23
RYAN MORRISON PORTFOLI landscape architectural designer - 2015

RMPortfolio2015

Embed Size (px)

DESCRIPTION

Professional and academic landscape architectural work. Ryan Morrison, 2015.

Citation preview

  • RYAN MORRISON

    PORT

    FOLI

    landscape architectural designer - 2015

  • RYAN MORRISON227 ocean parkway, apt. 6h

    brooklyn, ny 11218(860) 559-6008

    [email protected]://ryanmorrisonlandscape.combachelor of science - theater

    may 2005, cum laude with honorsskidmore college, saratoga springs, ny

    new york botanical garden - summer 2010landscape design historylandscape design i - site analysis/schematic designgraphics i and ii

    2012 - parks for the people competitionaward of excellence - van alen institute and nps

    acted as a development liason between bam, a renown arts institution with a $40 million annual budget, and donors, board members, sponsors, vips managed seating for semi-annual galas and large fundraising events

    speaker: 2013 cela annual conferencea method for re-imagining national parks

    brooklyn botanic garden - summer 2012woody plant identification

    2013 - frederick bainnson scholarshiphighest-ranking student at the ssa, ccny

    compiled research and precedent studies, drafted cad linework, built 3d rhino models, created conceptual plans, and rendered views on multiple projects, including: calgary central square (calgary, al), 400 park ave south (new york, ny), troy riverfront (troy, ny), and suny purchase (purchase, ny)

    developed schematic plans, rendered plans and views, and assembled public realm landscape guidelines for client submittal for the public space master plan of pluit city islands 1 and 2 (jakarta, indonesia) compiled research and precedent studies, rendered illustrative diagrams, plans and perspective views and assembled client presentations for the competition to redevelop ellinikon airport (athens, greece)

    design internmartha schwartz partners ltd.

    london, uk 2013

    design intern w architecture and landscape architecture

    new york, ny 2012

    patron services coordinator brooklyn academy of music

    brooklyn, ny 2008-2011

    pratt institute, brooklyn, ny - fall 2006b.arch 1st year studio

    drafting: autocad, manual draftingrepresentation: photoshop, illustrator, v ray, maxwell render, hand-sketching/rendering3d modeling: rhino3d, 3ds max, model-makingpresentation: indesign, after effects, prezi, powerpoint, arcgis

    master of landscape architecturemay 2014ssa, city college of new york, ny

    DEGREES

    FURTHER EDUCATION

    RECOGNITION

    PROFICIENT SOFTWARE/SKILLS

    EMPLOYMENT

    2014 - asla ny student honor award

    2015 - national asla student awardas student editor for plot journal

    collaborated with the project team to develop a master plan for the nanjing qinglong lake project (nanjing, china), and helped guide the visual style of the final hand-rendered master plan spearheaded the schematic design process for nanjing qinglong lakes lakeside park through a series of precedents, analysis, and design sketches led the design effort for the jinjiang wang cuo projects (jinjiang, china) signature public space, the crescent plaza, contributing precedents, sketches, an overall grading scheme, paving plan, and planting strategy, and all associated details (under construction) directed the design of the nanjing golf clubhouse motor court, courtyard, and rear terrace from schematic through design development

    landscape architectural designerrobert a.m. stern architects llp

    new york, ny2014-current

  • ACADEMIC WORK

    PROFESSIONAL WORK

    CLIPPY - PAPERCLIPS . 2011

    RAMSAnanjing qinglong lake master plan nanjing qinglong lake phase I SD to DD - lakeside park nanjing qinglong lake phase I DD - jade lakejinjiang wang cuo DD - crescent plaza

    MSPpark 1waterfront plaza

    THE FORGOTTEN REACHregional plansmodelsstaging, phasingsite plan, rendered views

    NEW POINT ROADanalysis, model strategic master plan site plan, sections rendered zoom plans, viewsconstruction documents

    RESORT TO RESORTresearch, matrix analysis kit of partssections

    1.11

    2

    1.5 1.6

    2.1

    2.2

    2.3

    1.2 1.3 1.4

  • NANJING QINGLONG LAKE MASTER PLANryan morrison for robert a.m. stern architects, 2014

    1.1

    1.1 NANJING QINGLONG LAKE MASTER PLAN . robert a.m. stern architects . ryan morrison . 2014

    STUDY MODEL

    vegetation

    slope

    ridgeline

    watershed

    topography

    circulation

  • 1.1 NANJING QINGLONG LAKE MASTER PLAN . robert a.m. stern architects . ryan morrison . 2014

    RENDERED MASTER PLAN

    circulation

    terraced steps

    bridge

    meadow

    waters edge

    mews

    pergola

  • NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L104.1

    L104.1 Enlarged Site Plan -Lakeside Park Wedding Garden

    ENLARGED SITE PLAN - LAKESIDEPARK WEDDING GARDEN

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - LAKESIDE PARK WEDDING GARDEN1:200

    CRESCENT LAWN

    LAKESIDE D

    RIVE

    MATCHLINE, SEE L104

    MATCHLINE, SEE L105

    BENCH TYP.

    RETAINING WALL TYP.

    PERGOLA

    RETAINING WALL, TYP.

    RETAINING WALL, TYP.

    MA

    TCH

    LIN

    E, S

    EE

    L10

    4

    BENCH, TYP.

    MATCHLINE, SEE L104

    MATCHLINE, SEE L105

    3L302

    4L302

    1L302

    VIEW TO LAKE THROUGH EXISTINGTREES (SELECTIVELY PRUNED)

    PAVED WALK

    GRAVEL WALK

    GRAVEL WALK

    DN

    DN

    DN

    DND

    N

    SIDEWALK, TYP.

    PAVED WALK

    BENCH, TYP.

    MA

    TCH

    LIN

    E, S

    EE

    L10

    4

    MA

    TCH

    LIN

    E, S

    EE

    L10

    3

    MA

    TCH

    LIN

    E, S

    EE

    L10

    3

    33.30B.W.

    32.00T.W.

    WALKWEDDING GARDEN

    35.00

    LAWNPLAZA (TBD)

    36.00

    35.50

    28.0

    35.50T.W.

    PLANTED BUFFER

    VARI

    ES

    34.75 35.0035.25

    35.50T.W.

    34.50

    35.50T.W.

    33.50B.W.

    35.25

    WALK &SEATING

    WALK &SEATINGLAWNPRESERVED VEGETATION PRESERVED VEGETATION

    WALLWALL

    34.50

    WALK AND SEATING WEDDING GARDEN

    35.0035.60T.W.

    33.50B.W.

    35.60T.W.

    33.50B.W.

    33.50

    33.50

    PRESERVED VEGETATION PLANTING PLANTING WALK AND SEATING PRESERVED VEGETATION

    PLANTING WALK PLANTING PERGOLA PLANTING WALK PLANTING

    WALLWALL

    7.0m ROAD WALK

    32.00T.W.

    32.50

    26.50

    WALK & SEATING

    28.027.00T.W.

    +22.00WATERLEVELPRESERVED VEGETATION AND RESTORED MEADOWOPEN VIEW CORRIDOR (MEADOW) WITH PRESERVED PINE FOREST BEYONDMEADOW

    WALL

    WALL

    32.00T.W.

    L302

    L302 Site Sections andElevations - Lakeside Park

    SITE SECTIONS AND ELEVATIONS -LAKESIDE PARK

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    1 100% SCHEMATIC DESIGN 01/16/2015

    1 CENTRAL AXIS WEST SECTION1:100

    3 ELLIPTICAL LAWN SECTION1:100

    4 WEDDING GARDEN SECTION1:100

    MA

    TCH

    LIN

    E, S

    EE

    L30

    2/2

    MA

    TCH

    LIN

    E, S

    EE

    L30

    2/1

    2 CENTRAL AXIS EAST SECTION1:100

    1-2L302

    3L302

    4L302

    LAKESIDE DRIVE

    NANJING QINGLONG LAKE PHASE I SD TO DD - LAKESIDE PARKryan morrison for robert a.m. stern architects, 2014-2015

    1.2

    DESIGN PROCESS

  • 26.0WATER LEVEL

    EXISTING TREE

    (TO BE PRESERVED)

    HEDGE (PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    TREE MASSING(PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    NOTES:

    1. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTEDPENDING CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.

    2. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.

    3. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THESHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    GROUNDCOVER,PERENNIAL, AND SHRUBPLANTING

    TREE MASSING(EXISTING TO BEPRESERVED)

    GOLF AREA - BY OTHERS

    ENTRANCE ROAD

    EXIT ROAD

    L201

    L201 Planting Plan - Jade LakeNeighborhood

    PLANTING PLAN - JADE LAKENEIGHBORHOOD

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 PLANTING PLAN - JADE LAKE NEIGHBORHOOD1:750

    MA

    TCH

    LINE

    , SE

    E L204

    JADE LAKE

    JADE LAKE

    WATERPAVILION

    NORTHPAVILION

    EXISTING PEDESTRIAN BRIDG

    E

    ROAD

    ROAD

    WATERFRONTPLAZA

    PROPO

    SED VEH

    ICU

    LAR BRIDG

    E

    MA

    TCH

    LINE

    , SE

    E L202

    MATCHLINE, SEE L203

    38

    36

    37

    35

    2%

    35

    3637

    34333231

    5.7%

    5.7%

    1%

    17%

    39.00 TW38.00 BW

    38.08 TW38.00 BW

    35.97

    12%

    37.60

    38.00

    (33)(36)

    (35)

    (34)

    (33)

    (32)

    (31)

    (30)(31)

    (32)

    (33)

    (29)(30)

    (31)(32)

    (33)

    (34)

    (35)

    (36)

    (36)

    (35)

    (34)

    (33)

    (32)

    (32)

    (31)

    (33)

    (30)

    (29)

    (33)

    (32)

    (31)

    (30)

    (29)

    (28)

    (28)

    (29)

    (30)

    (27)

    (31)

    (31)

    (32)

    (33)

    (34)

    (31)(32)

    (33)

    (34)

    (35)

    (30)(29)

    (28)

    (35)

    (34)

    (33)

    (32)

    (31)

    (31)

    (32)

    (33)

    (34)

    (35)(36)

    (37)

    (37)

    (38)

    (38)

    (36)

    (34)

    (35)

    (36)

    (37)

    (38)

    (39)

    (31)

    (30)

    (30)

    (31)(32)

    (32)

    (31)

    (33)

    (34)

    (35)

    (30)

    (29)

    (28)

    (35)

    (34)

    (33)

    (32)

    (36)(37)

    (34)

    (34)

    (28)

    (29)(30)(31)(32)(33)

    (27)

    (30)

    (29)

    (31)

    (32)

    (33)

    (28)

    (27)

    (31)

    (31)

    (32)

    (33)

    (31)(30)

    (37)

    (36)

    (33)

    (34)

    (35)

    (33)

    (32)

    (31)

    (30)

    (29)

    (35)

    (34)

    (33)

    (32)

    (32)(31)

    (30)

    (29)(28)

    (27)(26)(25)

    (32)(31)

    (30)(29)

    (31)

    (32)

    (33)

    (34)

    (35)

    (36)

    (30)

    (29)

    (27)

    (30)(31)

    (29)

    (28)(27)

    (28)

    (29)

    (31)

    (30)

    (28)

    (29)

    (30)

    (31)

    (27)

    (32)

    (28)

    (27)

    (29)

    (30)

    (31)

    (31)

    (26)

    (30)

    (29)

    (28)(27)

    (27)

    (26)

    26.30 BW

    26.75TW

    27.6

    26.35 TS26.20 BS

    26.25

    26.15

    29.5 FFE

    28.0

    27.5

    28.5 FFE

    4.5%

    15%

    26.31 BW

    6%

    26.15

    2.3%

    28.25 TS

    28.75 TS

    29.25 TS

    FFE: 34.0

    30.00 BW

    5%

    5%

    27.75 TS

    27.25 BS

    12%

    FFE: 34.5

    FFE: 34.5

    FFE: 34.0FFE: 33.0

    FFE: 34.0

    FFE: 34.5

    FFE: 34.0

    FFE: 34.0FFE: 34.0

    FFE: 33.5FFE: 33.5

    FFE: 33.5FFE: 33.5

    FFE: 33.5

    FFE: 34.0FFE: 34.0FFE: 34.0

    FFE: 34.0FFE: 34.0

    28.0

    28.0

    28.5

    28.0

    28.028.0

    28.0

    28.5

    28.5

    28.5

    27.5

    FFE: 33.5

    FFE: 33.0

    27.527.5

    27.5 27.527.0

    27.0

    27.0

    27.0

    27.527.5

    27.527.5

    27.527.5

    28.028.0

    28.028.0

    28.028.0

    28.5

    28.5

    FFE: 34.0FFE: 34.5

    FFE: 34.5FFE: 34.5

    FFE: 34.5FFE: 35.0 FFE: 35.0

    FFE: 35.5FFE: 35.5

    FFE: 35.5FFE: 35.5

    FFE: 35.0

    FFE: 34.5FFE: 34.0

    FFE: 34.0FFE: 34.0

    FFE: 34.0

    FFE: 33.5

    FFE: 33.5

    28.528.0 28.5 28.5 28.529.0

    29.0 29.529.5

    29.5 29.529.0

    28.5

    28.0

    27.5

    27.5

    FFE: 33.5

    FFE: 33.5

    FFE: 35.0FFE: 35.0

    FFE: 35.5FFE: 35.5

    FFE: 35.5FFE: 35.5

    FFE: 35.0FFE: 35.0

    FFE: 35.0FFE: 35.0

    FFE: 34.5FFE: 34.5

    FFE: 34.5FFE: 34.5

    FFE: 34.0FFE: 34.0

    FFE: 33.5

    FFE: 33.5

    27.5

    27.5

    29.029.0

    29.529.529.529.5

    29.029.029.029.028.5

    28.528.528.5

    28.028.027.527.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5FFE: 31.5FFE: 31.5

    FFE: 31.5FFE: 31.5

    FFE: 31.5FFE: 31.5

    FFE: 31.5FFE: 31.5

    FFE: 31.5 FFE: 31.5

    FFE: 31.5FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5

    FFE: 31.5FFE: 32.0

    FFE: 32.5

    FFE: 34.0

    FFE: 36.0

    FFE: 36.0

    FFE: 36.5

    FFE: 36.5

    FFE: 36.5

    FFE: 36.5

    FFE: 36.0

    FFE: 36.0

    FFE: 36.5

    FFE: 36.5

    FFE: 35.5

    FFE: 35.5FFE: 35.5

    FFE: 35.5

    25.5 25.5 25.5 25.5

    25.5

    25.5

    25.5

    25.5

    25.5

    25.5

    25.5

    25.5

    25.525.5

    25.525.5

    25.525.5

    25.5

    25.5

    25.525.5

    25.5

    25.5

    26.0

    26.5

    28.0

    30.0

    30.030.0

    30.5

    30.530.5

    30.5

    30.0

    30.0

    29.5

    29.529.5

    29.5

    2%

    8-10%

    FFE: 33.5

    FFE: 34.0FFE: 34.0

    FFE: 34.0FFE: 33.5

    FFE: 33.5FFE: 33.5

    FFE: 33.5

    FFE: 34.0FFE: 34.0

    FFE: 34.0

    37.0

    28.028.0

    28.0

    28.028.0

    28.0

    37.0

    36.5

    36.035.5

    35.034.5

    34.033.5

    33.0

    32.0

    28.0WATER LEVEL

    TW 29.0

    TW 29.0

    28.5

    TW 31.0BS 28.75

    28.5

    33.0

    35.0

    8-10%

    TW 31.0

    TW 29.0

    TW 29.0

    28.5UNDERPASS

    26.0WATER LEVEL

    28.5

    28.5UNDERPASS

    32.532.0

    31.531.0

    30.5

    30.0

    29.5

    29.0

    28.5

    36.5

    36.035.5

    35.034.5

    34.033.533.0

    32.5

    37.5

    37.5

    32.031.531.0

    30.530.029.529.0

    28.5UNDERPASS

    28.5UNDERPASS

    27.8

    28.027.8

    26.50 TS

    26.0WATER LEVEL

    28.0

    28.5

    29.0

    29.5

    30.0

    30.5

    31.0

    31.5

    32.0

    32.5

    33.0

    33.0

    32.5

    32.0

    31.5

    31.0

    33.0

    32.0

    32.0

    31.5

    31.0

    31.5

    31.5 31.030.5

    30.0

    29.0

    31.5

    31.0

    30.5

    30.0

    29.5

    29.0

    28.5

    35.5

    35.0

    34.5

    FFE: 37.5FFE: 37.5

    FFE: 37.5

    31.531.531.5

    FFE: 37.0

    31.0

    FFE: 35.5FFE: 35.5

    FFE: 35.5FFE: 35.5

    FFE: 36.0

    29.5 29.5 29.5 29.5 30.0

    FFE: 34.5

    FFE: 33.5

    27.5

    FFE: 34.0FFE: 34.0FFE: 33.5

    27.5 28.028.0

    FFE: 34.5FFE: 34.5

    FFE: 34.5FFE: 34.5

    FFE: 34.528.528.5

    28.528.5 28.5

    FFE: 34.5FFE: 34.5

    FFE: 34.5FFE: 34.5

    FFE: 34.5FFE: 34.5

    28.5 28.5 28.528.5 28.5 28.5

    FFE: 34.5

    28.5

    28.528.5

    FFE: 34.5

    FFE: 34.5

    FFE: 31.5FFE: 31.5

    FFE: 32.5

    FFE: 33.5

    27.526.5 26.5

    25.5

    25.5

    28.75

    33.75 TW

    30.031.032.0

    27.25

    27.00

    36.50

    HP (37)

    FFE: 37.0

    FFE: 37.0

    FFE: 34.5

    FFE: 34.5

    FFE: 34.5

    FFE: 34.5FFE: 34.5

    27.5

    28.0

    28.0

    28.0

    FFE: 33.5FFE: 33.5

    27.5

    27.5

    FFE: 34.5

    FFE: 34.5

    28.5

    28.5

    FFE: 34.0FFE: 34.0

    FFE: 34.0FFE: 34.0

    FFE: 34.0

    28.028.0

    28.0

    28.0

    28.0

    FFE: 31.5

    FFE: 31.525.5

    25.5

    FFE: 34.0FFE: 34.0

    FFE: 34.0 FFE: 34.0

    28.0

    28.028.0

    28.0 FFE: 35.5

    FFE: 34.0 28.0

    29.5

    FFE: 36.5

    FFE: 36.5

    30.5

    FFE: 36.5

    FFE: 36.530.5

    30.5

    FFE: 36.5

    FFE: 36.5

    FFE: 36.5

    30.5

    30.5

    30.5

    FFE: 37.0FFE: 37.0

    FFE: 37.0FFE: 37.0 31.031.0

    31.031.0

    31.0

    FFE: 37.0FFE: 37.0

    31.0

    31.0

    31.0

    FFE: 36.0

    30.0

    FFE: 34.5

    28.528.5

    FFE: 34.0FFE: 34.0

    FFE: 34.0FFE: 34.0

    FFE: 34.0

    28.0 28.0 28.028.0 28.0

    28.5

    28.5

    28.5

    28.5

    28.5

    FFE: 33.5

    27.5

    33.00 TW

    26.0WATER LEVEL

    31.75 BW33.75 TW

    33.75 TW 31.25 BW

    33.0

    32.5

    32.5

    32.0

    32.0

    32.5

    33.0

    33.5

    34.0

    34.5

    35.0

    35.5

    33.5

    33.5

    33.0

    33.0

    33.5

    34.0

    34.5

    35.0

    35.5

    36.0

    36.5

    36.0

    36.5

    37.0

    37.0

    36.5

    36.0

    35.5

    35.0

    34.5

    34.033.5

    33.0

    32.5

    33.0

    33.5

    34.0

    34.5

    35.0

    35.0

    34.53

    4.033

    .5

    33.0

    32.5

    33.0

    32.5

    33.0

    33.5

    34.0

    34.0

    33.5

    33.0

    32.5

    32.0

    31.5

    31.0

    31.0

    31.5

    32.0 29.0

    30.0

    31.0

    32.0

    33.0

    28.5

    29.030.031.0

    32.0

    32.03

    1.0

    30.0

    31.0

    32.0

    30.5

    31.5

    32.5

    32.031.0

    30.029.0

    29.5

    29.0

    28.5

    28.0

    27.0

    27.5

    27.0 TW28.5

    28.027.5

    27.0

    27.5

    27.0

    26.5

    26.5

    26.5

    27.0

    27.5

    26.25

    26.5

    26.5

    26.5

    27.0

    27.5

    28.0

    28.5

    29.0

    26.0

    26.5

    26.5

    26.25

    30.0

    29.529.0

    28.5

    28.0

    27.5

    27.0

    26.5

    30.5

    30.5

    30.0

    29.5

    29.0

    27.5

    28.0

    28.5

    29.0

    27.0

    27.0

    27.5

    28.0

    28.5

    28.0

    27.5

    27.5

    28.0

    29.0

    29.5

    30.0

    30.5

    30.0

    30.5

    30.0

    31.0 3

    1.5

    27.0

    29.030.0

    31.0

    30.0

    29.0

    28.50

    28.5

    29.0

    29.529.25 BW

    30.0

    30.5

    31.0

    31.5

    30.5

    30.0

    29.5

    29.5

    30.0

    30.531.0

    30.5

    30.0

    29.5

    29.0

    28.5

    30.0

    30.5

    31.0

    31.5

    31.031.5

    31.5

    35.5

    TS 35.5

    BS 35.0

    34.0

    34.5

    35.0

    33.0

    32.0

    31.0

    33.0 33.5 34.0

    34.0 34.0

    34.0

    33.5

    33.0

    32.5 32

    .0

    31.5

    31.0

    30.5

    30.0

    30.5

    29.5

    30.0

    30.5

    31.0

    31.5

    32.0

    32.5

    33.0

    33.0

    33.5

    35.0

    33.5

    33.5

    34.0

    35.5

    36.0

    36.0

    35.5

    35.0

    34.5

    34.0

    33.5

    33.0

    32.5

    32.5

    32.0

    31.5

    31.0

    31.25

    31.0

    31.0

    32.0

    33.0

    34.0

    35.0

    8%

    5%

    8%

    31.5

    32.0

    32.5

    33.0

    33.5

    34.0

    34.5

    35.0

    35.5

    36.0

    36.5

    37.0

    37.0

    37.0

    37.0

    37.0

    36.0

    35.5

    36.5

    36.5

    36.0

    35.5

    35.034.5

    34.0

    33.5

    34.0

    36.5

    36.0

    34.5

    33.5

    32.5

    31.5

    30.5

    28.5

    30.0

    LIMIT OF WORK

    MATCHLINE

    EXISTING CONTOUR - MAJOR(0)

    (0)

    SPOT ELEVATION

    SLOPE PERCENTAGE & DIRECTION

    ABBREVIATIONSHIGH POINTLOW POINTTOP OF CURBBOTTOM OF CURBTOP OF WALLBOTTOM OF WALL

    TOP OF STAIRBOTTOM OF STAIRTOP OF RAMPBOTTOM OF RAMP

    HPLPTCBCTWBW

    TSBSTRBR

    00.0%

    HIGH POINT SWALELOW POINT SWALE

    HPSLPSRIM RIM OF UTILITY STRUCTURE

    00.00

    EXISTING CONTOUR - MINOR

    RETAINING WALL

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    PROPOSED CONTOUR - MAJOR0

    0PROPOSED CONTOUR - MINOR

    GOLF AREA - BY OTHERS

    ENTRANCE ROAD

    EXIT ROAD

    L131

    L131 Grading Plan - Jade LakeNeighborhood

    GRADING PLAN - JADE LAKENEIGHBORHOOD

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 GRADING PLAN - JADE LAKE NEIGHBORHOOD1:750

    JADE LAKE

    JADE LAKE

    WATERPAVILION

    NORTHPAVILION

    EXISTING PEDESTRIAN BRIDG

    E

    WATERFRONTPLAZA

    PROPO

    SED VEH

    ICU

    LAR BRIDG

    E

    MA

    TCH

    LINE

    , SE

    E L134

    MA

    TCH

    LINE

    , SE

    E L132

    MATCHLINE, SEE L133

    ROAD

    ROAD

    26.0WATER LEVEL

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.6

    L101.6 Enlarged Site Plan - JadeLake South End

    ENLARGED SITE PLAN - JADE LAKESOUTH END

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - JADE LAKE SOUTH END1:200

    JADE LAKE

    MATCHLINE, SEE L101.5 MATCHLINE, SEE L101.3MATCHLINE, SEE L101.5

    PROPERTY LINE HEDGE, TYP.

    SEATING AREA

    SEATING AREA

    GRAVEL WALK

    BENCHES, TYP.

    PAVED WALK

    BENCHES, TYP.

    26.0WATER LEVEL

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.5

    L101.5 Enlarged Site Plan - JadeLake Water Pavilion

    ENLARGED SITE PLAN - JADE LAKEWATER PAVILION

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - JADE LAKE WATER PAVILION1:200

    JADE LAKE

    MATCHLINE, SEE L101.4

    MA

    TCH

    LINE

    , SE

    E L101.3

    MA

    TCH

    LINE

    , SE

    E L101.3

    MATCHLINE, SEE L101.6

    3L301

    BENCHES, TYP.

    WATERPAVILION

    ALLEE

    BOARDWALK

    HEDGE AT PROPERTY LINE, TYP.

    RETAINING WALL, TYP.

    PAVED WALK, TYP.

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.4

    L101.4 Enlarged Site Plan - JadeLake North Pavilion

    ENLARGED SITE PLAN - JADE LAKENORTH PAVILION

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - JADE LAKE NORTH PAVILION1:200

    JADE LAKE

    MATCHLINE, SEE L101.5 MATCHLINE, SEE L101.3

    PERGOLA

    HEDGE AT PROPERTY LINE, TYP.

    ENTRY ROAD

    5L301

    RETAINING WALL, TYP.

    PAVED WALK, TYP.

    BENCH

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.1

    L101.1 Enlarged Site Plan - JadeLake Mews

    ENLARGED SITE PLAN - JADE LAKEMEWS

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - JADE LAKE MEWS1:200

    JADE LAKE

    MATCHLINE

    , SEE L101.2

    MATCHLINE

    , SEE L101.2

    GRAVEL WALK, TYP.

    STEPS TO WATER

    FOUNTAIN JETS FLUSH W/ PAVING

    BENCHES (TYP.)

    EXISTING ISLAND

    SEAT WALL, TYP.

    PAVED WALK, TYP.

    MA

    TCH

    LIN

    E, S

    EE

    L10

    1.3

    MA

    TCH

    LIN

    E, S

    EE

    L10

    1.3

    2L301

    DN

    DN

    DN

    EXISTING PEDESTRIAN BRIDGE

    MEWS

    SIDEWALK, TYP.

    ROAD, TYP.

    WATERFRONT PLAZA

    DN

    RAMP DOWN

    SEE SHEET 101.3

    26.0WATER LEVEL

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.3

    L101.3 Enlarged Site Plan - JadeLake Bridge and Peninsula

    ENLARGED SITE PLAN - JADE LAKEBRIDGE AND PENINSULA

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    1 ENLARGED SITE PLAN - JADE LAKE BRIDGE AND PENINSULA1:200

    JADE LAKE

    JADE LAKE

    MA

    TCH

    LIN

    E, S

    EE

    L10

    1.5

    MA

    TCH

    LIN

    E, S

    EE

    L10

    1.5

    MA

    TCH

    LINE

    , SE

    E L101.2

    MA

    TCH

    LINE

    , SE

    E L101.1

    MATCHLINE, SEE L101.4

    MATCHLINE, SEE L101.6

    4L30

    1

    EXISTINGPEDESTRIANBRIDGE

    PROPOSEDVEHICULARBRIDGE

    SIDEWALK, TYP.

    PEDESTRIANUNDERPASS(BELOW)

    PEDESTRIANUNDERPASS(BELOW)

    PAVED WALK, TYP.

    DN DN DN

    TERRACED GARDEN

    PAVED WALK, TYP.

    RETAINING WALL, TYP.

    RAMP DOWN

    RAM

    P D

    OW

    N

    PAVED WALK, TYP.

    GRAVEL WALK, TYP.

    PAVED WALK, TYP.

    TERRACED SEAT WALL, TYP.

    BOULDER WALL

    NOTES:

    1. SEE L100.1 - OVERALL PATH SYSTEM FOR PEDESTRIAN CONNECTIONS.2. STREETSCAPE DESIGN TO BE FURTHER DEVELOPED AND DOCUMENTED PENDING

    CLIENT'S APPROVAL OF RESIDENTIAL UNIT AND PARKING LAYOUT.3. SEE L200 SERIES FOR FURTHER PLANTING INFORMATION.4. EXISTING TREE AND PLANTING SURVEY INFORMATION PROVIDED BY THE

    SHENZHEN LEGEND REAL PROPERTY CO. LTD. ON APRIL 22, 2014.

    HEDGE (PROPOSED)

    LIMIT OF WORK

    MATCHLINE

    TREE MASSING(EXISTING TO BE PRESERVED)

    TREE MASSING (PROPOSED)

    SHRUB, GROUNDCOVER, ANDPERENNIAL MASSING(PROPOSED)

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    EXISTING TREE(TO BE PRESERVED)

    AREA TO BE DESIGNED -ADDITIONAL PROGRAMINFORMATION REQUIREDFROM CLIENT

    L101.2

    L101.2 Enlarged Site Plan - JadeLake Promenade

    ENLARGED SITE PLAN - JADE LAKEPROMENADE

    KEY PLAN

    DATEISSUENO.

    A14009PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    REAL PROPERTY CONSULTANT CO. LTD.

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    NANJING QINGLONG LAKE

    Copyright 2015 Robert A.M. Stern Architects LLP

    TEL 0755-82670398FAX 0755-82670399

    PHASE I:

    NANJING, CHINA

    LEVEL 5, JUNO TOWER, #1001, AIGUO ROAD, LUOHU DISTRICT, SHENZHEN 518003

    SHENZHEN LEGEND

    NOT FORCONSTRUCTION

    LEGEND / NOTES

    MASTER PLAN

    N

    RU

    I ZE RO

    AD

    L104

    L105

    L101

    1 100% SCHEMATIC DESIGN 01/16/2015

    L102

    L103

    PHASE II

    EXHIBITION AREA

    JADE LAKE

    1L301

    6L301

    SEATINGAREA

    BENCHES, TYP.

    JADE LAKE

    MA

    TCH

    LIN

    E, S

    EE

    L10

    1.3

    MATCHLINE

    , SEE L101.4

    MATCHLINE

    , SEE L101.4

    GRAVEL WALK, TYP.

    GRAVEL WALK, TYP.

    SIDEWALK, TYP.

    ROAD, TYP.

    PAVED WALK, TYP.

    PAVED WALK, TYP.

    DN

    DN

    DN

    DN

    DN

    1 ENLARGED SITE PLAN - JADE LAKE PROMENADE1:200

    NANJING QINGLONG LAKE PHASE I DD - JADE LAKEryan morrison for robert a.m. stern architects, 2015

    1.3

    PLANTING PLAN - JADE LAKE NEIGHBORHOOD

    GRADING PLAN - JADE LAKE NEIGHBORHOOD

    ENLARGED SITE PLAN - PROMENADE

    ENLARGED SITE PLAN - WATER PAVILION ENLARGED SITE PLAN - PENINSULA

    ENLARGED SITE PLAN - SOUTH END ENLARGED SITE PLAN - MEWS

    ENLARGED SITE PLAN - NORTH PAVILION

  • CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    MATCHLINE

    CENTER LINE

    UNIT ENTRANCE

    VIEW DIRECTION

    LIMIT OF WORK

    DROP-OFF

    DROP-OFF

    L101

    L101 SITE PLAN - PLAZA

    SITE PLAN - PLAZA

    2015

    1 SITE PLAN - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 SITE PLAN - PLAZA WEST1:200

    MATCHLINE L102

    MATCHLINE L103

    MA

    TCH

    LIN

    E L

    101

    - 2

    MA

    TCH

    LIN

    E L

    101

    - 1

    MATCHLINE L103

    1+2

    L300

    3L300

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    FFE: 9.20

    09.20 TS

    09.20 TS

    8.0%

    8.0%9.00

    9.00

    8.50

    8.50

    09.50

    09.20

    09.20 TR

    09.20 TR

    09.96 BF

    9.25

    1%

    1%

    1%

    1%

    TC 8.95BC 8.80

    08.40

    08.40

    08.40

    08.00

    08.40

    8.40

    HP 08.00

    1.3

    %

    1.3

    %

    2.1

    %

    0.4 %

    08.50 BR

    08.50 BR

    TC 07.40BC 07.25

    1.0%

    3.3

    %

    3.3

    %

    08.50

    08.50

    08.30 TW

    07.85 BW

    1.4

    %

    07.50 TW07.25 BW

    07.75 TW07.25 BW

    1.6

    %

    08.10

    08.40

    08.40

    08.80 TS08.50 BS

    08.50 BS08.80 TS

    0.4 %

    0.4 %

    8.00

    7.75

    2.0

    %

    2.0

    %

    07.868.00

    8.40

    TC 07.75

    TC 06.98

    8.25

    3.0

    %

    8.25

    1%

    8.75

    8.75

    8.00

    7.75

    8.25

    1.6

    %

    TW 9.20BW 9.00

    07.75 TW07.25 BW

    07.75 TW07.25 BW

    7.75

    1.6

    %

    9.25

    1%

    09.96 BF

    09.96 BF

    09.96 BF

    09.96 BF

    10.26 WATER LEVEL

    1.6 %

    07.50 TW07.25 BW

    5.0

    %

    8.40

    1.0%

    07.07 BS

    3.0

    %

    2.0

    %

    10.21 TF

    10.21 TF

    10.21 TF

    10.21 TF

    9.50

    FFE: 09.20

    10.21 TF

    10.21 TF

    FFE: 08.40

    FFE: 08.40

    07.50 TS

    7.50

    BW 07.25

    07.36 BS

    07.61 TS

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    FFE: 9.20

    09.20 TS

    09.20 TS

    8.0%

    8.0%9.00

    9.00

    8.50

    8.50

    09.50

    09.20

    09.20 TR

    09.20 TR

    9.25

    1%

    1%

    TC 8.95BC 8.80

    08.40

    08.40

    08.40

    08.00

    08.40

    8.40

    HP 08.00

    1.3

    %

    1.3

    %

    2.1

    %

    0.4 %

    08.50 BR

    08.50 BR

    TC 07.40BC 07.25

    1.0%

    3.3

    %

    3.3

    %

    08.50

    08.50

    08.30 TW

    07.85 BW

    1.4

    %

    07.50 TW07.25 BW

    07.75 TW07.25 BW

    1.6

    %

    08.10

    08.40

    08.40

    08.80 TS08.50 BS

    08.50 BS08.80 TS

    0.4 %

    0.4 %

    8.00

    7.75

    2.0

    %

    2.0

    %

    07.868.00

    8.40

    TC 07.75

    TC 06.98

    8.25

    3.0

    %

    8.25

    1%

    8.75

    8.75

    8.00

    7.75

    8.25

    1.6

    %

    TW 9.20BW 9.00

    07.75 TW07.25 BW

    07.75 TW07.25 BW

    7.75

    1.6

    %

    1%

    09.96 BF

    09.96 BF

    09.96 BF

    09.96 BF

    10.26 WATER LEVEL

    1.6 %

    07.50 TW07.25 BW

    5.0

    %

    8.40

    1.0%

    07.07 BS

    3.0

    %

    2.0

    %

    10.21 TF

    10.21 TF

    10.21 TF

    9.50

    FFE: 09.20

    10.21 TF

    FFE: 08.40

    FFE: 08.40

    07.50 TS

    7.50

    BW 07.25

    07.36 BS

    07.61 TS

    MATCHLINE

    PROPOSED CONTOUR - MAJOR 0

    SPOT ELEVATION

    SLOPE PERCENTAGE & DIRECTION

    ABBREVIATIONS

    HIGH POINTLOW POINTTOP OF CURBBOTTOM OF CURBTOP OF WALLBOTTOM OF WALL

    TOP OF STAIRBOTTOM OF STAIRTOP OF RAMPBOTTOM OF RAMP

    HPLPTCBCTWBW

    TSBSTRBR

    HIGH POINT SWALELOW POINT SWALE

    HPSLPS

    PROPOSED CONTOUR - MINOR 0

    RIDGE OR SWALE LOCATION

    0.00

    0.00

    NOTE:PROPOSED CONTOURS AND SPOT ELEVATION REFLECT RAMSA'S DESIGN INTENT FORFINAL BUILD-OUT. CIVIL ENGINEER SHALL ADJUST ADJACENT TEMPORARYCONDITIONS TO ACCOMMODATE THIS DESIGN.

    TOP OF FOUNTAINTF BOTTOM OF FOUNTAINTB

    LIMIT OF WORK

    DROP-OFF

    TC 8.65BC 8.50

    TC 8.35BC 8.20

    07.75 TW07.25 BW

    0.4 %

    07.86

    8.40

    8.50

    TC 07.75

    8.25

    8.00

    8.25

    8.25

    2.0

    %

    1.6

    %

    1.4%

    8.40

    TC 07.88

    DROP-OFF

    TC 8.65BC 8.50

    TC 8.35BC 8.20

    07.75 TW07.25 BW

    0.4 %

    07.86

    8.40

    8.50

    TC 07.75

    8.25

    8.00

    8.25

    8.25

    2.0

    %

    1.6

    %

    1.4%

    8.40

    TC 07.88

    L131

    L131 GRADING PLAN - PLAZA

    GRADING PLAN - PLAZA

    2015

    1 GRADING PLAN - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 GRADING PLAN - PLAZA WEST1:200

    MATCHLINE L132

    MATCHLINE L133

    MA

    TCH

    LIN

    E L

    131

    - 2

    MA

    TCH

    LIN

    E l1

    31 -

    1

    MATCHLINE L133

    P

    P

    P

    P

    A

    A

    A

    A

    A

    P

    ST

    ST

    S

    S

    S

    U

    U

    U

    U

    U

    U

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    P

    P

    P

    P

    A

    A

    A

    A

    A

    ST

    ST

    S

    S

    S

    U

    U

    U

    U

    U

    U

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    POLE LIGHTSEE L404, DTL 3

    UPLIGHTSEE L404, DTL 2

    BOLLARD LIGHTSEE L404, DTL 1

    STEP LIGHTSEE L420, DTL 4

    NOTES:

    1. ALL PROPOSED SITE LIGHTING SHALL BE SHIELDED OR ADJUSTED AS NEEDEDTO PREVENT OFF-SITE GLARE.

    2. SEE ARCH DWGS FOR PERGOLA LIGHTING

    P

    B

    U

    S

    MATCHLINE

    SEE ARCHITECTUREDRAWINGS FORLIGHTING DETAILS

    A

    LED STRIP LIGHTSEE L420, DTL 5

    ST

    STONE BENCHSEE L420, DTL 7

    EXHIBITION AREA BENCHSEE L420, DTL 6

    E

    LIMIT OF WORK

    P

    P

    A

    UDROP-OFF

    P

    P

    A

    UDROP-OFF

    L161

    L161 LIGHTING & SITEFURNISHINGS - PLAZA

    LIGHTING & SITE FURNISHINGS -PLAZA

    2015

    1 LIGHTING & SITE FURNISHINGS - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 LIGHTING & SITE FURNISHINGS - PLAZA WEST1:200

    MATCHLINE L162

    MATCHLINE L163

    MA

    TCH

    LIN

    E L

    161

    - 2

    MA

    TCH

    LIN

    E L

    161

    - 1

    MATCHLINE L163

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    (8) Gingko biloba

    (5) Acer x acerfolia

    (8) Archontophoenix alexandrae

    (8) Archontophoenix alexandrae

    (15) Acer x acerfolia

    (2) Ginkgo biloba

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    (8) Gingko biloba

    (5) Acer x acerfolia

    (8) Archontophoenix alexandrae

    (8) Archontophoenix alexandrae

    (15) Acer x acerfolia

    (2) Ginkgo biloba

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    CLIPPED HEDGE(PROPOSED)

    STREET TREE(PROPOSED)

    PALM TREE(PROPOSED)

    GROUNDCOVER& PERENNIAL BED(PROPOSED)

    LARGE SHRUB2.5-4m TALL(PROPOSED)

    MEDIUM SHRUB1-2m TALL(PROPOSED)

    SMALL SHRUB(PROPOSED)

    TURF(PROPOSED)

    NOTES:

    1. SHRUB PLANTING TO BE PLANTED IN DRIFTS AND PLANTS TO BE MAINTAINED INTHEIR NATURAL FORM UNLESS OTHERWISE SPECIFIED AS A CLIPPED HEDGE ORFORM.

    2. ALL TREES AND SHRUBS TO BE PROVIDED DRIP IRRIGATION PER IRRIGATIONCONTRACTOR. ALL LAWN AND GROUNDCOVER AREAS TO BE PROVIDED SPRAYIRRIGATION PER IRRIGATION CONTRACTOR.

    BUILDINGENTRANCE

    WINDOW

    MATCHLINE

    VINE(PROPOSED)

    LIMIT OF WORK

    DROP-OFF

    (6) Ginkgo biloba

    (2) Acer x acerfolia

    DROP-OFF

    (6) Ginkgo biloba

    (2) Acer x acerfolia

    L201

    L201 PLANTING PLAN - PLAZA

    PLANTING PLAN - PLAZA

    2015

    1 PLANTING PLAN - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 PLANTING PLAN - PLAZA WEST1:200

    MATCHLINE L202

    MATCHLINE L203

    MA

    TCH

    LIN

    E L

    201

    - 2

    MA

    TCH

    LIN

    E L

    201

    - 1

    MATCHLINE L203

    1L410

    5L410

    TREE - INGROUNDCOVER, TYP.

    GROUNDCOVER, TYP.

    PALM TREE, TYP.

    2L410

    5L4

    11P

    LAZA

    PLA

    NTE

    R

    JINJIANG WANG CUO DD - CRESCENT PLAZAryan morrison for robert a.m. stern architects, 2015

    1.4

    1.4 JINJIANG WANG CUO - CRESCENT PLAZA . robert a.m. stern architects . ryan morrison . 2015

    SITE PLAN - PLAZACRESCENT PLAZA UNDER CONSTRUCTION

    LIGHTING AND FURNISHING PLAN - PLAZAGRADING PLAN - PLAZA PLANTING PLAN - PLAZA

  • CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    MATCHLINE

    CENTER LINE

    UNIT ENTRANCE

    VIEW DIRECTION

    LIMIT OF WORK

    DROP-OFF

    DROP-OFF

    L101

    L101 SITE PLAN - PLAZA

    SITE PLAN - PLAZA

    2015

    1 SITE PLAN - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 SITE PLAN - PLAZA WEST1:200

    MATCHLINE L102

    MATCHLINE L103

    MA

    TCH

    LIN

    E L

    101

    - 2

    MA

    TCH

    LIN

    E L

    101

    - 1

    MATCHLINE L103

    1+2

    L300

    3L300

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    (8) Gingko biloba

    (5) Acer x acerfolia

    (8) Archontophoenix alexandrae

    (8) Archontophoenix alexandrae

    (15) Acer x acerfolia

    (2) Ginkgo biloba

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    (8) Gingko biloba

    (5) Acer x acerfolia

    (8) Archontophoenix alexandrae

    (8) Archontophoenix alexandrae

    (15) Acer x acerfolia

    (2) Ginkgo biloba

    DECIDUOUS TREE(PROPOSED)

    ORNAMENTAL TREE(PROPOSED)

    CLIPPED HEDGE(PROPOSED)

    STREET TREE(PROPOSED)

    PALM TREE(PROPOSED)

    GROUNDCOVER& PERENNIAL BED(PROPOSED)

    LARGE SHRUB2.5-4m TALL(PROPOSED)

    MEDIUM SHRUB1-2m TALL(PROPOSED)

    SMALL SHRUB(PROPOSED)

    TURF(PROPOSED)

    NOTES:

    1. SHRUB PLANTING TO BE PLANTED IN DRIFTS AND PLANTS TO BE MAINTAINED INTHEIR NATURAL FORM UNLESS OTHERWISE SPECIFIED AS A CLIPPED HEDGE ORFORM.

    2. ALL TREES AND SHRUBS TO BE PROVIDED DRIP IRRIGATION PER IRRIGATIONCONTRACTOR. ALL LAWN AND GROUNDCOVER AREAS TO BE PROVIDED SPRAYIRRIGATION PER IRRIGATION CONTRACTOR.

    BUILDINGENTRANCE

    WINDOW

    MATCHLINE

    VINE(PROPOSED)

    LIMIT OF WORK

    DROP-OFF

    (6) Ginkgo biloba

    (2) Acer x acerfolia

    DROP-OFF

    (6) Ginkgo biloba

    (2) Acer x acerfolia

    L201

    L201 PLANTING PLAN - PLAZA

    PLANTING PLAN - PLAZA

    2015

    1 PLANTING PLAN - PLAZA EAST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    2 PLANTING PLAN - PLAZA WEST1:200

    MATCHLINE L202

    MATCHLINE L203

    MA

    TCH

    LIN

    E L

    201

    - 2

    MA

    TCH

    LIN

    E L

    201

    - 1

    MATCHLINE L203

    1L410

    5L410

    TREE - INGROUNDCOVER, TYP.

    GROUNDCOVER, TYP.

    PALM TREE, TYP.

    2L410

    5L4

    11P

    LAZA

    PLA

    NTE

    R

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTERFOUNTAIN

    MR3

    SHUANG LONG ROAD

    METAL EDGING, TYP.

    PLAZA FOUNTAINBRIDGE PAVING

    PLAZA FOUNTAIN

    SALES CENTERTRANSITION PAVING

    PAVING ONCONCRETE BASE, TYP.

    CRESCENT PLAZAPAVING, TYP.

    STONE CURB, TYP.

    PLAZA STAIRS, TYP.

    PLAZA ENTRANCEPAVING

    OBELISK FOUNTAINPAVING

    CRESCENT PLAZABORDER PAVING, TYP.

    2L400

    7L400

    6L400

    4L400

    3L400

    1L401

    4L401

    1L4

    03

    6L404

    1L410

    8L404

    3L403

    2L403

    10L404

    5L400

    PLAZA STAIRSPAVING

    5L4

    11

    11L404

    13L404

    PLAZA HANDRAIL,TYP. PALM TREE, TYP.

    CRESCENT PLAZA

    SALES CENTER PLAZA

    WEDGE SCULPTURE -SEE ARCHITECTURE DRAWINGS

    OBELISK - SEEARCHITECTUREDRAWINGS

    KIOSK, TYP.

    INTERACTIVEFOUNTAIN

    CASCADEFOUNTAIN

    SALES CENTER

    MR3

    SHUANG LONG ROAD

    METAL EDGING, TYP.

    PLAZA FOUNTAINBRIDGE PAVING

    PLAZA FOUNTAIN

    SALES CENTERTRANSITION PAVING

    PAVING ONCONCRETE BASE, TYP.

    CRESCENT PLAZAPAVING, TYP.

    STONE CURB, TYP.

    PLAZA STAIRS, TYP.

    PLAZA ENTRANCEPAVING

    OBELISK FOUNTAINPAVING

    CRESCENT PLAZABORDER PAVING, TYP.

    2L400

    7L400

    6L400

    4L400

    3L400

    1L401

    4L401

    1L4

    03

    6L404

    1L410

    8L404

    3L403

    2L403

    10L404

    5L400

    PLAZA STAIRSPAVING

    5L4

    11

    11L404

    13L404

    PLAZA HANDRAIL,TYP. PALM TREE, TYP.

    DROP-OFF

    PAVING ONCONCRETE BASE, TYP.

    STONE CURB, TYP.

    8L404

    10L404

    DROP-OFF

    PAVING ONCONCRETE BASE, TYP.

    STONE CURB, TYP.

    8L404

    10L404

    MATCHLINES

    STONE RETAININGWALL,SEE L405, DTL 1

    LIGHTCOLOREDSTONE PAVER

    RAISED STONE CURBSEE L404, DTL 10

    METAL EDGINGSEE L404, DTL 11

    MEDIUMCOLOREDSTONE PAVER

    DARK COLOREDSTONE PAVER

    VERY DARKCOLOREDSTONE PAVERFOUNTAINBASINS

    ASPHALTSEE L404, DTL 4

    CONCRETE CURBSEE L404, DTL 3

    UNIT ENTRANCE

    VIEW DIRECTION

    STONE SLAB

    RIVER STONENOT TOEXCEED 75mm

    FENCE

    LIMIT OF WORK

    L111

    L111 MATERIALS PLAN -PLAZA

    MATERIALS PLAN - PLAZA

    2015

    1 MATERIALS PLAN - PLAZA EAST1:200

    2 MATERIALS PLAN - PLAZA WEST1:200

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    SHUANG LONG ROAD

    MATCHLINE L112

    MATCHLINE L113

    MA

    TCH

    LIN

    E L

    111

    - 2

    MA

    TCH

    LIN

    E L

    111

    - 1

    MATCHLINE L113

    A

    A

    A

    A

    A

    AA

    A

    D

    D

    DD

    D

    D

    D

    D

    D

    D

    NOTE: PAVERS IN FIELD TO FOLLOWARC OF BANDS AND BUILDING FACADE.

    OBELISKFOUNTAINTBD

    A

    NOTE: PAVERS IN FIELD TO FOLLOWARC OF BANDS AND BUILDINGFACADE.

    DD

    D

    D

    ADJUST WIDTH OFJOINTS BETWEEN ALLPAVERS TO ELIMINATECUT PAVERS ATNORTH AND SOUTHSIDES OF FIELD.

    C

    AD

    D D

    D

    BUILDING FACADE

    NOTE: PAVERS IN FIELD TO FOLLOWARC OF BANDS AND BUILDINGFACADE.

    ADJUST WDITH OFJOINTS BETWEEN ALLPAVERS TO ELIMINATECUT PAVERS ATNORTH AND SOUTHSIDES OF FIELD.

    A

    A

    A

    D

    D

    D DD D

    GATEWAY PAVILION -SEE ARCHITECTUREDRAWINGS

    CASCADE FOUNTAIN

    BRIDGE

    I

    C

    C

    D

    D

    NOTE: PAVERS IN FIELD TO FOLLOWARC OF BANDS AND BUILDINGFACADE.

    WEDGEFOUNTAINTBD

    WEDGEFOUNTAINTBD

    150

    150

    300

    300

    600

    100

    300

    450

    900

    A

    B

    C

    E

    F

    G

    H

    I

    J

    150

    300

    300

    600

    600

    900

    900

    900

    900

    450

    100 D

    NOTE: PAVERS IN FIELD TO FOLLOWARC OF BANDS AND BUILDINGFACADE.

    07.09 BS

    07.51 TS

    07.15 BS

    07.12 BC

    07.53 TS

    07.52 TC

    C

    A

    D

    D

    D D

    L400

    L400 PAVING DETAILS -PLAZA

    PAVING DETAILS - PLAZA

    2015

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    1 CRESCENT PLAZA PAVING LOCATOR PLAN1:500

    2 CRESCENT PLAZA OBELISK FOUNTAIN PAVING1:50

    3 CRESCENT PLAZA TYPICAL PAVING1:50

    4 CRESCENT PLAZA TYPICAL BORDER PAVING1:50

    7 SALES CENTER TRANSITION PAVING1:50

    6 CRESCENT PLAZA ENTRANCE PAVING1:50

    2L400 3

    L400

    4L400

    7L400

    6L400

    5 CRESCENT PLAZA STAIRS PAVING1:50

    5L400

    9000

    4L401

    3L4

    03

    1L403

    #L401

    #L401

    2L4

    03

    3000

    1170

    0

    40000

    4L405

    JJJ

    J

    JJJ

    J

    3L405

    1L4

    052L4

    05

    900 TYP.100 TYP.

    GRANITE STONE PAVER,LYCHEE FINISH, TYP.

    900

    TYP.

    GRANITE STONE CURB,NATURAL CLEFT FINISH, TYP.

    J J

    J J

    GRANITE STONE PAVER,LYCHEE FINISH, TYP.

    100

    TYP.

    100 TYP.

    900 TYP.

    900

    TYP.

    850

    TYP.

    COMBINED WATER JET NOZZLE AND LIGHTFLUSH WITH PAVING BY OTHERS

    15

    SLOT DRAIN

    GRANITE STONE PAVER,NATURAL CLEFT FINISH, TYP.

    J J

    J J

    150

    150

    300

    300

    600

    100

    300

    450

    900

    A

    B

    C

    E

    F

    G

    H

    I

    J

    150

    300

    300

    600

    600

    900

    900

    900

    900

    450

    100 D

    L401

    L401 PAVING DETAILS -PLAZA FOUNTAIN

    PAVING DETAILS - PLAZA FOUNTAIN

    2015

    LEGEND / NOTES

    KEY PLAN

    DATEISSUENO.

    PROJECT NO:

    CAD FILE NO:

    DRAWING NO:

    ROBERT A.M. STERN ARCHITECTS, LLP

    TEL (212) 967-5100 | FAX (212) 967-5588460 WEST 34th STREET, NEW YORK, NY 10001

    Copyright Robert A.M. Stern Architects LLP

    JINJIANG WANG CUOMIXED-USE PROJECT

    JINJIANG, CHINA

    AVIC LEGEND

    03/27/2015100% DESIGN DEVELOPMENT1.

    JINJIANG CHINA PRC

    NOT FORCONSTRUCTION

    NOT FORCONSTRUCTION

    N

    1 PLAZA FOUNTAIN - PLAN1:50

    4 PLAZA FOUNTAIN BRIDGE - PLAN1:50

    3 CASCADE FOUNTAIN PAVING - PLAN1:10

    2 PLAZA FOUNTAIN PAVING - PLAN1:10

    1.4 JINJIANG WANG CUO - CRESCENT PLAZA . robert a.m. stern architects . ryan morrison . 2015

    PLANTING PLAN - PLAZA

    MATERIALS PLAN AND PAVING DETAILS FOUNTAIN PAVING DETAILS AND CONSTRUCTION PROGRESS

  • PARK 1ryan morrison for martha schwartz partners, 2013rendered plan - rhino 3d, autocad, and photoshop

    1.5

  • WATERFRONT PLAZAryan morrison for martha schwartz partners, 2013rendered plan - rhino 3d, autocad, and photoshop

    1.6

  • big bend national park (1944)

    UNITED STATES

    MEXICO

    texas

    oklahoma

    kansascolorado

    new mexico

    chihuahua

    durango

    zacatecas

    cohuila

    nuevo leon tamaulipas

    sinaloa

    del rio

    ciudad acuna

    bracketville

    jimenez

    san carlos

    piedras negras

    zaragoza

    nava

    allende guerrero

    hidalgo

    nuevo laredo

    laredo

    rio bravo

    nueva ciudad guerrero

    rio grande city

    paras

    ciudad miguel alemanagualeguas

    general trevino

    ciudad cerralvo

    mission

    mcallen

    reynosaciudad rio bravo

    matamoros

    port isabel

    brownsville

    weslaco

    harlingen

    el control

    progreso

    cuidad camargosullivan city

    ciudad mier

    colombia

    morelos

    villa union

    manuel benavides

    presidio

    ojinagasantiago de coyame

    marfaalpine

    el porvenir

    guadalupe

    sonora

    crane

    mccamey

    fort stockton

    balmorhea

    toyahpecos

    barstow

    grandfalls

    kermit

    wink

    monahans

    pyote wickett

    eunicecarlsbad

    artesia

    dell city

    ruidoso

    tularosa

    alamogordo

    truth or consequences

    socorro

    las cruces

    vado

    el paso

    chaparralanthony

    ciudad juarezhorizon city

    socorrosan isidro

    praxedis g. guererro

    fabens

    albuquerque

    bosque farms

    los lunas

    rio communities

    belen

    rio rancho

    santa fe

    pueblo of cochitisanto domingo pueblo

    white rock

    los alamossanta clara pueblo

    espanola chimayo

    abiquiu

    taos

    san luis

    fort garlandalamosa

    lama

    manassa

    monte vista

    del nortesouth fork

    la joya

    antonito

    donna

    isleta village proper

    bernalillo

    monclova

    saltillo

    monterrey

    parral

    delicias

    chihuahua

    santa catarinasan pedro garza garcia

    escobedonicholas de los garza

    apodaca

    guadalupe

    juarez

    garciael carmen

    hidalgo salinas victoria

    bustamante

    sabinas hidalgo

    castanos municipality

    san buenaventura

    cuatro cienegas

    lampazas de naranjo

    anahuec

    general bravo

    chinalos ramones

    estacion alderamas

    ramos arizpe

    sabinascloete

    nueva rositasan juan de sabinas

    palaumuzquiz

    juventud norte

    pistolas menesesjuan aldama

    sacramento

    rosales

    saucillo

    camargo

    jimenez

    san francisco del oro

    santa barbara

    balleza

    san mateo

    naica

    concepcion

    el paradero

    eagle pass

    '

    to houston

    rio florido

    rio sabinas

    rio monc lov

    a

    rio sal ado

    rio pesqu eria

    pecos river

    rio puerto

    rio ch

    ama

    rio san ta isabel

    r i o conchos

    rio g rande/rio bravo

    elephant butte dam (1916)

    caballo dam

    rio grande dam (1914)

    el vado dam (1935)

    american diversion dam (1938)

    international diversion dam (1918)

    falcon dam (1954)

    jemez canyon dam (1953)

    isleta diversion dam (1934)

    abiquiu dam (1956)

    san acacia diversion dam (1934)

    angostura diversion dam (1934)

    amistad dam (1969)

    cochiti dam (1965)

    heron reservoir (1971)

    galisteo dam (1970)

    retamal dam (1975)marte r. gomez dam (1936)

    el chuchillo dam (1993)

    venustiano carranza dam

    presa de la boquilla

    presa francisco j. madero

    luis l. leon1944WATER TREATY OF 1944 - US AND MEXICAN GOVERNMENTS - WATER MANAGEMENTDistributes the waters in the international segment of the Rio Grande from Fort Quitman, Texas to the Gulf of Mexico. This treaty also authorizes the two countries to construct operate and maintain dams on the main channel of the Rio Grande, entrusts the IBWC to give preferential attention to the solution of all border disputes and sanitation issues.

    1964 BORDER INDUSTRIALIZATION MAQUILADORA PROGRAM - MEXICAN GOVERNMENT - ECONOMYLess than a year after the end of the Bracero Program, the Mexican Government launches the Border Industrialization Program (BIP) or the Maquiladora Program, to solve the problem of rising unemployment along the border. This massive border industry is created in 1964, and dominates the industrial makeup of the 2,000-mile border between the US and Mexico.

    1983 LA PAZ AGREEMENT DETERMINES 100km BORDER REGION - US AND MEXICAN GOVERNMENTS - BORDERThe US and Mexico determine that the border region extends 62.5 miles (100 kilometers) on each side of the international border.

    1991 TEXAS CLEAN RIVERS ACT - TEXAS STATE LEGISLATURE - WATER QUALITYThe Texas Legislature passes the Texas Clean Rivers Act in response to growing concerns that water resource issues are not being pursued in an integrated, systematic manner. The act requires that ongoing water quality assessments be conducted for each river basin in Texas, an approach that integrates water quality and water quantity issues within a river basin, or watershed.

    1992 RELEASE OF THE INTEGRATED ENVIRONMENTAL PLAN FOR THE US-MEXICO BORDER AREA (IBEP) - IBWC - WATER QUALITYStrengthened enforcement of environmental laws, increased cooperative planning, completed the expansion of wastewater treatment facilities.

    1993 CREATION OF THE BECC AND NADBANK - IBWC - REGULATIONThe Border Environment Cooperation Commission and North American Development Bank assist communities on both sides of the border in coordinating and carrying out environmental infrastructure projects.

    1994 NORTH AMERICAN FREE TRADE AGREEMENT - US AND MEXICAN GOVERNMENTS - ECONOMYThe North American Free Trade Agreement (NAFTA) comes into eect, stimulating trade between the United States and Mexico. Massive increases in border populations occur due to the treaty.

    2006SECURE FENCE ACT OF 2006 - US FEDERAL GOVERNMENT - BORDERThe Secure Fence Act of 2006s stated goal is to help secure Americas borders to decrease illegal entry, drug traicking, and security threats by building 700 miles (1,100 km) of physical barriers along the Mexico-United States border. Additionally, the law authorizes more vehicle barriers, checkpoints, and lighting as well as authorizes the Department of Homeland Security to increase the use of advanced technology like cameras, satellites, and unmanned aerial vehicles to reinforce infrastructure at the border.

    2012BORDER 2012 PROGRAM INITIATED - US EPA - REGULATIONThe EPA launches the US-Mexico Environmental Program - Border 2012, a collaboration between the US and Mexico to improve the environment and protect the health of the nearly 12 million people living along the border. The bi-national program focuses on cleaning the air, providing safe drinking water, reducing the risk of exposure to hazardous waste, and ensuring emergency preparedness along the US-Mexico border.

    2001 RIO GRANDE FAILS TO REACH THE GULF OF MEXICO - WATER MANAGEMENTA 328-foot (100 m) wide sandbar forms at the mouth of the river, marking the first time in recorded history that the Rio Grande fails to empty into the Gulf of Mexico.

    1938 RIO GRANDE COMPACT - COLORADO, NEW MEXICO, AND TEXAS STATE LEGISLATURES - WATER MANAGEMENTEquitably apportions waters of the Rio Grande Basin between Colorado, New Mexico, and Texas. The table worked out provides for Colorado and New Mexico to deliver water in accord with a formula based upon the flow of the Rio Grande and its tributaries at designated gauging stations above the state lines.

    1922 COLORADO RIVER COMPACT - US AND MEXICAN GOVERNMENTS - WATER MANAGEMENTThe Law of the River enables widespread irrigation of the lower division states (Nevada, Arizona, California).

    1888INTERNATIONAL BOUNDARY COMMISSION - US AND MEXICAN GOVERNMENTS - BORDEREstablishes the International Boundary Commission (IBC) to apply the rules in the 1884 Convention, establishing rules for determining the boundary when the meandering rivers transfer tracts of land from one bank of the river to the other.

    1848 TREATY OF GUADALUPE HIDALGO - US AND MEXICAN GOVERNMENTS - BORDERThe Treaty of Guadalupe Hidalgo ends the Mexican-American War and establishes the international boundary between the United States and Mexico.

    arroyo c

    ibolo

    rio grande/rio bravo

    rio grande/rio bravo

    arroyo

    cnang

    as

    arroyo m

    imbros

    o

    arroyo

    tortolo

    arro

    yo ar e

    noso

    la

    zanja

    el bajio

    arroy

    o ch

    illon

    PRESIDIO

    OJINAGA

    THE FORGOTTEN REACH: a transboundary water strategy for the arid rio grande/ro bravothis project operates on the assumption that wastewater can be a valuable commodity when used to irrigate woody crops for pulpwood production in a co-operative plan. using the watershed as a model to rethink the border as an expanded zone rather than as a dimensionless line allows water to become a tool in mediating environmental and social issues.

    2.1

    2.1 THE FORGOTTEN REACH . ccny studio . ryan morrison . 2014

    major riverspop. density railint. borderwatershed unusedagroco-opplantationripariancirculationhydrology nodenetworkrail int. border

    RIO GRANDE / RIO BRAVO REGIONAL WATERSHED PRESIDIO - OJINAGA

  • arroyo c

    ibolo

    rio grande/rio bravo

    rio grande/rio bravo

    arroyo

    cnang

    as

    arroyo m

    imbros

    o

    arroyo

    tortolo

    arro

    yo ar e

    noso

    la

    zanja

    el bajio

    arroy

    o ch

    illon

    PRESIDIO

    OJINAGA

    2.1 THE FORGOTTEN REACH . ccny studio . ryan morrison . 2014

    THICKENED BORDER MODEL

    WATERSHED FLOW / CONTAMINANT MODEL

  • composite

    circulation

    riparian buer

    active agriculture

    abandoned agriculture

    co-op plots (1200 acres)

    abandoned agricultural lots become binational tree planting co-operative (1,200 acres needed to treat ojinaga/presidio municipal wastewater)

    approximately 50% of ojinaga/presidios agricultural land has been abandoned from over-salinization due to poor agricultural practice and small, uncompetitive landholdings

    existing woody plantations are irrigated directly from the river by flood irrigation, whereby 50% of the water is wasted and does not reach the crops.

    oxbows show a shifting river course under a fluid boundary and provide opportunity for a dynamic, binational riverfront park

    planting irrigation channels and interstitial spaces between agricultural plots aids in water treatment for agricultural runo and provides other vital ecosystem services

    a more fluid and open border within the neutral territory of a binational park promotes gathering and exchange

    wastewater mainline (pipe)

    biomass harvested for pulpwood

    and transportated to ojinaga rail

    station for shipment to chihuahua

    drip irrigation fee

    der

    drip irrigation fee

    der

    drip irrigation fee

    der

    drip irrigation tub

    es

    drip irrigation tub

    es

    drip irrigation tub

    es

    subsurface runo

    to

    center swale, conn

    ects to

    agricultural draina

    ge channels

    subsurface runo

    to

    center swale, conn

    ects to

    agricultural draina

    ge channels

    subsurface runo

    to

    center swale, conn

    ects to

    agricultural draina

    ge channels

    establishment (po

    pulus)

    60 labor hours pe

    r acre/year

    600 labor hours f

    or 10 acre farm/y

    ear

    32-foot spacing

    growth and maint

    enence (populus)

    20 labor hours pe

    r acre/year

    200 labor hours fo

    r 10 acre farm/yea

    r

    one-rotation harve

    st (populus)

    100 labor hours p

    er acre/year

    1,000 labor hours

    for 10 acre farm/ye

    ar

    continuous treatm

    ent of wastewater

    in the root zone

    YEAR 1

    YEAR 3-4

    YEAR 7

    2.1 THE FORGOTTEN REACH . ccny studio . ryan morrison . 2014

    CO-OPERATIVE STAGING REMEDIATION PLANTATION

  • LEVEE, PULPWOOD TRANSPORT PROCESSION, BORDER PATROL ROUTE

    PUBLIC GATHERING, MUSIC PAVILION, UPLAND DESERT TERRACES, GRANDFATHER TREES

    HARVESTED WOOD BOARDWALK AND PIER

    PEDESTRIAN BRIDGE OVERPASS

    MEANDER

    PULPWOOD STAGING AREA

    VEHICULAR CROSSING

    LOWLAND RIVERINE TRAILS

    PULPWOOD TRANSPORT PROCESSION

    WALKING DISTANCE9,042 = 34 minute walk at 3mph

    SECTIONS400 o-center

    2.1 THE FORGOTTEN REACH . ccny studio . ryan morrison . 2014

    unused plotsactive agroco-op plantationext. plantationriparian buffer hydrologylevee

    BINATIONAL OXBOW PARK

    PLANTATION AT WORK

    RIPARIAN BOARDWALK AND TRAILS

    TERRACED DESERT GARDENS

  • OWNERSHIP

    IDENTITY

    cultural institutionshistorical sitescommunity spaces)

    FLOOD PLAIN

    SOC

    IAL

    URB

    AN

    ISM

    ENVI

    RON

    MEN

    TAL

    (neighborhood centerssocial centerslocal business ownership)(home ownershipPEDESTRIANISM

    pedestrian circulationdeficiencies in public transitpedestrian safety )(ECOLOGY

    environmentally damaged sitesdeveloped green spacesundeveloped green spaces )(

    NEW POINT ROAD: a masterplan for elizabeth, new jerseythe decaying industrial fringe surrounding new point road becomes a target for revitilization. this project takes advantage of undeveloped open space with the goals of enhancing elizabeths identity, encouraging a sense of ownership, improving pedestrian safety and movement, managing damaged sites, and ultimately restoring a healthy and functioning ecology.

    2.2

    2.2 NEW POINT ROAD . ccny studio . ryan morrison . 2013

    ELIZABETHS NATURAL AND SOCIAL ECOLOGIES SITE MODEL

  • 5 mins.

    10 m

    ins.

    15 m

    ins.

    MASTER PLAN, NEW POINT ENVIRONS flood plain evacuationneighborhood center

    bank forclosed property

    reclaimed open green space

    broadway reinstatement

    new point road pedestrian corridor

    elizabeth loop shuttle bus0 250 500 1000

    1:2500 100 200 400 800

    N

    2.2 NEW POINT ROAD . ccny studio . ryan morrison . 2013

    STRATEGIC MASTER PLAN flood plain evacuationneighborhood center

    bank forclosed propertyreclaimed open green space

    broadway reinstatementnew point road pedestrian corridor

    elizabeth loop shuttle bus

  • GARA

    GE

    FOOD CO-O

    P

    KITC

    HEN

    DAYC

    ARE

    HOME HEL

    P OFF

    ICE

    LAUNDRO

    MAT

    GYM

    LANGUAG

    E CEN

    TER

    URBAN AGRICULTURECOMMUNITY GARDENCHILDRENS PLAY AREAOUTDOOR EXERCISEDOG RUN

    RETA

    IL

    GARA

    GE

    KITC

    HEN

    FOOD CO-O

    P URBAN AGRICULTURE

    URBAN AGRICULTURE

    LANGUAG

    E CEN

    TER

    DAYC

    ARE

    CHILDRENS PLAY AREA

    OUTDOOR EXERCISE

    GYM

    LAUNDRO

    MAT

    HOME HEL

    P OFF

    ICE

    COMMUNITY GARDENDOG RUN

    RETA

    ILRE

    TAIL

    COMMUNITY

    CEN

    TER

    RETA

    ILRE

    STAU

    RANTOUTDOOR GRILL/PATIO

    POCKET PARK

    POCKET PARKPOCKET PARK

    DAYC

    ARE

    HOME HEL

    P OFF

    ICE

    FOOD CO-O

    P

    CHILDRENS PLAY

    URBAN AGRICULTURE

    HOME HEL

    P OFF

    ICE

    LAUNDRO

    MATGARDEN

    CO-HOUSING ALLEY SYSTEM (BASED ON DOLORES HAYDENS HOMES MODE. IMPLEMENTABLE IN STAGES, DEMOCRATICALLY VOTED FOR IMPLEMENTATION BY COMMUNITY BOARD

    URBAN AGRICULTURE - urban farming programs provide produce to the local food co-op and farmers market

    CHILDRENS PLAY AREA - outdoor play area for neighborhood children

    DOG RUN - enclosed area for neighborhood pets to socialize, play and exercise

    OUTDOOR EXERCISE - outdoor gym equipment that the community can use to stay active and healthy

    OUTDOOR GRILL/PATIO - a public grill patio for events and picnics

    PUBLIC GARDEN - green space for quiet relaxation

    OPEN SPACE PROGRAMMINGSET BACK PROGRAMMING

    FOOD CO-OP - a grocery depot connected to the local food cooperative

    KITCHEN - provides lunches for the daycare center, takeout evening meals, and meals-on-wheels for elderly people in the community

    GARAGE - two vans provide dial-a-ride service and meals-on-wheels

    LANGUAGE CENTER - ESL classes oered at night

    GYM - an indoor gym keeps community members active and healthy

    COMMUNITY CENTER - a flexible indoor community space for meetings and events

    HOME HELP OFFICE - provides helpers for the elderly, the sick, and employed parents whose children are sick

    LANDROMAT - laundry service

    DAYCARE - provides daycare service and after school activities

    9 single mothers with 18 children

    21 couples living together with 50 children

    50 AVG HOUSEHOLDS IN THE NEW POINT RD NEIGHBORHOOD*

    6 elderly residents living on their own

    3 couples living apart sharing custody of 6 children (6 households)

    3 single men with no (or abandoned) children

    5 couples living together with no (or grown) children

    High proportion of single mothers (19.2% vs. 12.8% for Elizabeth citywide). High need for home help and sharing of household duties (eg. daycare) as well as aordable food.

    33.7% of residents do not speak English well or at all. High need for language training services.

    Median household income: $31,550 vs. $41,312 for Elizabeth citywide.

    1 elderly resident living in nursing care

    SCENARIO A - SCATTERED INFILL, NO ALLEY

    SCENARIO B - MULTIPLE UNIT INFILL, ALLEY, NO TRELLIS

    SCENARIO C - FULL BLOCK ON ONE SIDE, ALLEY WITH TRELLIS

    SCENARIO D - FULL BLOCK AND COMPLETE ALLEY SYSTEM *data taken from 2010 census

    BROADWAY

    S PARK ST

    LIVINGSTON ST

    6TH

    ST

    NEW

    POIN

    T RD

    2.2 NEW POINT ROAD . ccny studio . ryan morrison . 2013

    NEW POINT ROAD AND PLAZA PLANS/SECTIONS

    NEW POINT ROAD SITE PLAN SET BACKS AND ALLEY SYSTEM

    SECT

    ION A

    SECTION B

    SECTION C

    B C

    A

  • 2.2 NEW POINT ROAD . ccny studio . ryan morrison . 2013

    PLAZA RENDERED PLAN

    PLAZA RENDERED VIEW (NIGHT) PLAZA RENDERED VIEW (WINTER)

    NEW POINT ROAD RENDERED PLAN

  • shore up main access route along Flatbush Ave.

    public transportation and pedestrian-focused communities

    off-grid wind and solar for essential services

    negligible outside energy demand

    atmospheric water generation for emergency potable water

    sustainable community-based water plan

    stockpiled food supplies

    food centers supplemented with community farming initiative

    centralized composting toilet hubs

    household composting toilets plug into system

    portable telecommunication towers (cows)

    portable becomes permanent

    shared modular shelter strategy

    densified modular neighborhoods

    stockpiled medicine and volunteer doctors/tutors medical center/schools

    shore up main access route along Flatbush Ave.

    use Flatbush Ave. and Belt Parkway to guard against future flooding

    off-grid wind and solar for essential services

    negligible outside energy demand

    atmospheric water generation for emergency potable water

    sustainable community-based water plan

    stockpiled food supplies

    food centers supplemented with community farming initiative

    centralized composting toilet hubs

    household composting toilets plug into system

    portable telecommunication towers (cows)

    portable becomes permanent

    shared modular shelter strategy

    densified modular neighborhoods

    stockpiled medicine and volunteer doctors/tutors medical center/schools

    shore up main access route along Flatbush Ave.

    distributed public transportation links

    distributed off-grid wind and solar for essential services

    distributed units plug into shared power system

    atmospheric water generation for emergency potable water

    distributed, shared water system

    stockpiled food supplies

    distributed food markets and community farm initiatives

    centralized composting toilet hubs

    household composting toilets plug into centralized system

    portable telecommunication towers (cows)

    dstributed coverage and access to telecommunications networks

    shared modular shelter strategy

    equal access to services across all households

    stockpiled medicine and volunteer doctors/tutors centralized clinics

    clear signage and communication of evacuation routes

    public inclusion in planning process where possible

    educational initiative community-based power strategy

    educational initiative community-based water strategy

    educational initiativepublic inclusion in planning process where possible

    educational initiative community-based waste strategy

    clear signage and communication through multiple sources

    public inclusion in planning process where possible

    insurance relief system high degree of housing customization

    clear communication of available services

    bottom-up educational institutions

    SHORT-TERM LONG-TERM SHORT-TERM LONG-TERM SHORT-TERM LONG-TERM SHORT-TERM LONG-TERM

    ECOLOGICAL VIABILITY (physical, economic, social)

    CIRCULATION/ACCESS

    POWER

    WATER

    FOOD

    WASTE

    DATA/COMMUNICATION

    SHELTER

    MEDS/EDS

    RESOURCE ALLOCATION/SCARCITY(doing more with less)

    EQUITY(social, economic, environmental)

    PUBLIC ENGAGEMENT(inclusion, transparency, accountability)

    MEDICAL SUPPLIESPERSONAL CARE ITEMSINFANT SUPPLIESCOTSBLANKETSEMERGENCY FOOD SUPPLY (MRES)ATMOSPHERIC WATER GENERATORSPET SUPPLIES

    SHOWERSLAUNDRY FACILITIES

    LATRINES WITH SHARED SEPTICSPECIAL NEEDS SUPPLIESSOLAR PANELSVERTICAL AXIS WIND TURBINES

    CHARGING STATIONSCOW (CELL ON WHEELS)

    PRESCRIPTION MEDICATIONMEDICAL WASTE DISPOSAL

    SUPPORT STAFFEMERGENCY MEDICAL STAFF

    PRIVATE BEDROOMS

    COMMUNITY SPACESORGANIZED EVENTS

    DAYCARE

    FOOD AND SUPPLIES MARKET

    RESTORATION CENTERCUSTODIAL SERVICES

    SECURITY STAFF

    MULTIFAITH CHAPEL

    HEALTH CENTER

    COMPOSTING TOILETS

    MEDIA CENTER

    SPEAKERS CORNER

    RECREATION CENTERCANTINA

    CENTER POPULATION

    5,000 maximum

    1,000 projected long-term

    PREPARATION

    DISAST

    ER

    LONG TERM

    FLOODING

    SUBS

    IDES

    TRANSP

    ORT

    ATION

    RECONEC

    TION

    POWER

    RES

    TORE

    D

    OTH

    ER UTILITIES

    RE

    STOEE

    D

    EVACUATION SHELTER REFUGEE HOUSINGPOST-DISASTER RECOVERY SHELTER

    PROPOSED SHORT TO LONG-TERM SHELTER SUPPLIES AND STAGING

    DISASTER PLANNING HURRICANE AFTERMATH RECOVERY PERIODLONG-TERMRECOVERY

    NATIONAL WEATHER SERVICE WARNING

    FIRST RESPONDER PREPARATIONADDITIONAL PERSONNEL FDNY INCIDENT MGMT TEAM

    TRANSPORATION INFRASTRUCTURE TRAINS TO HIGHER GROUND SUBWAY SYSTEM SHUTDOWN

    NOTIFICATION AND COMMUNICATION INTERNET PRESENCE (NYC.GOV, TWITTER, YOUTUBE) AND CITY ACCESS (311, 911)

    EMAIL NOTIFICATION ANALOG NOTIFICATION (PAPER FLYERS, BULLHORNS, DOOR VISITS)

    PHONE NOTIFICATIONS (LANDLINE AND CELLULAR), CMAS TEXTS

    PRESS OUTLETS

    SHELTER EMERGENCY SHELTER PREPERATION (EMERGENCY SUPPLY STOCKPILE)

    EVACUATION

    SHELTERS IN FULL OPERATION SHELTER CONSOLIDATION/DECOMMISSION

    EVACUATION ORDER FOR ZONE A (63% DO NOT EVACUATE) EMERGENCY HOSPITAL EVACUATIONS POST-STORM EVACUATION (29%)

    HEALTHCARE FACILITY NETWORK PREPARATION FOR SHELTER IN PLACE PRE-STORM HOSPITAL EVACUATION (6,300 PATIENTS FROM 37 FACILITIES)

    FIRST RESPONDER ACTION

    RESCUES (2,200 REPORTED) NYPD SPECIAL OPS TEAM FDNY WATER RESCUE TEAM

    COWS (CELLS ON WHEELS)

    INTERIM FERRY SYSTEM

    BUILDING INFRASTRUCTURE DOB WINDHSHIELD ASSESSMENTS DOB DETAILED BUILDING INSPECTIONS

    POWER

    SANDBAG PLACEMENT AT VALUABLE ASSETS

    POWER RESTORATION (EMERGENCY CONTRACTS TO RESTORE NYCHA POWER)

    FUEL

    DOT FACILITY PUMPING (DOT, ARMY CORPS, NAVY) UNDERPASS PUMPING (ARMY CORPS AND NAVY) MTA AND PORT AUTHORITY PUMPING (MTA, PORT AUTHORITY, ARMY CORPS)

    ROAD, BRIDGE, TUNNEL CLOSURES

    GENERATOR DISPATCH

    SEARCHES (31,000 HOMES/BUSINESSES)

    RESTRICTIONS LIFTED TO ALLOW FUEL TO ENTER CITY FUELING OPERATIONS FOR EMERGENCY VEHICLES

    RECREATION CENTERS OPENED FOR SHOWERING TRANSITIONAL HOUSING ASSISTANCE (TSA) PROGRAM SHELTERING AND TEMPORARY ESSENTIAL POWER (STEP) PROGRAM

    NYC BUILD IT BACK PROGRAMS

    DEBRIS CLEARING (FEMA) - 70,000 TONS OF DEBRIS

    FUTURE PLANNING OFFICIAL REPORTS (AAR, SIRR) DESIGN COMPETITIONS (MOMA, PS1)

    RELIEF

    FOOD DISTRIBUTION (2.1 MILLION SHELF STABLE MEALS, 1.5 MILLION PREPARED MEALS) WATER DISTRIBUTION (1 MILLION BOTTLES) BLANKETS (166,000 BLANKETS)

    RESTORATION CENTERS

    NYCS RESPONSE TO HURRICANE SANDY

    RESORT TO RESORT: a disaster relief strategy for the rockaway peninsulathis project proposes a strategy for western rockaways residents to shelter close to home in the short term; and in the long term, as the peninsula becomes increasingly inhabitable, provides a desirable location to move to. this shifting dynamic presents an opportunity for a new urban condition: from wasteful beach resorts to self-sustaining communities.

    2.3

    2.3 RESORT TO RESORT . ccny studio . ryan morrison . 2013

    NYCS RESPONSE TO HURRICANE SANDY PROPOSED SHORT TO LONG-TERM SHELTER SUPPLIES AND STAGING

    PHASED MATRIX OF RELIEF INFRASTRUCTURE

  • BREEZY POINT

    ROXBURY NE

    PONSIT

    BELLE HARBO

    RROCKAW

    AY PAR

    K

    FLOY

    D BENNE

    TT FIELD

    2.3 RESORT TO RESORT . ccny studio . ryan morrison . 2013

    I