PROJECT OVERVIEWFrederick County Public Schools has selected the Walkersville Middle School campus as the new site for the Rock CreekSchool, which provides special education programs for students with complex medical conditions and severe intellectual,physical, emotional, hearing, vision and learning disabilities, from ages 3 through 21.
The Rock Creek School (RCS) Replacement will be: A newly developed design with a state-rated capacity of 120 students per the base bid and 190 students including all alternates. A stand-alone, single-story facility of about 79,474 gross square feet base building area with approximately 21,699 gross square feet of add
alternate area, for a total proposed area of approximately 101,173 gross square feet. An energy-efficient building that meets U.S. Green Building Council Leadership in Energy and Environmental Design (LEED) Silver
certification requirements, local building codes and educational program specifications.
FCPS Project Information Webpage: http://www.fcps.org/facilities/rock-creek-school
The mission of Rock Creek School is to provide a safe, respectful, caring, and enjoyable learning environment in which students can develop communication and independent-living
skills to achieve their full potential at school, at home, and in their communities.
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
PROJECT OVERVIEWRock Creek School (RCS) Guiding Principles
1. ACCESS AND EQUITY | Provide access to opportunities for meaningful engagement with age appropriate peers and supporting communities in orderto provide an equitable and appropriate educational experience.
2. COMMUNICATION | Create pervasive opportunities for communication which are integrated throughout the school day.
3. STUDENT ENGAGEMENT | Maximize student engagement in daily life via opportunities for self-expression and individual choice.
4. MOVEMENT | Support freedom of movement and ease of movement at all capacities and age groups – within personal space and throughout publicspace.
5. SENSORY STIMULATION | Provide a multi-sensory, flexible environment that offers students individual control of and access to a full spectrum ofsensory engagement in learning.
6. INDEPENDENCE | Foster maximum independence in authentic activities of daily living, in vocational opportunities and in education.
7. RESPONSIVENESS | Accommodate individual learner abilities and needs via a flexible, adaptable learning environment.
8. CONTINUOUS LEARNING | Support continuous improvement in teaching and learning via provisions for professional development, family support andcollaboration.
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
SCHEDULEProject Schedule Overview
Educational Specification development Completed November 2015
Feasibility Study & Initial Site Evaluation Completed August 2016
Final Site Selection October – December 2017
Schematic Design January 2018 – May 2018
Design Development June 2018 – October 2018
Construction Documents and Permitting November 2018 – June 2019
Bidding and Award June 2019 - September 2019
Construction September 2019 – March 2021
New Rock Creek School Opens June 2021
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
EXISTING SITE AERIAL
PRIORLIBRARY
LOW PT 294.0’
HIGH PT 308.0’
FIELDS
BUILDABLE AREA =
13.08 ACRES
EXIST. PUBLIC SANITARY LINE
WALKERSVILLE MIDDLE
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
SITE PLAN
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
ROCK CREEK SCHOOL REPLACEMENTCD PRESENTATION | 27 MARCH 2019FIRST FLOOR PLAN WITH ALTERNATES
Alternative Education Wing Alternate
Parks & Recreation Gym Alternate
Middle School Wing Alternate
Future Capacity Expansion
Greenhouse Alternate
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
ROCK CREEK SCHOOL REPLACEMENTCD PRESENTATION | 27 MARCH 2019PENTHOUSE FLOOR PLAN
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
EXTERIOR ELEVATIONS
WEST (FRONT) ELEVATION
NORTH ELEVATION
EAST (REAR) ELEVATION
SOUTH ELEVATION
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
PERSPECTIVE RENDERING
VIEW OF GYMNASIUM, BUS CANOPY, & MAIN ENTRANCE FROM THE SOUTH
CONCEPT IMAGERY FOR TRANSLUCENT FIBERGLASS PANELS AT THE GYMNASIUM
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
PERSPECTIVE RENDERING
VIEW OF MAIN OFFICE AND COMMONS
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
PERSPECTIVE RENDERING
VIEW OF MEDIA CENTER
ROCK CREEK SCHOOL REPLACEMENTCONSTRUCTION DOCUMENTS PRESENTATION
PERSPECTIVE RENDERING
VIEW OF DINING AREA