Upload
ibkhan80
View
215
Download
0
Embed Size (px)
Citation preview
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 1/22
NetAct OSS4.2
Global Reporter 4.8 CD1 ReleaseNotes
©Nokia Siemens Networks 1 (22)
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 2/22
OSS4.2 Release Notes
2 (22) ©Nokia Siemens Networks
The information in this document is subject to change without notice and describes only the productdefined in the introduction of this documentation. This documentation is intended for the use of NokiaSiemens Networks customers only for the purposes of the agreement under which the document issubmitted, and no part of it may be used, reproduced, modified or transmitted in any form or means
without the prior written permission of Nokia Siemens Networks. The documentation has beenprepared to be used by professional and properly trained personnel, and the customer assumes fullresponsibility when using it. Nokia Siemens Networks welcomes customer comments as part of theprocess of continuous development and improvement of the documentation.
The information or statements given in this documentation concerning the suitability, capacity, orperformance of the mentioned hardware or software products are given “as is” and all liability arisingin connection with such hardware or software products shall be defined conclusively and finally in aseparate agreement between Nokia Siemens Networks and the customer. However, Nokia SiemensNetworks has made all reasonable efforts to ensure that the instructions contained in the documentare adequate and free of material errors and omissions. Nokia Siemens Networks will, if deemednecessary by Nokia Siemens Networks, explain issues which may not be covered by the document.
Nokia Siemens Networks will correct errors in this documentation as soon as possible. IN NO EVENTWILL NOKIA SIEMENS NETWORKS BE LIABLE FOR ERRORS IN THIS DOCUMENTATION ORFOR ANY DAMAGES, INCLUDING BUT NOT LIMITED TO SPECIAL, DIRECT, INDIRECT,INCIDENTAL OR CONSEQUENTIAL OR ANY LOSSES, SUCH AS BUT NOT LIMITED TO LOSSOF PROFIT, REVENUE, BUSINESS INTERRUPTION, BUSINESS OPPORTUNITY OR DATA,THATMAY ARISE FROM THE USE OF THIS DOCUMENT OR THE INFORMATION IN IT.
This documentation and the product it describes are considered protected by copyrights and otherintellectual property rights according to the applicable laws.
The wave logo is a trademark of Nokia Siemens Networks Oy. Nokia is a registered trademark of Nokia Corporation. Siemens is a registered trademark of Siemens AG.
Other product names mentioned in this document may be trademarks of their respective owners, andthey are mentioned for identification purposes only.
Copyright ©Nokia Siemens Networks 2008. All rights reserved.
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 3/22
Contents
©Nokia Siemens Networks 3 (22)
Contents
1
Introduction to NetAct ...........................................................................5
1.1 Global Reporter Overview........................................................................5 2 Release Acceptance...............................................................................7 3 OSS 4.2 / GR Release Overview............................................................9 3.1 Global Reporter 4.8 CD1 Release Overview............................................9 3.2 Restrictions and Limitations ...................................................................10 3.3 Global Reporter 4.8 CD1 Release Compatibility....................................10 3.4 Fault Management and Maintenance.....................................................10 4 Global Reporter 4.8 CD1 Testing ........................................................13 4.1 Test Environment...................................................................................13 4.2 Test Results ...........................................................................................16 4.2.1 Correction Testing..................................................................................16 4.2.2 Regression Testing ................................................................................16 4.2.3 Software Update Installation Testing......................................................17 4.3 Remaining Open Faults..........................................................................17 5 Global Reporter 4.8 CD1 Customer Documentation .........................19 6 Delivery Description.............................................................................21 6.1 Delivery Media Content..........................................................................21
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 4/22
OSS4.2 Release Notes
4 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 5/22
Introduction to NetAct
©Nokia Siemens Networks 5 (22)
1 Introduction to NetAct Nokia Siemens Networks NetAct™ is a network and service managementframework that addresses the operator challenges to handle more network
elements, larger networks, greater complexity and explosive growth in trafficand data expected in future networks.
NetAct can manage both the network and services in a centralized manner,meaning that the operator can view all network element failures, service qualityindicators and traffic from one single screen.
The ability to collect, integrate and utilize the information about the status andperformance of all network elements and services is the cornerstone of NetAct.Fluent alarm handling, reporting capabilities as well as network optimizationfunctionality minimize the network downtime and congestion, optimize thenetwork capacity and create the basis for efficient network operations.
NetAct is a total OSS package including common network functionalities as wellas sophisticated tools for service assurance and optimization.
1.1 Global Reporter Overview
Global Reporter is the NetAct solution for long-term performance managementdata storage and reporting available in the NetAct Global Cluster. It providesaccurate information on network wide performance, usage and quality as well
as fault and configuration parameter history.
The Global Reporter allows the operators to view and analyze the networkperformance, with data coming from multiple sources. Raw data is translated tomeaningful information that is visualized in graphical and textual reports.
The solution provides both regional and national performance managementdatabases as well as reporting tools for the creation of ad-hoc and on-demandreports at regional and national levels. Performance alarms based on variousthreshold criteria support the network management in an efficient manner.
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 6/22
The Key Performance Indicators (KPIs) are the most important indicators of network performance. By producing KPI reports on a regular basis or on
demand it is possible to detect the first signs of performance degradation andprevent the development of critical network problems. KPIs on network levelcan be used, for example, for analyzing performance trends, on RNC level forlocating problems and on BTS level for troubleshooting specific BTSs. GlobalReporter provides a comprehensive set of reports based on predefined KPIs. The predefined KPIs can also be used by creating customized reports withtools.
Global Reporter is optimized with respect to scalability & performance toefficiently handle large networks & data volumes.
6 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 7/22
Release Acceptance
©Nokia Siemens Networks 7 (22)
2 Release Acceptance Product Component Release Code
NetAct TM Framework Global Reporter 4.8 CD1
Acceptance proposed by:
29.10.2008, Axel Luft
Nokia Siemens Networks
NetAct™ GR 4.8 Program Manager
Generic release accepted by:
29.10.2008, Axel Luft
Nokia Siemens Networks
NetAct™ GR 4.8 Program Manager
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 8/22
8 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 9/22
OSS 4.2 / GR Release Overview
©Nokia Siemens Networks 9 (22)
3egional Clusters. OSS4.2 Global Monitor for
.2
OSS4.x release. GR4.8 CD1 is based on OSS4.2 CD-Set 1 with SU1. The nextrelease for Global Reporter, GR4.8 CD2, is planned to happen on February 2009.
3.1
The Gl al Rfault re ctio
• Oracle 10g Database Support – Global Reporter 4.8 CD1 supports bothOracle release 9i and the upgrade to Oracle release 10g.
OSS 4.2 / GR Release Overview
OSS4.2 is a new NetAct release for RGlobal Cluster is also included in the OSS4.2. For more information about OSS4
please check OSS4.2 Release Note.Global Reporter 4.8 is developed separately and installed on top of the related
Global Reporter 4.8 CD1 Release Overview
ob eporter 4.8 CD1 release includes the following new features, beyonddu n:
• A faster GUI response time for editing reports in Reporter Builder andReporter Explorer.
• Display the Report Results using Value Based criteria where you canpresent the results in six different forms.
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 10/22
3.2 Restrictions and Limitations
The following restrictions and limitations are applicable:
The feature “Report Distribution”, as seen in the GR SAT manual, will only beavailable based on a customization request.
Nokia 3G RAN partitioning is a customized option and has to be requestedseparately.
Nokia 3G RAN Hourly / Monthly aggregation feature is a customized option and hasto be requested separately.
Oracle 10g Database upgrade is supported as a separate CD.
In NetAct there are open defects which are listed in Generic Failure Report.
3.3 Global Reporter 4.8 CD1 Release Compatibil ity
GR4.8 CD1 compatibility matrix is updated on a monthly basis. It is available forcustomers through an Account, Care Manager or Product Manager.
3.4 Fault Management and Maintenance
Change Delivery
Corrections to the GR4.8 CD1 release are delivered mainly in separate CDs. Alsopriority correction deliveries and hot fixes or other workaround solutions can bedelivered for urgent severe problems. GR4.8 CD1 CDs and priority correctiondeliveries will be published in NOLS.
Technical Note
A Technical Note (TN) is a workaround solution for the problem. If there is a knownproblem in some supported system that requires no change of physical entities(binaries, text files etc) and can be fixed by the means of configuring, a TechnicalNote can be created. Technical Notes are available in NOLS.
10 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 11/22
OSS 4.2 / GR Release Overview
©Nokia Siemens Networks 11 (22)
Generic Failure Report
The NetAct Generic Failure Report is a summary of outstanding system faultscontaining the problem description and the target correction schedule. By defaultopen critical and major (“A” and “B” class) faults at the release date (start of volumedeliveries), “A” and “B” class faults reported by customers and selective othersignificant faults are included in this report. Most of the faults related to OSS4.1upgrade performed by Nokia Siemens Networks installation engineers are excluded. Those faults will be fixed as soon as possible in the upgrade tools and documents.NetAct GFR report is updated and published in NOLS once a month.
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 12/22
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 13/22
Global Reporter 4.8 CD1 Testing
©Nokia Siemens Networks 13 (22)
4ings made.
he following table summarizes the amount of test cases.
ase test cases
Global Reporter 4.8 CD1 Testing
This chapter presents the testing results for GR4.8 CD1 including the find
T
Test Ph Number of
Correction Testing NA (*1)
Regression Testing
Feature Testing (*2)
SW Update Installation Testing NA(*3)
Total
(*1) All corrections have been tested by original NOK creator following the descriptionin STEFA fault tracking tool. No separate Test Cases have been designed for this.
(*2) The majority of the new features visible from the User Interface have been tested
(*3) Software update and installation testing has been done by system administrationteam for each iteration of the software. No own test cases are created for this.
4.1
ed is described here on a general level. In the table below,
Here an overview about the used Lab setup. All Labs have been used for testing.
by Explorative Testing techniques by an experienced Testing team. This way of testing does not have dedicated Test Cases for tracking.
Test Environment
The test environment usthe release/upgrade /update levels used in the network elements of the testenvironment are listed.
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 14/22
14 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 15/22
Global Reporter 4.8 CD1 Testing
©Nokia Siemens Networks 15 (22)
Installation / Upgrade have been tested for the following paths:
OSS4.2 CD Set 1+ GR4.8 ⇨ OSS4.2 SU1⇨ GR4.8 CD1
Oracle 10g support
The testing has been done against an Oracle 9i and Oracle 10g database.
There are no dependencies to Network Elements in this testing - instead testing is doneagainst NetAct Regional Clusters forwarding PM-Data from NEs or simulators.
Regional Cluster Release/upgrade/update level
spip / nestor OSS4.1 SU1
mango / apple / banana (fruits cluster) OSS4.2 CD-Set1
finland / sweden / norway (scandic cluster) OSS4.2 CD-Set1
juice / flupke OSS4.2
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 16/22
4.2 Test Results
4.2.1
4.2.2
Correction Testing
All individual corrections have passed sub-system testing.
All individual corrections have passed entity testing.
Regression Testing
Regression test verifies the unchanged parts of a product after parts of the producthave been changed. It is a way to ensure that the change did not affect anything elseand that there are no unexpected side effects.
The results of regression testing are presented in the following sub-sections.
General Regression and Core test cases
Test case title Status
Core: 1.0 Verifying NetAct background processes in the GC OK
Core: 1.1 Verifying the internal alarms in the GC OK
Core: 1.2 Verifying the name resolution and the DNS in the GC OK
Core: 1.3 Verifying the SSH between RC and GC OK
Core: 1.4 Verifying the Oracle alert log in the GC OK
Core: 1.5 Verifying the automatic topology replication from RC to GC OK
Core: 1.6 Verifying the LDAP referral from the GC to the RC OK
Core: 2.1 Verifying the forwarding of meas. files from the RC(s) to GC OK
Core: 2.2 Checking the trace files of cosprcmx.pl in the GC Impossible
Core: 2.3 Verifying ReportBuilder OK
Core: 2.4 Verifying ReportBrowser part of the Report Explorer OK
Core: 2.5 Verifying KP I Browsing part of the Report Explorer OK GR Reg: 1 Excel IF: export OK
GR Reg: 2 Save chart as PNG file OK
GR Reg: 3 formula creation OK
GR Reg: 4 edit/change formula OK
GR Reg: 5 create report out of formula OK
GR Reg: 6 Help buttons linked to help system OK
GR Reg: 7 Report Creation OK
GR Reg: 8 Report Editing OK
GR Reg: 9 Walk through TreeSearch OK
GR Reg: 10 Common find features OK
16 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 17/22
Global Reporter 4.8 CD1 Testing
©Nokia Siemens Networks 17 (22)
Test case title Status
GR Reg: 11 Different Report Types OK
GR Reg: 12 Show description for any fact or formula OK
GR Reg: 13 Show SQL query OK
GR Reg: 14 Edit Report Description OK
GR Reg: 15 Create URL OK
GR Reg: 16 Delete URL OK
GR Reg: 17 Create a copy of an existing report OK
GR Reg: 18 Report Scheduling and Caching OK
GR Reg: 19 Scheduling Absolute Reports OK
GR Reg: 20 Scheduled Report Icon OK
GR Reg: 21 Scheduling Parameters NOK
4.2.3 Software Update Installation Testing
The verification of the update/installation procedures and instructions has been donewithout any dedicated test cases.
All installations/ updates have been performed according to the official installationinstructions. Any findings have been corrected in either the procedure or inside thedocument.
4.3 Remaining Open Faults
Fault Severity Number of Faults
B2 1
C3 24
C4 103
D5 27
TOTAL 155
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 18/22
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 19/22
Global Reporter 4.8 CD1 Customer Documentation
©Nokia Siemens Networks 19 (22)
5 Global Reporter 4.8 CD1 Customer Documentation
The NetAct customer documentation for Global Reporter 4.8 CD1 is available:
• In NED 5.4 with the NetAct software installation
• In Adaptation Information Browser (AIB) in NetAct software installation.AIB is a new application in OSS4.2 and Global Reporter 4.8 CD1including Radio Network parameter descriptions and selectedMeasurement Database descriptions and their release changeinformation.
• In NOLS: as browseable and downloadable NED 5.4, and asdownloadable PDFs.
Detailed information about the release-specific contents of the document set can befound in the Release Information subcategory, under About this Publication in NED.
For a list of the parameters and measurements/counters available in AdaptationInformation Browser and the full content of the document set, refer to NetAct OSS4.2Release Note available fromNOLS.
In addition updates specific to Global Reporter have been made in the followingdocuments:
About this Publ ication
Release Information
Global Cluster System Impact (Global Reporter 4.8 CD1) dn70239072
Descriptions
Operating Princ iples Reporter and Performance Management Principles dn9784605
Product Principles Getting Started with Global Reporter dn70200612
Trouble Management Troubleshooting Performance Management Problems dn04186062
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 20/22
Administ rat ion
NetAct System components Administering Reporter and Performance Management dn04184349
Reference
Technical ReferenceReporter and Performance Management TechnicalReference Guide dn01768
The NED library has been updated for GR4.8 CD1 release. The next NED libraryupdate will be done for GR4.8 CD2. In addition to the documents in the NED library, online helps are available directly
from the applications Report Builder, Report Explorer and Reporter Admin Toolkit. The content of these helps is up-to-date for GR4.8 CD1.
20 (22) ©Nokia Siemens Networks
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 21/22
Delivery Description
©Nokia Siemens Networks 21 (22)
6 Delivery Description
The Global Reporter 4.8 CD1 delivery contains software and customerdocumentation available via NOLS.
Before GR4.8 CD1 installation can be started on Global Cluster, NetAct must be on
Latest INST_TOOLS depot has to be installed on HP-UX.
6.1 Delivery Media Content
NOTE: tion.
CDs need to be downloaded fromNOLS
OSS4.2 CD-Set 1 + SU1 level in all Global Cluster nodes.
The CDs are ordered separately and are not included in OSS4.2 installa
and installed according to thisdocument.
edia:
SS4.2 Global Reporter 4.8 CD1 list
Y (OSS4.1)
OSS_CD_1672 REPORTER INSTALLATION FRAMEWORK
OSS_CD_1856 T&P VERSION 2.1 COMPATIBLE WITH GR4.7
This delivery consists of the following m
O
Tier3 HP-UX:
OSS_CD_1347 THRESHOLD AND PROFILE FUNCTIONALIT
ENHANCEMENTS
OSS_CD_2104 GLOBAL REPORTER 4.8 CD1 (TIER 3)
7/29/2019 Rn Gr48cd1
http://slidepdf.com/reader/full/rn-gr48cd1 22/22
LinAs:
OSS_CD_1333 CHANGES TO SUPPORT US DAYLIGHT SAVING CHANGE(Needed for updating J ava version to 1.4.2.SR6)
OSS_CD_2103 GLOBAL REPORTER 4.8 CD1 (TIER 2)
OSS_CD_1856 T&P VERSION 2.1 COMPATIBLE WITH GR4.7
OSS_CD_2119 CUSTOMER DOCUMENTATION UPDATE FOR GLOBALREPORTER 4.8 CD1
22 (22) ©Nokia Siemens Networks