College,

Lucknow, U.P. Board 2000 69.83

Trainings availed:

Certified training by M/s ABB on Design, Operation, Maintenance, Routine & Type tests of EHV/HV Switchyard Equipments upto 400KV like SF6 Circuit Breakers, Current Transformers, Capacitor Voltage Transformers, Surge Arresters in 2012.

Qualifications

IT Skills

Page 5: Rohit_Sethi-Resume

Achievements:

I am an Associate Member (AMIE) of ‘The Institution of Engineers (India)’. Excellent Performer for Two consecutive years in 2014-15 & 2013-14 in Current Organization. Participated representing Reliance Industries Ltd. in the competition for 18th Annual Awards for

Outstanding Young Managers-2009(AAOYM) organized by Baroda Management Association in May’09 at Vadodara.

Father’s Name Late Shri Shashi Kumar SethiDate of Birth 25-12-1985Permanent Address 554/184/2KA/5, Kailashpuri, Alambagh, Lucknow-226005(U.P.)Languages Proficiency English, Hindi Marital Status SingleNationality Indian

Declaration: I hereby declare that all above-mentioned information is true to the best of my knowledge.

Place: VADODARA

References-

1- Rajeshkumar Parmar (Reporting Officer) - Reliance Industries Ltd, Contact No- 9998001077

2- Natvarlal Tank- Reliance Industries Ltd, Contact No- 9998975166

Operating Systems MS DOS, Windows-8 Packages SAP-PM & MM Module, MS Office-2003 to 2010

Personal Information

Page 6: Rohit_Sethi-Resume

Achievements:

I am an Associate Member (AMIE) of ‘The Institution of Engineers (India)’. Excellent Performer for Two consecutive years in 2014-15 & 2013-14 in Current Organization. Participated representing Reliance Industries Ltd. in the competition for 18th Annual Awards for

Outstanding Young Managers-2009(AAOYM) organized by Baroda Management Association in May’09 at Vadodara.

Father’s Name Late Shri Shashi Kumar SethiDate of Birth 25-12-1985Permanent Address 554/184/2KA/5, Kailashpuri, Alambagh, Lucknow-226005(U.P.)Languages Proficiency English, Hindi Marital Status SingleNationality Indian

Declaration: I hereby declare that all above-mentioned information is true to the best of my knowledge.

Place: VADODARA

References-

1- Rajeshkumar Parmar (Reporting Officer) - Reliance Industries Ltd, Contact No- 9998001077

2- Natvarlal Tank- Reliance Industries Ltd, Contact No- 9998975166

Operating Systems MS DOS, Windows-8 Packages SAP-PM & MM Module, MS Office-2003 to 2010

Personal Information