14
RIVENWOOD PHASE 2, NEWTOWNARDS TRANSPORT

RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

  • Upload
    hanhi

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

RIVENWOOD PHASE 2, NEWTOWNARDS

TRANSPORT

Page 2: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

TABLE OF CONTENTS

1. AM BASE TRAFFIC FLOWS 3

2. PM BASE TRAFFIC FLOWS 3

3. TRIP GENERATION – PHASE 2 3

4. ACCESS JUNCTION ASSESSMENT 3

5. ACCESS JUNCTION DESIGN OPTIONS 3

Page 3: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

0 0

A21 Bangor Road 0 A48 Donaghadee Road

0 NS21 0

0 0 0 EDR 0

0

0 0

0 0

0

0

0

0

NS20

EDR

Stratheden Heights

96 56 31 0 0 0

89 0

645 325 202 204

237 11 89 122 0

3 44 636 126 355

0 409 17 0 Movilla Road

35 392 21 23 273 378 396

92 116 40 38 101 0 0 0 0

55

0

0 AM Base

176

240 Old Movilla Road figure759

61 479 426 0

Zion Place

NS19

EDR

Abbot Drive

1

Page 4: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

0 0

A21 Bangor Road 0 A48 Donaghadee Road

0 NS21 0

0 0 0 EDR 0

0

0 0

0 0

0

0

0

0

NS20

EDR

Stratheden Heights

99 48 56 0 0 0

125 0

388 578 346 304

576 36 23 74 0

1 13 407 149 647

1 351 21 0 Movilla Road

65 365 51 68 30 194 209

205 80 81 62 37 0 0 0 0

29

0

2 PM Base

148

83 Old Movilla Road figure525

12 458 855 0

Zion Place

NS19

EDR

Abbot Drive

2

Page 5: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Trip Generation - Rivenwood Phase 2 (204 dwellings)

People Trips 204

In Out Two-Way In Out Two-Way

People Trip Rate 0.381 1.238 1.619 0.769 0.548 1.317

People Trips 78 253 330 157 112 269

Any variance due to rounding

Mode Share of Phase 2 Residential

Travel Mode Share

Walk 10%

Cycle <1%

Bus, minibus or coach 13%

Train <1%

Car passenger 16%

Car driver 51%

Other 9%

Total 100%

People Trips by Mode

In Out Two-Way In Out Two-Way

Walk 8 25 33 16 11 27

Cycle 0 1 1 1 0 1

Bus, minibus or coach 10 33 43 20 15 35

Train 0 2 2 1 1 2

Car passenger 12 40 53 25 18 43

Car driver 40 129 168 80 57 137

Other 7 23 30 14 10 24

Total 78 253 330 157 112 269

Any variance due to rounding

Trip Generation

figure 3

AM Peak PM Peak

AM Peak PM Peak

Page 6: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Rivenwood Phase 2

Movilla Road / Rivenwood Boulevard

Systra Ltd has undertaken a capacity assessment of the proposed signal

controlled access junction to the development from Movilla Road. This is to

ensure that the traffic generated by Phase 1 (100 units) and Phase 2 (204 units)

can be accommodated by the proposed junction design. The assessment has

been undertaken using the industry-standard software package, “LinSig 3”.

The table below provides the results of our modelling exercise. The results

include the Degree of Saturation (DoS) and Mean Maximum Queue (MMQ) for

each lane while the overall Practical Reserve Capacity (PRC) and junction delay

are provided. A DoS of less than 90% indicates that the lane will operate within

practical capacity while a positive PRC indicates that the junction as a whole will

operate within capacity.

Lane Description AM Peak PM Peak

DoS MMQ DoS MMQ

1/1 Movilla Rd (W)

Ahead Left 24.4% 5 32.1% 6

2/1 + 2/2 Movilla Rd (E) Ahead Right

40.7% 8 19.6% 3

3/2 + 3/1 Rivenwood B’vard Left

Right 40.5% 4 32.2% 2

Junction PRC Delay PRC Delay

120.9% 5.87pcuHr 179.3% 3.40pcuHr

The results presented in the table above demonstrate that the proposed signal

controlled access junction to the development from Movilla Road will operate

well within capacity during both the weekday AM and PM peak period with

ample Practical Reserve Capacity.

A more detailed summary of the results has also been provided (see LinSig

Summary).

Page 7: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Basic Results Summary

Basic Results Summary User and Project Details

Project: SCT4173_NewtownardsResidentialPhase2

Title: Movilla Road / Rivenwood Boulevard

Location:

File name: Movilla Road_Rivenwood Boulevard.lsg3x

Author: greenj

Company: Systra Ltd

Address:

Notes:

Scenario 1: '2017 AM Base plus Phase 1 & 2 (304 Units)' (FG3: '2017 AM Base plus Phase 1 & 2 (304 Units)', Plan 2: 'Phase 2 Not Called')

Network Layout Diagram

Page 8: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Basic Results Summary

Network Results

Item Lane Description

Lane Type

Full Phase

Arrow Phase

Num Greens

Total Green (s)

Arrow Green (s)

Demand Flow (pcu)

Sat Flow (pcu/Hr)

Capacity (pcu)

Deg Sat (%)

Turners In Gaps (pcu)

Turners When Unopposed (pcu)

Turners In Intergreen (pcu)

Total Delay (pcuHr)

Av. Delay Per PCU (s/pcu)

Mean Max Queue (pcu)

Network: Movilla Road /

Rivenwood Boulevard

- - - - - - - - - 40.7% 15 0 0 5.9 - -

Movilla Road / Rivenwood Boulevard

- - - - - - - - - 40.7% 15 0 0 5.9 - -

1/1 Movilla Road West Ahead

Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6

2/1+2/2 Movilla Road East Ahead

Right U+O B E 1 64 0 428 1915:1824 1014+37

40.7 : 40.7%

15 0 0 2.3 19.0 8.4

3/2+3/1 Rivenwood

Boulevard Left Right

U C F 1 25 0 190 1848:2080 349+121 40.5 : 40.5%

- - - 2.4 45.7 4.3

C1 PRC for Signalled Lanes (%): 120.9 Total Delay for Signalled Lanes (pcuHr): 5.87 Cycle Time (s): 120 PRC Over All Lanes (%): 120.9 Total Delay Over All Lanes(pcuHr): 5.87

Page 9: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Basic Results Summary Scenario 2: '2017 PM Base plus Phase 1 & 2 (304 Units)' (FG6: '2017 PM Base plus Phase 1 & 2 (304 Units)', Plan 2: 'Phase 2 Not Called')

Network Layout Diagram

Page 10: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

Basic Results Summary

Network Results

Item Lane Description

Lane Type

Full Phase

Arrow Phase

Num Greens

Total Green (s)

Arrow Green (s)

Demand Flow (pcu)

Sat Flow (pcu/Hr)

Capacity (pcu)

Deg Sat (%)

Turners In Gaps (pcu)

Turners When Unopposed (pcu)

Turners In Intergreen (pcu)

Total Delay (pcuHr)

Av. Delay Per PCU (s/pcu)

Mean Max Queue (pcu)

Network: Movilla Road /

Rivenwood Boulevard

- - - - - - - - - 32.2% 30 0 1 3.4 - -

Movilla Road / Rivenwood Boulevard

- - - - - - - - - 32.2% 30 0 1 3.4 - -

1/1 Movilla Road West Ahead

Left U A 1 77 - 405 1940 1261 32.1% - - - 1.3 11.4 6.2

2/1+2/2 Movilla Road East Ahead

Right U+O B E 1 77 0 249 1915:1824 1112+158

19.6 : 19.6%

30 0 1 0.7 10.4 3.0

3/2+3/1 Rivenwood

Boulevard Left Right

U C F 1 12 0 85 1848:2080 196+68 32.2 : 32.2%

- - - 1.4 59.2 2.2

C1 PRC for Signalled Lanes (%): 179.3 Total Delay for Signalled Lanes (pcuHr): 3.40 Cycle Time (s): 120 PRC Over All Lanes (%): 179.3 Total Delay Over All Lanes(pcuHr): 3.40

Page 11: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647
Page 12: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

4

8

.0

4

8

.0

48.5

4

8

.

5

49.0

4

9

.

0

4

9

.5

4

9

.

5

5

0

.0

5

0

.

0

5

0

.0

5

0

.

0

5

0

.5

5

0

.

5

5

0

.

5

5

0

.

5

5

0

.5

5

1

.0

5

1

.

0

5

1

.

0

5

1

.

0

5

1

.5

5

1

.

5

5

1

.

5

52.0

5

2

.

0

5

2

.

0

52.5

5

2

.

5

5

2

.

5

5

3

.

0

5

3

.

0

5

3

.

0

5

3

.

5

5

3

.

5

5

3

.

5

5

3

.

5

53.5

5

4

.

0

5

4

.

0

5

4

.

0

5

4

.

0

5

4

.

0

5

4

.

5

5

4

.

5

54.5

5

4

.

5

55.0

5

5

.

0

5

5

.

0

5

5

.

5

5

5

.5

55.5

5

6

.

0

5

6

.0

5

6

.0

5

6

.

5

5

6

.

5

5

6

.5

5

7

.

0

5

7

.

0

57.0

5

7

.

5

5

7

.5

5

8

.0

351350

351400

351450

351500

351550

351600

LP

LP

LP

EP

EP

EP

TP

TP

RS

RS

RS

RS

SV

AV

AV

A

N

B

C

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

G

Y

T

M

H

T

M

H

T

M

H

C

O

N

I

F

E

R

S

LEVELS RELATED TO OS DATUMSCT3704/MR/SK001

Movilla Road, Newtownards

Drawn - DD Checked - CR Date - May 2014

250 West George Street,

Glasgow,

G2 4QY

T 0141 221 4030

F 0800 066 4367

E [email protected]

W www.jmp.co.uk

Page 13: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647
Page 14: RIVENWOOD PHASE 2, NEWTOWNARDS … Ahead Left U A 1 64 - 256 1940 1051 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right ... Andheri East , Mumbai 400069 T: +91 22 2647

SYSTRA provides advice on transport, to central, regional and local government, agencies, developers, operators and financiers.

A diverse group of results-oriented people, we are part of a strong team of professionals worldwide. Through client business planning, customer research and strategy development we create solutions that work for real people in the real world.

For more information visit www.systra.co.uk

Birmingham 5th Floor, Lancaster House, Newhall St, Birmingham, B3 1NQ T: +44 (0)121 233 7680 F: +44 (0)121 233 7681

Dublin 2nd Floor, Riverview House, 21-23 City Quay Dublin 2,Ireland T: +353 (0)1 542 6000 F: +353 (0)1 542 6001

Edinburgh Prospect House, 5 Thistle Street, Edinburgh EH2 1DF United Kingdom T: +44 (0)131 220 6966

Glasgow Seventh Floor, 124 St Vincent Street Glasgow G2 5HF United Kingdom T: +44 (0)141 225 4400

Lille 86 Boulevard Carnot, 59000 Lille, France T: +33 (0)3 74 07 00 F: +33 (0)1 53 17 36 01

London Seventh Floor, 15 Old Bailey London EC4M 7EF United Kingdom T: +44 (0)20 7529 6500 F: +44 (0)20 3427 6274

Lyon 11, rue de la République, 69001 Lyon, France T: +33 (0)4 72 10 29 29 F: +33 (0)4 72 10 29 28

Manchester 25th Floor, City Tower, Piccadilly Plaza Manchester M1 4BT United Kingdom T: +44 (0)161 236 0282 F: +44 (0)161 236 0095

Marseille 76, rue de la République, 13002 Marseille, France T: +33 (0)4 91 37 35 15 F: +33 (0)4 91 91 90 14

Newcastle PO Box 438, Newcastle upon Tyne, NE3 9BT United Kingdom T: +44 (0)191 2136157

Paris 72 rue Henry Farman, 75015 Paris, France T: +33 (0)1 53 17 36 00 F: +33 (0)1 53 17 36 01

Woking Dukes Court, Duke Street Woking, Surrey GU21 5BH United Kingdom T: +44 (0)1483 728051 F: +44 (0)1483 755207

Hong Kong 14th Floor West, Warwick House, TaiKoo Place, 979 King's Road, Island East, Hong Kong T: +852 2529 7037 F: +852 2527 8490

Shenzhen Room 905, Excellence Mansion, No.98, No.1 Fuhua Road,

Futian Central Zone, Shenzhen, PRC, Post Code:518048

T:+86 755 3336 1898 F:+86 755 3336 2060

Shenzhen - Beijing Branch Office Room 1503, Block C, He Qiao Mansion, No. 8 Guanghua Road,

Chaoyang District, Beijing, PRC, Post Code:100026

T:+86 10 8557 0116 F:+86 10 8557 0126

Beijing Joint Venture Room 1507, Main Building, No. 60, Nan Li Shi Road,

Xi Cheng District, Beijing, PRC, Post Code:100045

T:+86 10 8807 3718 F:+86 10 6804 3744

Mumbai Antriksh, Unit no. 301, 3rd Floor, CTS Nos. 773, 773/1 to 7, Makwana Road, Marol, Andheri East , Mumbai 400069 T: +91 22 2647 3134 B 307, Great Eastern Summit Sector - 15, CBD Belapur Navi Mumbai - 400 614 T: +91 22 2757 2745

New Delhi 5th Floor Guru Angad Bhawan, 71 Nehru Place, New Delhi 110019 T: +91 11 2641 3310

Noida 3/F, C-131, Sector 2, Noida-201301, U.P. T: +91 120 432 6999

Singapore 25 Seah Street #04-01 Singapore 188381

T:+65 6227 3252 F:+65 6423 0178

Thailand 37th Floor, Unit F, Payatai Plaza Building,128/404-405 Payathai Road, Rajthewee, Bangkok 10400, Thailand

T:+662 216 6652 F:+662 216 6651

Vietnam 5/F Perfect Building, Le Thi Hong Gam St, District 1, Ho Chi Minh City, Vietnam

T:+84 8 3821 7183 F:+84 8 3821 6967