Entergy^
RBG-47855
August 8, 2019
Attn: Document Control DeskU.S. Nuclear Regulatory Commission11555 Rockville PikeRockville, MD 20852-2738
Subject: Submittal of Owner's Activity Report Form for Cycle 20River Bend Station, Unit 1NRC Docket No. 50-458Renewed License No. NPF-47
Entergy Operations, Inc.River Bend Station5485 U.S. Highway 61NSt. Francisville, LA70775Tel 225-635-5000
Timothy A. SchenkManager, Regulatory AssuranceRiver Bend Station
Pursuant to ASME Code Case N-532-5, please find enclosed the River Bend Station Cycle 20Owner's Activity Report Form. This report reflects ASME Section XI program activitiesoccurring between April 2017 and May 2019. If you have any questions or require furtherinformation, please contact Mr. Tim Schenk at (225) 381-4177.
Sincerely,
TAS/twf
Enclosure:
cc:
Owner'sActivity Report Form for Cycle 20.
NRC Region IV Regional Administrator, w/o EnclosureNRC Senior Resident Inspector - River Bend Station, Unit 1Ji Young Wiley, Department of Environmental Quality, Office of EnvironmentalCompliance, Radiological Emergency Planning and Response SectionPublic Utility Commission of Texas, Attn: PUC Filing ClerkNRC Project Manager
FORM OAR-1 OWNERS ACTIVITY RF.PORT
Report Number: Cycle 20/Refueling Outage
PIant: River Bend Station. 5485 U.S. Highway 61. Saint Francisville. Louisiana 7Q77S
Unit No: i Commercial Service Date: 06/16/1986
Current Inspection Interval: 4th
Current Inspection Period: Jst
Page lof2
Refueling Outage No.: 20
Edition and Addenda of Section XI applicable to the Inspection Plans: 2007 Edition through 2008 Addend,.™Date and Revision ofInspection Plans: SEP-ISI-RBS-0Q1, Revision 003, Dated 04/7.0/701Q
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the Inspection Plans:NA
Code Cases used for inspection and evaluation: N-532-5
CERTIFICATE OF CONFORMANCE
Icertify that (a) the statements made in this report are correct; (b) the examinations and tests meet the InspectionPlan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluationssupporting the completion ofRefueling 20 conform to the requirements ofSection XI.
Orlukjy P\i'otrc( ^<^=jp=S^gr?— l rtyjtifr ^Hf **-»t <>c<r &9*/&fl i^i^Signed: Rosemary E. Crowell/ gW^ E. ^ggggfe .ASME R/R F.n.ineP,- Date: 08/08/2019
Owner or Owner's Designee, Title
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding avalid commission issued by the National Board of Boiler and Pressure VesselInspectors and employed by The Hartford Steam Boiler Inspection ajidjnsujance^ojn^any of Hartford Connecticuthave inspected the items deso^n^C^^^ ofnySwSTffbelief, the Owner has performed all activities represented by this report in accordance with the requirements ofoection Al.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or impliedconcerning the repair/replacement activities and evaluation described in this report. Furthermore, neither theInspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of anykind arising from or connected with this inspection. y
Inspector's Signature
Date: £?£/<?
Commissions: /^^ if&i(National Board Number andEndorsement)
FORM OAR-1 OWNERS ACTIVITY RFpTwF
Report Number: Cycle 20/Refueline Outage
Plant: River Bend Station, 5485 ITS Highway 61. .Saint P^n^nu L^f^aaTOTTgUn,t No: -L Commercial Service Date: 06/16/1986
Page 2 of 2
TABLE 1:ItemsWith Flaws or Relevant ConditionsThat Required Ev
Refueling OutageNo.: 20
ALUATION FORCONTINUED SERVICE
ExaminationCategory andItem Number
Item Description Evaluation Description
CodeClass
NONE
TABLE 2:ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE
Item Description
1.50" StandbyLiquid Control Pipe
Description of Work
During VT-2 testing a pipe leak wasdiscoveredCR-RBS-2019-02883.
Through wall leak upstream of valve C41 -VF008 in SA-312 Tp. 304L (pipe).Defective pipe section to be removed and senttoa laboratory for evaluation per IWA-3000New pipe (SA-312 Heat:544668) installedand welded in accordance with ASME SectionIX
Date
Completed
05/04/2019
Repair/ReplacementPlan Number
IS-1-19-1695