Road Safety Audit Stage 1/2 Branston Locks Link Road and Canal Bridge – Phase 1 CDX8620 /RSAStg1/2 Revision Draft
March 2016
P/2016/00474
Received 24.03.2016
Document Control Sheet
Project Name: Branston Locks Link Road and Canal Bridge – Phase 1
Project Number: CDX8620
Report Title: Road Safety Audit Stage 1/2
Report Number: RSAStg1/2
Issue Status/Amendment
Prepared Reviewed Approved
Draft Name: Marius Grigoras Name: Nick Newton
Name: Jeff Webb
Signature: Date: 15/03/2016
Signature: Date: 15/03/2016
Signature: Date: 15/03/2016
Name:
Name:
Name:
Signature: Date:
Signature: Date:
Signature: Date:
Name:
Name:
Name:
Signature: Date:
Signature: Date:
Signature: Date:
Name:
Name:
Name:
Signature: Date:
Signature: Date:
Signature: Date:
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - i - Issued: March 2016
Contents
1 Introduction ....................................................................................................... 1
1.1 Commission and Terms of Reference................................................................... 1
1.2 Scheme Description ........................................................................................... 2
1.3 Audit Management ............................................................................................ 3
2 Items Raised at this Stage 1/2 Road Safety Audit ............................................. 4
2.1 General ............................................................................................................ 4
2.2 Local Alignment ................................................................................................. 6
2.3 Non-Motorised User (NMU) Provision ................................................................... 7
2.4 Road Signs, Carriageway Markings and Lighting ................................................... 9
3 Audit Team Statement ..................................................................................... 10
Appendix A Scheme Documentation A.1
Appendix B Problem Location Plan B.1
Tables
Table 1: Audit Team Membership ........................................................................................ 1
Table 2: Scheme Documentation ...................................................................................... A.1
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 1 - Issued: March 2016
1 Introduction
1.1 Commission and Terms of Reference
1.1.1 This report results from a Stage 1/2 Road Safety Audit carried out on Branston in
Staffordshire, at the request of Amey Project Management Team in Stafford on behalf of
Staffordshire County Council.
1.1.2 The Audit Team membership was as follows:
Table 1: Audit Team Membership
Membership Name Details
Audit Team Leader N Newton IEng, FIHE, FSoRSA, FCHIT Reg RSA(IHE)
Team Leader (Road Safety)
Audit Team Member M Grigoras MSc, EngTech, MIHE, Reg RSA (IHE)
Transport Planner
1.1.3 The team leader holds a Road Safety Certificate of Competence meeting the
requirements of the European Directive 2008/96/EC and HD19/15 Annex J.
1.1.4 It is confirmed that this is a Stage 1/2 Road Safety Audit and was undertaken in
accordance with the requirements of HD19/15, as no additional audit requirements were
requested. The audit comprised an examination of the completed works together
drawings issued to the audit team, these are listed in Appendix A.
1.1.5 A site visit was completed during daylight hours on 5th November 2015, it was raining at
the time, and the road surface was wet.
1.1.6 The terms of reference of the audit are described in HD19/15. The team has examined
and reported only on the road safety implications of the scheme as presented and has
not examined or verified the compliance of the designs to any other criteria.
1.1.7 All comments contained in the report with regard to Traffic Signs will be in accordance
with the Traffic Signs Regulations and General Directions (TSRGD), 2002. Diagram
numbers will be referred to.
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 2 - Issued: March 2016
1.1.8 The audit brief provided to the Audit Team for this Stage 1/2 Road Safety Audit
consisted of an audit request form and scheme drawings along with collision data, traffic
and speed data, CIP and CDM documents and also a NMU audit report. The information
was considered adequate for the purpose of carrying out the Road Safety Audit
requested.
1.1.9 No departures from standards relating to the scheme were provided to the Audit Team.
1.2 Scheme Description
1.2.1 The Branston Locks Development will comprise a new sustainable community to the
South West of Burton upon Trent, Staffordshire.
1.2.2 The proposed scheme aims to create a new access route from the A38 roundabout to
Branston Locks Development including a new Canal Bridge, access to Employment Site
and junction back onto Branston Road.
1.2.3 This includes re-aligning the existing Branston Road for a length of approximately 600
metres with a 100 metres extension in to the employment site together with
implementing a new footway / cycleway and street lighting. Other works include the
demolition of an existing property, Bridgefield House, traffic signage, landscaping,
statutory undertakers service diversion.
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 3 - Issued: March 2016
1.3 Audit Management
1.3.1 A draft report will be submitted to the Project Sponsor for checking, consideration and
approval. The Project Sponsor is responsible for agreeing with the Audit Team the
content of the final version of the report.
1.3.2 Upon issue of the final version of the Road Safety Audit report the Project Sponsor will
request the design team to prepare a Road Safety Audit Response Report in line with
HD19/15 Section 3 and Annex K. A copy of this should be issued to the Audit Team for
information.
1.3.3 If any problem or recommendation is not accepted on submission of the final report, a
signed ‘Exception Report’ is to be approved by the Project Director, a copy of which
should be sent to the Audit Team Leader for record keeping purposes.
1.3.4 Any other issues including those relating to maintenance which the Terms of Reference
exclude from this report but which the Audit Team wishes to draw the attention of the
Project Sponsor will be documented in a separate covering letter to this report.
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 4 - Issued: March 2016
2 Items Raised at this Stage 1/2 Road Safety Audit
2.1 General
2.1.1 Problem
Location: Newly proposed pond
Summary: Errant vehicles could potentially plunge in the pond
The drawing CDX8620/R04/01 Vehicle Restraint System & Fencing provided to the audit
team shows no VRS around the newly proposed pond.
This could result in errant vehicles in the event of loss of control to plunge into the pond,
potentially causing injuries to the occupants with the risk of drowing.
Recommendation
A RRRAP assessment should be undertaken for the area surrounding the pond and
pending its outcome adequate protection should be install to protect vehicles from
plunging into the pond.
No
protection
for the pond
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 5 - Issued: March 2016
2.1.2 Problem
Location: Proposed Canal Bridge
Summary: VRS length insufficient
The westbound approach to the proposed canal bridge has the VRS connecting with the
structure represented in drawings no CDX8620/R04/01 and CDX8620/S/001D. It is noted
that the length of the VRS is 20m and a departure is required, however the audit team
was not provided with any departures from standards.
The minimum length of VRS must be 30m in advance of a hazard as per TD19/06. If the
length of VRS is less than 30m, then the VRS will not perform as designed and the
outcome of errant vehicle hitting this barrier could not be predicted and may strike the
structure which the barrier is intended to protect.
Recommendation
The length of the VRS should be extended to a minimum length of 30m as per TD19/06.
VRS length
insufficient
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 6 - Issued: March 2016
2.2 Local Alignment
2.2.1 Problem
Location: Junction of Link 1 with Link 3
Summary: Potential conflict between vehicles turning right and oncoming traffic
The proposed crossing point over Link 1 adjacent to Link 3, have proposed bollards to be
installed on the splitter island which are not clearly specified. Due to the road alignment
the bollards might interfere with the visibility of vehicles waiting to turn right from Link
Road 1 onto Link Road 3.
This could lead to potential side impact or rear end shunt collisions.
Recommendation
The designer should ensure that the height of the installed bollards or any additional
street furniture will not block the visibility of vehicles waiting to turn right into Link 3.
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 7 - Issued: March 2016
2.3 Non-Motorised User (NMU) Provision
2.3.1 Problem
Location: Crossing point east of the Canal Bridge
Summary: Position of the crossing east of the Canal Bridge could be ignored by NMu’s
crossing the Link Road 1
The NMU’s accessing Link Road 1 from the Link Road 4 via the cycle track or the steps
once reaching the footway their desired line if they intend to cross over is straight across
the Link Road 1. Although a crossing has been specified this is considered to be too far
west and this may result in pedestrians and cyclists waiting within the hatch road
markings where they will be vulnerable to potential vehicle strikes.
Recommendation
The crossing should be relocated to the east as much as possible, considering the
minimum distance for a crossing from a junction specified in the LTN 29/5. Also
consideration should be given to relocating the staircase to the left if possible in order to
align the crossing with the location where the NMU’s are accessing to the Link Road 1
footway from the canal side.
Potential NMU-
motorist
conflict
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 8 - Issued: March 2016
2.3.2 Problem
Location: Cyclist route between NW Link Road 1 and Link Road 4
Summary: Conflicts between cyclist and vehicles are exacerbated by making the cyclist
to cross Link Road 1 twice
The cyclists who will access the Link Road 4 travelling from north-west of Link Road 1
are made to cross the carriageway twice and therefore increasing the risk of potential
collisions with motorists.
Furthermore cyclists accessing the footway from the canal side area not presented with
a cycle end of route sign, which means they will use this footway if it is their intended
route, but from the opposite side of this footway there is a sign for cycle route to end.
Recommendation
The westbound footway of Link Road 1 should be made for shared pedestrians and
cyclists.
Furthermore considering there are two crossings within a short distance that could be
used by cyclists, it would be beneficial if cyclists warning signs would be installed either
side of the crossing points.
Cyclist having
to cross twice
Conflicting
signs
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 9 - Issued: March 2016
2.4 Road Signs, Carriageway Markings and Lighting
2.4.1 Problem
Location: Link Road 2 & Link Road 3
Summary: Lack of directional signs could lead to rear end shunts collisions
No directional signs for Link Road 2 and Link Road 3 are being specified in the drawings
issued to the audit team. When exiting the roundabout towards Link 3 there is a flag
type directional sign with the direction of Tatenhill. This information it is not represented
on the proposed drawings on the intersection of Link Road 2 with Link Road 3 which
may lead to motorists missing the turn towards Tatenhill or braking in the last minute
which could potentially result in rear end shunts. The Link Road 3 junction is mainly of
concern as the audit team is aware of the further developments plans along this route
and it is considered that this is going to by a busy junction.
Recommendation
Directional signs should be installed for Link Road 3 and Link Road 2 junctions, however
the designer should ensure that the installed signs will not obscure or will not be
obscured by any other signs.
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - 10 - Issued: March 2016
3 Audit Team Statement
3.1.1 We certify that this audit has been carried out in accordance with HD19/15.
AUDIT TEAM LEADER: AUDIT TEAM LEADER:
Nick Newton IEng, FIHE, FSoRSA, FCHIT
Reg RSA(IHE)
Signed:
Marius Grigoras MSc MIHE Reg RSA(IHE) Signed:
Nick Newton IEng, FIHE, FSoRSA, FCHIT
Reg RSA(IHE)
Signed:
Team Leader (Road Safety)
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 15/03/2016 Transport Planner
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 03/02/2016 Team Leader (Road Safety)
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 29/01/2016
AUDIT TEAM MEMBER: AUDIT TEAM MEMBER:
Marius Grigoras MSc, EngTech, MIHE,
Reg RSA(IHE)
Signed:
Nick Newton IEng, FIHE, FSoRSA, FCHIT
Reg RSA(IHE)
Signed:
Marius Grigoras MSc MIHE Reg RSA(IHE) Signed:
Transport Planner
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 15/03/2016 Team Leader (Road Safety)
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 03/02/2016 Transport Planner
Amey Consulting International Design Hub Colmore Plaza 20 Colmore Circus Birmingham B4 6AT
Date: 29/01/2016
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - A.1 - Issued: March 2016
Appendix A Scheme Documentation
The Road Safety Audit was conducted using the drawings listed in the table below.
Table 2: Scheme Documentation
Drawing Number Revision Details
Drawings Highways
GA/01 - General Arrangement
R01/00 T0 Cover Sheet
R04/01 T0 Vehicle Restraint Systems & Fencing
R04/02 T0 VRS Systems Verge Widening at protected Lighting Columns
R05/01 P0 Drainage General Arrangement
R05/11 P0 Pond Details
R05/12 P0 Soakaway Details
R06/02 P1 Link Road 1 Typical Sections (1 of 2)
R06/03 P1 Link Road 1 Typical Sections (2 of 2)
R06/13 T0 Longitudinal Sections (Sheet 1 of 2)
R06/14 T0 Longitudinal Sections (Sheet 2 of 2)
R06/15 T0 Cross Sections Link Road 1 (1of 4)
R06/16 T0 Cross Sections Link Road 1 (2 of 4)
R06/17 T0 Cross Sections Link Road 1 (3 of 4)
R06/18 T0 Cross Sections Link Road 1 (4 of 4)
R06/19 T0 Cross Sections Link Road 2 (1 of 3)
R06/20 T0 Cross Sections Link Road 2 (2 of 3)
R06/21 T0 Cross Sections Link Road 2 (3 of 3)
R06/22 T0 Cross Sections Link Road 3 (1 of 2)
R06/23 T0 Cross Sections Link Road 3 (2 of 2)
R06/24 T0 Cross Sections Link Road 4 (1 of 1)
R07/01 T0 Pavement Construction
R11/01 T0 Kerbs and Footways
R12/01 T0 Traffic Signs and Road Markings
R12/02 T0 Road Markings
R12/03 T0 Sign Details
SCC-HL-1001 - E-on Street Lighting Plan
LW-01 T0 Landscaping General Arrangement
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - A.2 - Issued: March 2016
Drawing Number Revision Details
LW-02 T0 Landscaping Tree Protection
LW-03 T0 Fencing , Gates & Maintenance Track
Drawings - Structures
S/001 - General Arrangement Visualisation
S/002 - General Arrangement Technical
S/006 - West Abutment Section
S/007 - East Abutment Section
S/008 - North Sectional Elevation And Details
S/009 - South Sectional Elevation And Details
S/011 - Parapet Details
Documentation
Collision and Traffic Data
2008 & 2009 Survey Data Locations
Accident Data 01.01.10 to 31.12.14
Feb 2009 29B026-Speed
Feb 2009 29B026-Week Volume
July 2008 28H017-Speed
July 2008 28H017-Week Volume
AIP
AIP Nurton Bridge REV 01
Nurton Bridge AIP Page Signed Off
CDM
HS-CDM-FO-01 CDX8620 Phase 1 Works
HS-CDM-Fo-10 CDX8620 Designers Aide Memoire
HS-CDM-FO-11 Design Hazard Management Register Branston
NMU Audit
Appendix A Issues Arising in NMU Audit
Branston Locks Non-Motorised User Audit
Project Name Branston Locks Link Road and Canal Bridge – Phase 1
Document Title Road Safety Audit Stage 1/2
Doc. Ref.:CDX8620 /RSAStg1/2 Rev. Draft - B.1 - Issued: March 2016
Appendix B Problem Location Plan
2.1.1
1
2.2.1
1
2.3.1
1
2.1.2
1
2.3.2
1
2.4.1
1
2.4.1
1