Entergy^ RBG-47855 August 8, 2019 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Subject: Submittal of Owner's Activity Report Form for Cycle 20 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed License No. NPF-47 Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 Tel 225-635-5000 Timothy A. Schenk Manager, Regulatory Assurance River Bend Station Pursuant to ASME Code Case N-532-5, please find enclosed the River Bend Station Cycle 20 Owner's Activity Report Form. This report reflects ASME Section XI program activities occurring between April 2017 and May 2019. If you have any questions or require further information, please contact Mr. Tim Schenk at (225) 381-4177. Sincerely, TAS/twf Enclosure: cc: Owner's Activity Report Form for Cycle 20. NRC Region IV Regional Administrator, w/o Enclosure NRC Senior Resident Inspector - River Bend Station, Unit 1 Ji Young Wiley, Department of Environmental Quality, Office of Environmental Compliance, Radiological Emergency Planning and Response Section Public Utility Commission of Texas, Attn: PUC Filing Clerk NRC Project Manager

River Bend Station, Unit 1, Submittal of Owner's Activity Report … · 2019-08-16 · Entergy^ RBG-47855 August8,2019 Attn:DocumentControlDesk U.S.NuclearRegulatoryCommission 11555RockvillePike

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: River Bend Station, Unit 1, Submittal of Owner's Activity Report … · 2019-08-16 · Entergy^ RBG-47855 August8,2019 Attn:DocumentControlDesk U.S.NuclearRegulatoryCommission 11555RockvillePike

Entergy^

RBG-47855

August 8, 2019

Attn: Document Control DeskU.S. Nuclear Regulatory Commission11555 Rockville PikeRockville, MD 20852-2738

Subject: Submittal of Owner's Activity Report Form for Cycle 20River Bend Station, Unit 1NRC Docket No. 50-458Renewed License No. NPF-47

Entergy Operations, Inc.River Bend Station5485 U.S. Highway 61NSt. Francisville, LA70775Tel 225-635-5000

Timothy A. SchenkManager, Regulatory AssuranceRiver Bend Station

Pursuant to ASME Code Case N-532-5, please find enclosed the River Bend Station Cycle 20Owner's Activity Report Form. This report reflects ASME Section XI program activitiesoccurring between April 2017 and May 2019. If you have any questions or require furtherinformation, please contact Mr. Tim Schenk at (225) 381-4177.

Sincerely,

TAS/twf

Enclosure:

cc:

Owner'sActivity Report Form for Cycle 20.

NRC Region IV Regional Administrator, w/o EnclosureNRC Senior Resident Inspector - River Bend Station, Unit 1Ji Young Wiley, Department of Environmental Quality, Office of EnvironmentalCompliance, Radiological Emergency Planning and Response SectionPublic Utility Commission of Texas, Attn: PUC Filing ClerkNRC Project Manager

Page 2: River Bend Station, Unit 1, Submittal of Owner's Activity Report … · 2019-08-16 · Entergy^ RBG-47855 August8,2019 Attn:DocumentControlDesk U.S.NuclearRegulatoryCommission 11555RockvillePike

FORM OAR-1 OWNERS ACTIVITY RF.PORT

Report Number: Cycle 20/Refueling Outage

PIant: River Bend Station. 5485 U.S. Highway 61. Saint Francisville. Louisiana 7Q77S

Unit No: i Commercial Service Date: 06/16/1986

Current Inspection Interval: 4th

Current Inspection Period: Jst

Page lof2

Refueling Outage No.: 20

Edition and Addenda of Section XI applicable to the Inspection Plans: 2007 Edition through 2008 Addend,.™Date and Revision ofInspection Plans: SEP-ISI-RBS-0Q1, Revision 003, Dated 04/7.0/701Q

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection Plans:NA

Code Cases used for inspection and evaluation: N-532-5

CERTIFICATE OF CONFORMANCE

Icertify that (a) the statements made in this report are correct; (b) the examinations and tests meet the InspectionPlan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluationssupporting the completion ofRefueling 20 conform to the requirements ofSection XI.

Orlukjy P\i'otrc( ^<^=jp=S^gr?— l rtyjtifr ^Hf **-»t <>c<r &9*/&fl i^i^Signed: Rosemary E. Crowell/ gW^ E. ^ggggfe .ASME R/R F.n.ineP,- Date: 08/08/2019

Owner or Owner's Designee, Title

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding avalid commission issued by the National Board of Boiler and Pressure VesselInspectors and employed by The Hartford Steam Boiler Inspection ajidjnsujance^ojn^any of Hartford Connecticuthave inspected the items deso^n^C^^^ ofnySwSTffbelief, the Owner has performed all activities represented by this report in accordance with the requirements ofoection Al.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or impliedconcerning the repair/replacement activities and evaluation described in this report. Furthermore, neither theInspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of anykind arising from or connected with this inspection. y

Inspector's Signature

Date: £?£/<?

Commissions: /^^ if&i(National Board Number andEndorsement)

Page 3: River Bend Station, Unit 1, Submittal of Owner's Activity Report … · 2019-08-16 · Entergy^ RBG-47855 August8,2019 Attn:DocumentControlDesk U.S.NuclearRegulatoryCommission 11555RockvillePike

FORM OAR-1 OWNERS ACTIVITY RFpTwF

Report Number: Cycle 20/Refueline Outage

Plant: River Bend Station, 5485 ITS Highway 61. .Saint P^n^nu L^f^aaTOTTgUn,t No: -L Commercial Service Date: 06/16/1986

Page 2 of 2

TABLE 1:ItemsWith Flaws or Relevant ConditionsThat Required Ev

Refueling OutageNo.: 20

ALUATION FORCONTINUED SERVICE

ExaminationCategory andItem Number

Item Description Evaluation Description

CodeClass

NONE

TABLE 2:ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE

Item Description

1.50" StandbyLiquid Control Pipe

Description of Work

During VT-2 testing a pipe leak wasdiscoveredCR-RBS-2019-02883.

Through wall leak upstream of valve C41 -VF008 in SA-312 Tp. 304L (pipe).Defective pipe section to be removed and senttoa laboratory for evaluation per IWA-3000New pipe (SA-312 Heat:544668) installedand welded in accordance with ASME SectionIX

Date

Completed

05/04/2019

Repair/ReplacementPlan Number

IS-1-19-1695