1 PROPOSED ACTION PLAN FOR REJUVENATION OF RIVER KANHAN at BOREGAON TAH : SAUSAR DISTT : CHHINDWARA PREPARED BY :- M. P. POLLUTION CONTROL BOARD, Chhindwara

RIVER KANHAN plan Kanhan river Borgaon... · 2019. 5. 21. · Nature Water Resource :- KANAHN RIVER AT Sausar, CHHINDWARA Description of Sapmling Station :- RIVER WATER AFTER MIXING

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    PROPOSED

    ACTION PLAN

    FOR REJUVENATION OF

    RIVER KANHAN

    at

    BOREGAON TAH : SAUSAR DISTT : CHHINDWARA

    PREPARED BY :-

    M. P. POLLUTION CONTROL BOARD, Chhindwara

  • 2

    CONTENTS

    SR. NO. CONTENTS PAGE NO.

    1 Executive summary 3

    2 Back Ground /NGT Case No. 673/2018

    4

    3 Components of Action Plan

    5

    4 Basic information of Kanhan River

    6-10

    5 Water Quality of Kanhan river 11-12

    6 Industrial Area Status of Borgaon

    13

    7 Short / long term Action Plan

    14-19

  • 3

    EXECUTIVE SUMMARY ON PROPOSED ACTION PLANS FOR

    REJUVENATION OF RIVER FOR IDENTIFIED POLLUTED RIVER STRETCH

    S. No. DESCRIPTION OF ITEM Details

    1 Name of the identified polluted river and its tributaries : Kanhan River

    2 Is river is perineal and total length of the polluted river : Yes

    3 No of drains contributing to pollution and names of major drains

    : 1 ( Barsati River/ Nall)

    4 Whether ‘River Rejuvenation Committee (RRC) constituted by the State Govt./UT Administration and If so, Date of constitution of ‘RRC’

    :

    5 Major Towns on the banks of the river with population : Nil

    a. Total water consumption and sewage generation in MLD : N.A.

    b. Total no. of existing STPs and the total capacities in MLD : Nil

    c. Gaps in sewage treatment in MLD and no. of towns not having STPs

    : N.A

    d. Total MSW generation in TPA : No city near bank

    e. Existing treatment and disposal facilities and total capacity

    : N.A

    6 Major industrial estates located with total no. of industries

    : 1 No. of ind. 70

    a. Total water consumption and total industrial effluent generation in MLD

    : Water Consumption. -- 8520 KLD Discharge & Re use -- 8400 KLD

    b. No. of industries having captive ETPs and their treatment capacity in MLD

    : 14

    c. No of CETP’s and their treatment capacity : Nil

    d. Gaps in treatment of industrial effluent : Nil

    e. Total HW generation in TPA in the catchment area :

    f. Existing HW Treatment and Disposal Facilities and total capacity with life span

    : Dispose through recyclers and TSDF

    7 Action plan includes mainly covering aspect such as (Proposal for utilization of sewage, ground water recharging or rain water harvesting, measures for regulating ground water use, protection and management of flood plain zone, maintaining minimum E-flows and water shed management, plantation on both sides of the river, setting up of bio-diversity parks etc., as per Hon’ble NGT Orders dated 20.09.2018 and 19.12.2018)

    : No waste discharge in river.

    8 Min. and Max. required time period for implementation of action plans

    3 - months 6 - years

    9 Total estimated budget in crores towards implementation of proposed action plans with break-up ( e.g. No. of STPs, capacity, total cost; No of CETPs, total capacity, Cost towards interception and diversion of sewage/effluent to STPs/CETPs etc.,)

    : preparation of DPR in one year

    10 Responsible Organization (s) for implementation of proposed action plans (Please enclose details as annexure )

    : Shown in plan

    11 Proposed Mechanism for execution of action plans :

    12 Expected deliverables w r to achieving Goals (Please enclose as annexure )

    :

  • 4

    NGT Case No. 673/2018

    • Hon’ble National Green Tribunal, Central Zonal Bench, New Delhi, in

    the matter of original application no. 673/2018 (News Item Published in

    the “Hindu” authored by Shri Jacob Koshy titled” More river stretches are

    now critically polluted: CPCB”) passed an order on 20/09/2018.

    • The para 48 states that “it is absolutely necessary that Action Plans are

    prepared to restore the polluted river stretches to the prescribed

    standards.” Para 49 states that “Model Action Plan for Hindon River”

    already provided by CPCB may also be taken into account.”

    • All states and Union Territories are directed to prepare action plans

    within two months for bringing all the polluted river stretches to be fit at

    least for bathing purposes (i.e. BOD < 3 mg/L and FC < 500 MPN/100

    ml) within six months from the date of finalization of the action plans.

  • 5

    • Components like identification of polluting sources including functioning/ status of STPs/ETPs/CETP.

    • Solid waste management and processing facilities, quantification and characterization of solid waste, trade and sewage generated in the

    catchment area of polluted river stretch.

    • The action plan will address issues relation to; ground water extraction, adopting good irrigation practices,

    • Protection and management of Flood Plain Zones (FPZ),

    • Rain water harvesting, ground water charging maintaining minimum environmental flow of river.

    • Plantation on both sides of the river.

    • Setting up of biodiversity parks on flood plains by removing encroachment.

    • The action plan should focus on proper interception and diversion of sewage carrying drains to the Sewage Treatment Plant (STP)

    • Utilization of treated sewage so as to minimize extraction of ground or surface water.

    • The action plan should have speedy, definite or specific timelines for execution of steps.

    • Provision may be made to pool the resources, utilizing funds from State budgets, local bodies, State Pollution Control Board/ Committee and out

    of Central Schemes.

  • 6

    Basic Information of Kanhan river Stretch

    • Kanhan River is non perennial and intermittent.

    • River Kanhan originates from village Bhaleaam , flows through the

    Damua Town To village Borgaon & finally River cross to interstate

    boundary near village Khapa padriwar after travelling approx. 200. Kms.

    • Among full length of Kanhan river only Borgaon catchment area is been

    mark under the action plan.

    • River “Jam” flows near by the small town Lodikheda and joins to Kanhan

    River near at village sangam, before Intec Well Point Sangam. No

    sewage waste discharge in this river from lodikheda town. This river

    being dry in all season's rest of monsoon.

    • Around Borgaon area there are three or four small villeges/towns situated

    in catchment area. From each town and Borgaon industrial area one or

    two seasonal nallas are flow to words the Kanhan river. (detail map

    enclosed.)

    • Population/ water supply of marked towns are:-

    • Lodikheda - 9950 1000 Kl/day

    • Borgaon - 7497 700 Kl/Day

    • Satnoor - 1784 150 kl/Day

    • Kheritaygaon - 3721 300 Kl/Day

  • 7

    Status of Pollution sources Nallas before Mixing in to Kanhan ( Dry )

    • Only one industrial area “ AKVN Industrial Growth centre” Borgaon is

    situated Approx. 9-10 KM. away from Kanhan River .

    • Three small drains generate from industrial area region and combine after

    travelling of about 2 km. This combined nalla travel 7.0 Km and mix in

    lodikheda nalla. It is dry at kabar pipla village before mix in lendi river.

    Again, this nalla trevel 1.5 Km and mixed in Lendi river . At last this mix

    in Kanhan river after travel of 1.5 km. It is also dry.

  • 8

    These all are seasonal nallas. Water flow found only in monsoon

    season. Recent position shows in photo graph , showing total dry position

    at mixing point of lodikheda nalla and confluence point of Kanhan river.

    Nalla from Satnoor is also found

    dry in present status.

    Nalla from Khairitaygaon

    dry in present status.

    Status of River kanhan at borgaon area stretch

    STATE RIVER

    NAME

    RIVER

    STRETCH

    BOD RANGE/

    MAX VALUE

    (mg/L)

    PRIORITY

    Madhya

    Pradesh

    KANHAN KANHAN IN

    CHHINDWARA

    DISTRICT

    BOUNDRY

    3.2 V

  • 9

    Kanhan RiverJam River

    Barsati Nalla Borgaon

    BorgaonIndustrial

    Area

    1

    3

    2

    BorgaonInd. area

    Nall1,2,3

    Barsati Nalla Satnoor

    Barsati Nalla Satnoor

    Barsati Nalla

    Kanhan River , Borgaon catchment , Chhindwara

    Photograph enclosed of markesd site

    lodhikheda

    Borgoan

    Kheritaigaon

  • 10

  • 11

    Water quality of Kanhan river

    Industrial.

    Only from June to December water flows in river and there is no flow

    from January to May. So sampling and monitoring done only from June to Dec.

    Data sheet enclosed.

    Only once BOD was 3.2 in December 2018 in monitoring results. It was

    slightly high then limit. After comparing results of two years the BOD value

    was slightly exceed from 3.0. . It could be happened due to human error. All

    the possible drains shown in Google image became dry after travelling of some

    KM. From source and all sources became dry before mixing in to Kanhan

    River. So throughout the year there is no source available to pollute Kanhan

    River.

    Domestic.

    All Nallas near the towns in catchment area became dry after travelling of

    some distance. So there are no possibilities of contributing of pollution in river

    due to urban discharge or City Sewage.

  • 12

    Water Quality During Year- 2017-18

    Nature Water Resource :- KANAHN RIVER AT Sausar, CHHINDWARA Description of Sapmling Station :- RIVER WATER AFTER MIXING BORGAON

    GROWTH CENTER NALLA AT BORGAON, CHHINDWARA

    S.No. Characteristic Unit Sept. Mar Av. Maxi. Mini.

    Date of Sampling 04/09/2017 23.03.2018

    1 pH pH Units 8.34 8.19 8.27 8.34 8.19

    2 Total Dissolved solids

    mg/l 518.00 595 556.50 595.00 518.00

    3 Total Coliform MPN/100 ml 39.00 - 39.00 39.00 39.00

    4 Chemical Oxygen Demand

    mg/l 20.00 20 20.00 20.00 20.00

    5 B.O.D. mg/l 3.20 2.8 3.00 3.20 2.80

    Water Quality During Year- 2018-19

    Nature Water Resource :- KANAHN RIVER AT Sausar, CHHINDWARA Description of Sapmling Station :- RIVER WATER AFTER MIXING BORGAON

    GROWTH CENTER NALLA AT BORGAON, CHHINDWARA

    S.No. Characteristic Unit

    Sept. Dec Mar Av. Maxi. Mini.

    Date of Sampling 13/09/2018 13.12.2018

    06.03.2019

    1 pH pH Units 7.83 8.31 7.34 7.83 8.31 7.34

    2 Total Dissolved solids

    mg/l 587.00 608.00 532.00

    575.67

    608.00 532.00

    3 Total Coliform MPN/100 ml 15.00 15.00 15.00 15.00

    4 Chemical Oxygen Demand

    mg/l 16.00 16.00 12.00

    14.67 16.00 12.00

    5 B.O.D. mg/l 2.80 3.20 1.60 2.53 3.20 1.60

  • 13

    Industrial Area Status of Borgaon

    Total No of industries ( Operational) - 70

    Water polluting - 14

    Water Polluting / Zero Discharge / Reuse - 14

    Total Water consumption in ind. area - 8520 Kl/day

    Total water recycle / Treat/ Dry (ZLD) - 8400 Kl/Day

    (approx)

    Total Ind. Effluent Re use (treated) Horticulture - 86.38 Kl/day

    In industrial area Borgaon, there are total 70 No’s of industries. Only

    14 industries are water polluting in nature, among 14 industries 11

    industries are treating their waste by ETP, STP , RO, MEE, dryers and all

    the treated waste is recycle and re use within industrial Premises and

    maintaining zero discharge. Only three water polluting ind are discharging

    their waste after treatment in their own premises for harticulture.

  • 14

    1. Proposed Short Term and Long Term Action plan for

    Rejuvenation of River Kanhan :-

    No Action plan for

    rejuvenation of river

    Chambal

    Organisation/

    Agency

    Responsible for

    Execution of the

    Action plan

    Time

    Target

    Present Status

    I Industrial Pollution Control

    (a) Inventorisation of the industries in the

    catchment area of River

    Kanhan covering

    assessment on aspects

    relating to status of

    consents under water &

    Air Acts and

    Authorization, Effluent

    Generation, ETP

    capacities and final mode

    of effluent discharges

    MPPCB Within

    three

    months

    All the water polluting

    industry are

    already covered

    under different

    Environmental

    Acts

    Verification of available Data

    (b) Action against the identified industries in

    operation without

    consents under water &

    Air Acts/Authorization

    under the H & OW (

    M& TM) Rules, 2016 as

    amended.

    MPPCB Within

    three

    months

    All water polluting

    industries are

    already covered

    under different

    Environmental

    Acts

    All water polluting unit

    installed

    ETP/STP

    (c) Action against the industries not install ETP

    or ETPs exist but not

    operating or ETP outlet or

    treated effluent is not

    complying to the effluent

    discharge standards or

    norms

    MPPCB Within

    three

    month

    Max units are adopting ZLD

    arrangements.

    Some SSI unit having ETP

    discharge small

    quantity of

    treated water will

    be re- examine

    thoroughly.

  • 15

    (d) Action against the red cat. Industry for installation

    of OCEMS and not

    transferring data to CPCB

    and MPPCB

    MPPCB Within

    three

    month

    Large one 17 type Industry (

    M/s Gulshan

    poliols,

    distillary)

    installed

    OCEMS.

    maintaining

    ZLD status

    (e) Small scale/tiny and service providing unit

    located in urban or semi

    urban limits like Auto

    service stations to have a

    minimum provision of O

    & G traps

    MPPCB Within

    three

    month

    No unit / service

    ind. established in

    urban locations

    (Villages) in

    borgoan

    surrounding areas.

    Re -survey will be

    done.

    (f) Prohibition of Burning of any kind of

    waste including agro

    residues

    State Govt. /

    District/ local

    Authorities

    Within

    three

    month

    Action already taken by local

    Administration

    Meeting will be done with AKVN

    administration

    and SDM sausar.

    (g) Direction to all the industries which are

    observed to be not in

    operation or closed or

    temporarily closed to

    remain close till further

    order from MPPCB.

    MPPCB Within

    three

    month

    Re survey.

    (h) Estimation of Industrial effluent generation

    MPPCB Within

    three

    month

    Total Water consumption in

    ind. area- 8520

    Kl/day

    Total Ind. Effluent

    discharge (

    treated)-

    8519

    Kl /day

    Re assessment

  • 16

    of effluent

    generation will

    be done on the

    bases of actual

    production /

    operation of

    industry in last

    three years.

    (i) Channelization of industrial effluent to

    CETPs for ensuring

    treatment to comply with

    the discharge standard

    MPPCB /District

    Collector /DIC

    Within

    six

    month

    All the units are

    having

    ETP/STP/MEE in

    Industrial area

    Borgaon.

    Physically it will

    be re-monitored.

    (j) Identification of suitable site within Industrial

    estates, Execution and

    Commissioning of

    Adequate Capacity

    CETPs

    State Government/

    MPPCB /DIC

    Within

    six

    month

    All the units are

    having ETP/STP.

    will be

    reassessed.

    II Sewage Treatment And Disposal Plant

    (a) Estimation of total sewage generation existing

    treatment capacities,

    quantum of disposal of

    sewage presently through

    drains and the gaps in

    sewage treatment capacity

    Municipal

    Council Sausar

    within

    1 years

    Detailed

    Estimation of

    sewage waste or

    run of water &

    disposal mode

    will be surveyed.

    At present no

    waste is flowing

    in the form of

    nalla up to long

    distance. Not

    mixing in river.

    (b) To undertake measurement of flow of all the drains

    presently contributing

    pollution load in river

    Kanhan and to formulate

    Municipal

    Council Sausar

    -- No drain is mix

    with Kanhan river

    accept monsoon.

    Rest time all

    drains become

  • 17

    detailed project report

    (DPR) for each drain and

    corresponding town

    dry.

    (c) Proper design, execution of STPs with full

    utilisation capacity

    -- -- Very small

    villages. No

    flowing water

    found around

    habitation.

    (d) Channelization including diversion of sewage

    generated from

    household/town

    ship/villages to sewer

    lines/ interception of all

    the drains presently

    carrying sewage and for

    ensuring proper treatment

    through the upcoming

    STPs

    -- -- Very small

    villages. No

    flowing water

    found around

    habitation.

    (e) Ensuring automobiles service station and

    Hotels/Restaurants

    particularly located on

    road side should have a

    treatment system and levy

    of fine case found

    violations.

    MPPCB three

    months

    Will be surveyed.

    III Ground Water Quality

    (a) Sealing of contaminated hand pumps and found to

    be unfit for drinking

    purpose by the public

    State Govt.

    /PHED /

    Municipal

    Council Sausar/

    MPPCB

    Within

    six

    months

    • Inventorisation will be done with

    PHED

    • No report of Ground water

    contamination

    received till date.

    (b) Supply of potable water to the affected Villages.

    State

    Government/PHE

    D/Gram panchyat

    -- Supplying

  • 18

    (c) Carrying assessment of ground water survey for

    quality and to identify over

    exploited

    MPPCB, PHED Within

    six

    months

    Project will be

    prepared by

    Regional Office

    M.P. Pollution

    Control Board,

    Chhindwara for

    assessment of

    ground water

    Quality in area

    (d) To conduct periodic surprise inspection of the

    industry to rule out any

    forceful injection of

    industrial effluents into

    groundwater resources

    MPPCB Within

    three

    month.

    Will be inspecting

    minutely.

    (e) All the industry should be directed to obtain NOC

    from the CGWB and

    action against the unit in

    operation without

    obtaining of NOC from

    CGWA

    MPPCB/

    CGWA/

    CGWB/PHED

    Within

    six

    months

    All units informed

    for NOC from

    CGWB.

    Action against non

    complied units.

    (f) To ensure rain water harvesting by the

    industrial, commercial and

    other institutions and

    groundwater recharging

    with only clean water to be

    encouraged

    Local bodies/

    Administration/

    MPPCB

    Within

    six

    months

    Compulsion of

    Rain water

    Harvesting by

    Municipal Council

    , will also

    encourage by PCB

    IV Flood Plan Zone (FPZ)

    (a) Plantation in Flood Plain Zone (FPZ)

    State Forest

    Department

    Within

    six

    years

    (b) Checking encroachments in the FPZ of river

    Kanhan

    District/Local

    administration /

    local municipal

    body

    Within

    one

    year

  • 19

    (c) Prohibition of disposal of municipal plastic and

    biomedical waste

    particularly in drains

    Urban Local

    bodies/ MPPCB

    Within

    three

    months

    1. Polythene carry

    bags has been

    Prohibited by the

    MP Government

    2. Biomedical

    waste generated by

    Hospital were

    collected by M/s

    Krupa waste Sivni

    & Dispose as per

    rule

    (d) Notification of Flood Plain Zone FPZ

    State Government

    / District

    administration

    Within

    three

    months

    Detailed of

    Notification of

    Flood plain zone

    are desired from

    concerning agency

    V Environmental Flow (E-Flow) and Irrigation Practices

    (a) Measurement of flow of river Kanhan and records

    maintained

    Water resource

    Department

    Within

    six

    months

    Most of the

    months Kanhan

    river became dry ( No Flow of water)

    (b) To conserve water and good irrigation practices

    to be adopted by the

    farmers by organizing

    mass awareness

    programmes and through

    media in vernacular

    language

    M.P. Water

    resource

    Department and

    Agriculture

    Departments/MPP

    CB

    Within

    six

    months

    -------x-------x--------