CITY OF PAWTUCKET RHODE ISLAN D DEPARTMENT OF PLANNING AND REDEVELOPMENT DONALD R. GREBI EN MAYOR January 8, 2015 Rhode Island Statewide Planning Program Attn: Kimberly Crabill One Capitol Hill Providence, RI 02908 SUBJECT: City of Pawtucket FY17-25 TIP Submission Dear Ms. Crabill: BARNEY S. HEATH DI RECTOR Please find enclosed three (3) copies of the City of Pawtucket FY17-25 TIP submission package. Sincerely, ~ i··· fa-~~ - Barney . ath Plannin rector BSH:mb Enclosures cc: Mayor Donald R. Grebien, City of Pawtucket Dylan Zelazo, Chief of Staff, City of Pawtucket Norm Lamoureux, Department of Public Works, City of Pawtucket PA Wf UCKET CITY HALL 137 ROOSEVELT AVENUE, PAWl'UCKET, RI 02860-2129 (401) 728-0500 • T DD (401) 722-8239 www.pawtucket ri . com

RHODE ISLAND TIP.pdfCITY OF PAWTUCKET RHODE ISLAND DEPARTMENT OF PLANNING AND REDEVELOPMENT DONALD R. GREBIEN MAYOR January 8, 2015 Rhode Island Statewide Planning Program

Embed Size (px)

Citation preview

CITY OF PAWTUCKET RHODE ISLAND

DEPARTMENT OF PLANNING AND REDEVELOPMENT

DONALD R. GREBI EN MAYOR

January 8, 2015

Rhode Island Statewide Planning Program Attn: Kimberly Crabill One Capitol Hill Providence, RI 02908

SUBJECT: City of Pawtucket FY17-25 TIP Submission

Dear Ms. Crabill:

BARNEY S. HEATH DIRECTOR

Please find enclosed three (3) copies of the City of Pawtucket FY17-25 TIP submission package.

Sincerely,

~ i···fa-~~-Barney . ath Plannin rector

BSH:mb

Enclosures

cc: Mayor Donald R. Grebien, City of Pawtucket Dylan Zelazo, Chief of Staff, City of Pawtucket Norm Lamoureux, Department of Public Works, City of Pawtucket

PA WfUCKET CITY HAL L 137 ROOSEVELT AVENUE, PAWl'UCKET, RI 02860-2129

(40 1) 728-0500 • TDD (401) 722-8239 www.pawtucketri .com

Project Prioritization Cover Sheet

Transportation Improvement Program

Contact Information

RI SPP

~,,

Agency/Organization -=C=--=it""y'--o"'fccP'--'a"-'w'--'t=u=ck=e=--=t,_, R=I _____________________ _

Contact Person -=Bccan=1e~y'---H=e"'-at=h'---------- Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket Zip Code -=0:::2c:8cc60=------------­

Email [email protected] Phone 401-728-0500, ext. 430

Project Prioritization please use an additional sheet if necessary Page 1 of 5

Priority

High

High

High

High

High

High

High

High

High

High

High

High

High

Listed in TIP 2013-2016

Yes No Project Name

X Pawt./C.F. Rail Station Final Design/Construction (NPA #1)*

X Slater Mill Phase II (NPA #2)*

X Exchange Street Enhancements (NPA #3)*

X Blackstone River Bikeway - Segment 3A (NPA #4)*

X Blackstone River Bikeway - Segment 3B (NPA #5)*

X Ten Mile River Greenway Bikeway Phase II (NPA #6)*

X Hazard Elimination - Central Ave./George Bennett Highway

X Hazard Elimination - Lonsdale A ve./Weeden Street

X Pavement Management - Newport Ave./Federal St. North to Mass Line

X Pavement Management - Newport Ave./Federal St. South to Pawt. Ave.

X Pavement Management - Pawtucket Ave./Garden St. South to Prov.

X Pavement Management - Lonsdale Ave.

X Pavement Management - Broad St. - Exchange St. North to Cumberland

Applicant Certification

• The information provided on this application is in accordance with local regulations and ordinances.

Title

Date

* New Project Application attached

STATE PLANNING COUNCIL [ One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Project Prioritization Cover Sheet

Transportation Improvement Program

Contact Information

Agency/Organization

Contact Person ____________ _

RI SPP

~~

Title _______________ _

• Mailling Address --------------------------------

City Zip Code

Phone Email

Project Prioritization please use an additional sheet if necessary Page 2 of 5

Priority

High

High

High

Medium

Medium

Medium

Medium

Medium

Medium

Medium

Medium

Medium

Medium

Listed in TIP 2013-2016

Yes No Project Name

X Study and Design-Main St Two-Way Conversion-High to Dexter(NPA #7)*

X Study & Design-Bdwy Two-Way Conversion-Main to Exchange(NPA #8)*

X Study and Design - School Safety Improvements (NP A #9)*

X Study and Design - Goff/Exchange/Broad/North Union/Summer (NPA#IO)*

X Broad Street Complete Street (NPA #11)*

X Bridge Management - Cole Street Bridge (NPA #12)*

X Study &Design - George Bennett Hwy Ped./Bikeway Improv.(NPA #13)*

X Roadway Departure Mitigation Surface Treatment

X Bridge - Roosevelt Ave. Bridge at Blackstone River

X Bridge - Pine Street Bridge at I-95 NB & SB

X Bridge - Water Street Bridge, I-95 NB & SB

X Bridge - Main Stl'eet Bridge at I-95 NB & SB

X Bridge - Underwood Street Bridge at I-95 NB & SB

Applicant Certification

• The information provided on this application is in accordance with local regulations and ordinances.

Title

Date

* New Project Application attached STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Project Prioritization Cover Sheet

Transportation Improvement Program

Contact Information

Agency/Organization ------------------------------

Contact Person ____________ _ Title _______________ _

• Mailling Address --------------------------------City ________________ _ Zip Code ______________ _

Phone---------------~ Email _______________ _

Project Prioritization please use an additional sheet if necessary Page 3 of 5

Priority

Medium

Medium

Medium

Medium

Medium

Medium

Low

Low

Low

Low

Low

Low

Low

Listed in Tl P 2013-2016

Yes No

X

X

X

X

X

X

X

X

X

X

X

X

X

Applicant Certification

Project Name

Bridge - Main Street Bridge at Blackstone River

Bridge - Main Street Stringer Span at Blackstone River

Bridge - Walcott Street Bridge at I-95 NB & SB

Bridge - Exchange Street Bridge at I-95 NB & SB

Bridge - Morris Nathanson Bridge (Exchange St.) at Blackstone River

Bridge - Division Sti-eet Bridge at Seekonk River

Bridge - Lebanon Bridge, Central A venue at Ten Mile River

Bridge - Moshassuck River Culvert, I-95 NB & SB at Moshassuck River

Bridge - Pleasant View RR NB, I-95NB at Pleasant View St. & Amtrak

Bridge - Grotto Ave. Bridge at Moshassuck River

Bridge - Weeden Street Bridge at Moshassuck River

Bridge - Slater Street Bridge at I-95 NB & SB

Bridge - Lonsdale Ave. Bridge at I-95 NB & SB

The information provided on this application is in accordance with local regulations and ordinances.

Title

Date

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

RI Project Prioritization Cover Sheet

~~~ Transportation Improvement Program

Contact Information Agency/Organization ___________________________ _

Contact Person ____________ _ Title ______________ _

• Mailling Address ------------------------------1

City Zip Code _____________ _

Phone Email ______________ _

Project Prioritization please use an additional sheet if necessary Page 4 of 5

Priority

Low

Low

Low

Low

Low

Low

Low

Low

Low

Low

Low

Listed in TIP 2013-2016

Yes No

X

X

X

X

X

X

X

X

X

X

X

Applicant Certification

Project Name

Bridge - Broadway Bridge at I-95 NB & SB

Bridge - East Street SB Ramp at I-95 SB

Bridge - Central Ave. Bridge at I-95 NB & SB

Bridge - Pleasant View RR SB Ramp at I-95 SB

Bridge - Roosevelt Ave. SB at I-95 SB

Bridge - Roosevelt Ave. NB at I-95 NB

Bridge - Mineral Spring Ave. Bridge at Moshassuck River

Bridge - Lonsdale Ave. RR Bridge

Bridge - East Street NB at 1-95 NB

Resurfacing 1-95 (Barbara Leonard to Mulberry)

Resurfacing 1-95 (Rt. 15 to Mass.)

The information provided on this application is in accordance with local regulations and ordinances.

Title

Date

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Project Prioritization (continued)

Priority

Listed in TIP 2013-2016

Yes No Project Name

Required Public Hearing

Page 5 of 5

The required public hearing was held on Tuesday, December 15, 2015

Applicant Certification

The information provided on this application is in accordance with local regulations and ordinances.

City of P tucket Donald R. Grebien, Mayor

Title

January 7, 2016

Date

Submittal Checklist

@ 3 collated copies of complete TIP submittal package

@ Project Prioritization Cover Sheet

@ New Project Application Form for each new project

@ 2-page narrative on evaluation criteria

@ 8.5 11 x 1111 PDF map of project location

@ Email a copy of complete TIP submittal package to l<[email protected] or provide on a CD

@ Submit complete TIP submittal package to:

Rhode Island Statewide Planning Program ATTN: Kimberly Crabill One Capitol Hill Providence, RI 02908

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

New Project Application

Transportation Improvement Program

Contact Information

RI ~.SPP ~/

Agency/Organization _C_i~ty~of_P_a_w_tu_c_k_et _______________________ _

Contact Person Barney Heath --~---------- Title Planning Director

• Mailling Address _1_7_5_M~ai=n~S~tr~·e~e~t __________________________ ,

City Pawtucket

Phone 401-728-0500

Type of Project select all that apply

D Bridge D Pavement

D Traffic 6!'.] Transit

D Transportation Enhancement

Project Description

Zip Code ...:Oc:::2::c:8=25::__ _________ _

Email [email protected]

D Drainage

D Bicycle

D Planning

D Pedestrian

D Other ______________ _

Project Title Pawtucket/Central Falls Commuter Rail Station (NPA #1)

Location by Street Name Goff Avenue/Barton Street

Project Limits - From

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

The cities of Pawtucket and Central Falls are working to re-establish commuter rail service at a site near their shared border - between Goff Avenue and Dexter Street. The project has gone through a feasibility study, which determined that a majority ofMBTA commuter rail tr·ains could stop at this location without impacting existing META or Amtrak service. Cmrently, 30 % design plans are being prepared. The project will be ready to enter final design in 2016.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $53 million

Amount Requested through TIP Process $40 million

Is there funding from other sources committed to this project? 0 Yes D No

Source Amount

Local match for design by Pawtucket and Central Falls $600,000

Total $600,000

Estimated date of construction _2_0_25 _ _ _ _ _

Date I I

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

Pawtucket/Central Falls Commuter Rail Station

Mobility Benefits

This project improves the function of commuter rail service in Rhode Island, by offering an alternative location for MBTA service to Boston, and provides a rail connection between Pawtucket and Providence. Pawtucket and Central Falls together represent a densely populated urban node, with a combined population of nearly 100,000. This is the second largest urban center in the state of RI, and the largest urban center along the northeast corridor between Boston and Providence without direct access to commuter rail.

The cities are working with RIPTA to ensure that there are linkages between bicycle and rail service, and will work to ensure that there are safe and accessible pedestrian and bicycle connections. This project is the result of a partnership between the cities of Pawtucket and Central Falls. The cities believe that the station will benefit the residents of both cities, and the proposed station is located in an area with low car ownership (insert stats). The ridership projections are for 1,500-1,900 riders per day. These figures come from a 2005 Feasibility Study completed by the City of Pawtucket and RIDOT. The Providence line of the Commuter Rail is the most heavily-traveled of all MBTA Commuter Rail lines. Parking at both Providence and South Attleboro is constrained.

Supports Local and State Goals

This project is the top transportation priority for the cities of Pawtucket and Central Falls.

The City of Pawtucket Comprehensive Plan references the proposed station in several chapters. Both the Transportation and Economic Development chapters include a specific action item to move the project forward:

• T 3 Work with RIDOT and FTA to advance the Pawtucket/Central Falls Commuter Rail Station.

• ED 8 Work with RIDOT and FTA to advance the Pawtucket/Central Falls Commuter Rail Station.

The Land Use Chapter includes two specific action items related to maximizing the station's potential economic benefits:

• LU3Review the Zoning within Yz mile of the proposed Train Station to allow appropriate Transit-Oriented-Development.

• LU2Designate an area of Pawtucket, potentially the downtown and the area around the proposed Train Station, as a Growth Center.

The City of Central Falls' Comprehensive Plan calls for train service as a key element of its Economic Development program: "The City should work jointly with Pawtucket to pursue the redevelopment of the PawtuckeUCentral Falls train depot as an intermodal transportation project. .. An intermodal transportation development would provide a tremendous economic development catalyst to adjacent areas in Central Falls and Pawtucket."

Economic Development

This project is located adjacent to 1 million square feet of vacant and under-utilized historic mill buildings, as well as to downtown Pawtucket. Introduction of the Commuter Rail project has the potential to positively impact the redevelopment opportunities for both of these areas.

Equity

This project enhances access to the transportation network in a neighborhood that has a high percentage of minority residents, low-income neighborhood residents and Limited English Proficiency residents (see following table). Pawtucket and Central Falls also have some of the lowest rates of car ownership per household in the state and therefore have a great need for multi-modal public transportation infrastructure.

The "Station Area" includes all of Central Falls as well as the Growth Center within the City of Pawtucket and is comprised of Census Tracts 152, 160, 166, 167, 171, and 108, 109,110,111.

Station Area City of City of State Nation Central Falls Pawtucket

Population: 34,8851 19,3852 71,1482 1,052,5672 308,745,5382

Unemployment Rate: 13.4% 13.63 12.1%3 10.5%3 8.23

0/o in Poverty: 29.0%1 27.01 18.7%1 13.2%1 14.9%1

o/o Non-white: 40.6%1 33.1%' 33.5%1 18.6%1 26.7%1

% Hispanic 48.0%2 60.3%2 19.7%2 12.4%2 16.3%2

Median Household Income: $29,1221 $29,2681 $40,3831 $56,1021 $53,0461

% Speaks English less than 37.7%1 39.4%1 17.4%1 8.8%1 8.7%1

''V erv well" % Adults with Bachelor's 10.9%1 7.4%' 18.9%1 30.3%1 28.5%1

Deeree or Higher 1 Data is from the 2008-2012 American Community Survey, 5 year estimates 2 2010 U.S. Census, http://www.census.gov/. 3 National data is from the Bureau of Labor Statistics, state & local data from the Rhode Island Department of Labor. 2012 average 4 Data is from the 2012 I<ids Count Factbook.

J. IN I ti" 1" .... .11 L 111.'lt~

COMMUTER RAIL PROJECT RIDOT TIP Application Pawtucket, RI o 190 380 760 1,140 1,520

Feet ------ -- N

New Project Application RI

~SPP

~""---/ ~/ Transportation Improvement Program

Contact Information Agency/Organization _C_i~ty_o_f_P_a_w_tu_c_k_e_t _____________________ _

contact Person _B_ar_~_1e~y_H_ea_th ________ Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket Zip Code _0_2_8_6_0 ___________ _

Phone 401-728-0500, ext. 440 Email [email protected]

Type of Project select all that apply

D Bridge

D Traffic

D Pavement

D Transit

D Drainage

D Bicycle

D Planning

D Pedestrian

0 Transportation Enhancement D Other --------------~

Project Description Project Title Slater Mill Phase II (NPA #2)

Location by Street Name _R_o_o_se_v_e_lt_A_v_e_n_ne ____________________ _

Project Limits - From _S"'la'-'-te'-"r---=M~il"---1--------- To Leather Street

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

New widened sidewalk/bikepath in front of Slater Mill. New parking lot with lighting. This project is at 90% design funded with $100,000 in City of Pawtucket funding. This project was on the previous FFY13-16 TIP.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

This project is sorely needed as part of a new "front door" for visitors to Rhode Island's National Park -Blackstone Valley National Historic Park.

Describe anticipated municipal or state transportation network or economic development benefits:

A new "front door" consisting of a widened sidewalk/bikepath and parking area will complement efforts to attract visitors to Slater Mill - the heart of the new Blackstone Valley National Historic Parle

Is the project consistent with the local Comprehensive Plan? Ii] Yes D No

Is the project on the Federal Aid System? Ii] Yes D No

Is the project on the National Highway System? Ii] Yes D No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding • Principles" for more information . Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 2. Cost Effectiveness 3. Economic Development 4. Environmental Impact

Project Estimates

Estimated Project Costs

5. Supports Local and State Goals 6. Safety and Security

7. Equity

Total Cost $750,000

Amount Requested through TIP Process $500,000

Is there funding from other sources committed to this project? 0 Yes D No

Source Amount

City of Pawtucket CDBG Design/Construction Adrnin $150,000

City of Pawtucket Construction $100,000

Total $250,000

Estimated date of construction April 2017

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

~ r.l

Pawtucket J, , ~. I , f f ',•\)I I I IUl-1

LOCUS MAP SLATER MILL PH. II PROJECT RIDOT TIP Application

580 870 Pawtucket, RI o 145 290 1,160

Feel ---- --- - N

RI New Project Application

.~ Transportation Improvement Program

Contact Information Agency/Organization ...-:Cccie,,tyc_o:'._'.fc__:Pc__:a::.:w.:..:t=u=d=ce::.:t:.__ ______________________ _

Contact Person _B---'ar---'---'ne~y'---"--'H=e.::ath=--------- Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket Zip Code _0_2_8_60 ___________ _

Phone 401-728-0500, ext. 440 Email [email protected]

Type of Project

D Bridge

D Traffic

select all that apply

D Pavement

D Transit

D Drainage

D Bicycle

D Planning

D Pedestrian

li'.1 Transportation Enhancement D Other ______________ _

Project Description Project Title Exchange Street Enhancements (NP A #3)

Location by Street Name -=E:::.x:..:c.::h.:can""g"'e'---S-'--t"'r-'---ee'---t ______________________ _

Project Limits - From _R_o_o_s_ev_e_lt_A_v_en_u_e _______ _ To Broadway

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Sidewalk replacement, crosswalks, street trees and uplighting. The project is at the 90% design stage. This project was included on the FFY13-16 TIP.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

The sidewalks are in need of replacement - increased pedestrian activity includes high school, Gamm Theatre, Pawtucket Annory, 55 residential units at Riverfront Lofts and new Design Exchange Building.

Describe anticipated municipal or state transportation network or economic development benefits:

This project is in the heart of the Annory Arts District and will further complement existing and planned investment for the district.

Is the project consistent with the local Comprehensive Plan? 0 Yes D No

Is the project on the Federal Aid System? 0 Yes D No

Is the project on the National Highway System? 0 Yes D No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information . Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost

Amount Requested through TIP Process $500,000

Is there funding from other sources committed to this project? D Yes D No

Source Amount

City of Pawtucket CDBG Construction $100,000

Total $600,000

Estimated date of construction April 2017

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

CENTRAL FALLS

A ~

Pawtucket ,. ,~. r ,F F'-' ' ", 111 ,,.

LOCUS MAP EXCHANGE ST STREETSCAPE PROJECT RIDOT TIP Application Pawtucket, RI o 237.5 475 950 1,425 1,900

Feet ---- --- - -- N

RI New Project Application

~" Transportation Improvement Program

Contact Information Agency/Organization _C_i~ty_o_f_P_a_wtu __ cl_ce_t ______________________ _

_ Contact Person _B_a_rn_e~y_H_ea_t_h ________ Title Planning Director

• Mailling Address _1_7_5_M_a_i_n_S_tr_e_e_t ________________________ _

City Pawtucket

Phone 401-728-0500

Type of Project select all that apply

D Bridge D Pavement

D Traffic D Transit

D Transportation Enhancement

Project Description

Zip Code _0_2_8_25 ___________ _

Email [email protected]

D Drainage

0 Bicycle

D Planning

D Pedestrian

D Other ______________ _

Project Title Blackstone Valley Bikeway- Segment 3A (NPA #4)

Location by Street Name _P_aw_tu_c_k_e_t _______________________ _

Project Limits - From _T_o_w_n_L_an_d_i_ng~-------- To Branch Street

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Segment 3A is the southern segment of the Blackstone Valley Bikeway. The southern terminus of the Blackstone Valley Bikeway is Town Landing in Pawtucket. Segment 3A of the Bikeway begins at Town Landing and goes north to Central A venue in Pawtucket.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 [ www.planning.ri.gov

Describe need for proposed project:

The Blackstone Valley Bikeway will ulimately connect Pawtucket, Rhode Island to Worcester, Massachusetts. Some of the Rhode Island portions of the Bikeway have been constructed, and the Pawtucket segment is the southern-most terminus, which also links the Blackstone Valley Bikeway with the East Bay Bikepath. The City of Pawtucket has already constructed a small segment of the Bikeway, behind Pawtucket City Hall.

Describe anticipated municipal or state transportation network or economic development benefits:

Slater Mill, in downtown Pawtucket has recently been designated as a site within the new National Parle The Bikeway will directly link to the Slater Mill site, and will enable visitors to access other portions of the National Park, as well as other tourist attractions, by bike.

The Bikeway also links the downtown to the Riverfront in Pawtucket, and provides an amenity which helps the City in its efforts at revitalization.

Is the project consistent with the local Comprehensive Plan? 0 Yes D No

Is the project on the Federal Aid System? D Yes 0 No

Is the project on the National Highway System? D Yes 0 No

I

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $6 million

Amount Requested through TIP Process $5 million

Is there funding from other sources committed to this project? Ii] Yes D No

Source Amount

Local match for design by Pawtucket $1 million

Total $1 million

Estimated date of construction _2_0_25 ____ _

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

CENTRAL FALLS

A ~

Pawtucket J.,IN [ , f. f •, 1, Ji' llQN

LOCUS MAP BLACKSTONE VALLEY BIKEWAY SEG. 3A RIDOT TIP Application

950 1,425 Pawtucket, RI a 237.5 475 1,900

Feet - - --- ---- - - N

RI New Project Application

Transportation Improvement Program ~SPP

~~ . ~

Contact Information

Agency/Organization _C=i~tyLCCof=-P=-a=-w-'-t-=u-=c-=k=-et'---------------------------

Contact Person _B_ar_1_1e~y~H_e_ath ________ _ Title Planning Director

• Mailling Address -"1-'-7=-5-=M=ai=nc..:S:..:trc.:·e:.::ecct _________________________ _

City Pawtucket

Phone 401-728-0500

Type of Project select all that apply

D Bridge

D Traffic

D Pavement

D Transit

D Transportation Enhancement

Project Description

Zip code ~0=-=2:.::8=2=-5 ___________ _

Email [email protected]

D Drainage

Ii'.] Bicycle

D Planning

D Pedestrian

D Other ______________ _

Project Title Blackstone Valley Bikeway - Segment 3B (NP A #5)

Location by Street Name _P_a_w_t_uc_k_e_t ________________________ _

Project Limits_ From Central Avenue To -=B-=r-=an=-c=h=-S=-tr=ee=t'----------

P/ease include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Segment 3 is the southern segment of the Blackstone Valley Bikeway. The southern terminus of the Blackstone Valley Bikeway is Town Landing in Pawtucket. Segment 3B of the Bikeway begins at Central Avenue in Pawtucket, and travels north to Branch Street.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

The Blackstone Valley Bikeway will ulimately connect Pawtucket, Rhode Island to Worcester, Massachusetts. Some of the Rhode Island portions of the Bikeway have been constructed, and the Pawtucket segment is the southern-most terminus, which also links the Blackstone Valley Bikeway with the East Bay Bikepath. The City of Pawtucket has already constructed a small segment of the Bikeway, behind Pawtucket City Hall.

Describe anticipated municipal or state transportation network or economic development benefits:

Slater Mill, in downtown Pawtucket has recently been designated as a site within the new National Park. The Bikeway will directly link to the Slater Mill site, and will enable visitors to access other portions of the National Park, as well as other tourist attractions, by bike.

The Bikeway also links the downtown to the Riverfront in Pawtucket, and provides an amenity which helps the City in its efforts at revitalization.

Is the project consistent with the local Comprehensive Plan? @ Yes D No

Is the project on the Federal Aid System? D Yes 0 No

Is the project on the National Highway System? D Yes 0 No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of Tl P Guiding • Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $1.3 million

Amount Requested through TIP Process $1 million

Is there funding from other sources committed to this project? 0 Yes D No

Source Amount

Local match for design by Pawtucket $300,000

Total $300,000

Estimated date of construction _2_0_25 ___ _ _

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

CENT t- ·

1

A ~

Pawtucket

AND

LOCUS MAP BLACKSTONE VALLEY BIKEWAY SEG. 38 RIDOT TIP Application

880 1,320 Pawtucket, RI a 220 440 1,760

Feet ---------- N

RI New Project Application

~~ Transportation Improvement Program

Contact Information Agency/Organization _C:c:it"'y---'o=-=f--=P---'-a'---w---'-tu_c_k_e_t _____________________ _

Contact Person _B_ai_·1_1e~y_H_e_a_th ________ Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

D Bridge

D Traffic

D Pavement

D Transit

D Transportation Enhancement

Project Description

Zip Code _0_2_8_60 ___________ _

Email [email protected]

D Drainage D Planning

Ii] Bicycle D Pedestrian

Ii] Other Parking/River Access

Project Title Ten Mile River Greenway (NP A #6)

Location by Street Name _B_i_ke_w_a~y~----------------------~

Project Limits - From To ____________ _

Please include an 8.5" x 11" map af the site, indicating project limits.

Provide a brief description of the proposed project:

Complete parking and cai10e/kayak public access portion of bikeway project.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

The new bikepath has limited parking and a new parking area was designed. The bikepath is adjacent to the Ten Mile River and there is a perfect spot for access to the river.

Describe anticipated municipal or state transportation network or economic development benefits:

This phase would complete the project.

Is the project consistent with the local Comprehensive Plan? 0 Yes D No

Is the project on the Federal Aid System? D Yes 0 No

Is the project on the National Highway System? D Yes 0 No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost

Amount Requested through TIP Process $120,000

Is there funding from other sources committed to this project? D Yes 0 No

Source Amount

Total

Estimated date of construction _____ _ _

Date

Officer's Signature Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

11 I~. T If F•,• •.,11 111.'11~

LOCUS MAP TEN MILE GREENWAY PHASE II RIDOT TIP Application

2,200 3,300 Pawtucket, RI o 550 1.100 ------ --4,400

Feet N

New Project Application

Transportation Improvement Program

Contact Information

RI ~SPP ~·

Agency/Organization --'C=-=i.c.ty,_o.:cf:...:P:...:a::.:wc..t:::u:.::.ck=e.:ct'-----------------------~

Contact Person _B_ar_~_ie~y~H_e_ath ________ ~ Title Planning Director

Mailling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

D Bridge

D Traffic

D Pavement

D Transit

D Transportation Enhancement

Project Description

D D Ill

Zip Code --'Oc.=2:.::.8-"-60.c_ __________ _

Email [email protected]

Drainage D Planning

Bicycle D Pedestrian

Other Study and Design

Project Title Main Street Two-Way Conversion (NPA #7)

Location by Street Name _M_a_i_n_S_tr_e_e_t _______________________ _

Project Limits - From _H_i=g_h_S_tr_e_e_t _________ _ To Dexter Street

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

This project would convert the present one way direction of Pawtucket's downtown "Main Street" into two way traffic.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

Pawtucket's Downtown Design Plan, completed in 2011, recommended making a Main Street two way to help stimulate ease of access to downtown businesses.

Describe anticipated municipal or state transportation network or economic development benefits:

This project would allow "commerce" to happen from both directions on Pawtucket's main artery downtown. The present one-way system makes the downtown disadvantageous in terms of potential visitors and basic navigability.

Is the project consistent with the local Comprehensive Plan? Ii'.] Yes D No

Is the project on the Federal Aid System? Ii'.] Yes D No

Is the project on the National Highway System? Ii'.] Yes D No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of Tl P Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $100,000

Amount Requested through TIP Process $50,000

Is there funding from other sources committed to this project? @ Yes D No

Source Amount

City of Pawtucket CDBG $50,000

Total $50,000

Estimated date of construction ____ __ _

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

Ji,17', I t~. ·~1 1,J t I 1 1Uhl

CENTRAL FALLS

LOCUS MAP MAIN STREET TWO-WAY CONVERSION RIDOT TIP Application Pawtucket, RI o 295 590 1,180 1,770 2,360

Feet ------ -- N

New Project Application

Transportation Improvement Program

Contact Information

RI ~SPP ~"

Agency/Organization _C:..:i:-=,ty'-----=-of'-'P'-a"'-w"-t'--'u'-"c=k-=-et:___ ______________________ _

Contact Person _B_ar_·_ne~y'---H_e_ath ________ ~ Title Planning Director

• Mail ling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

0 Bridge O Pavement

0 Traffic 0 Transit

0 Transportation Enhancement

Project Description

Zip Code ---'0_2_8_60 ___________ _

Email [email protected]

0 Drainage 0 Planning

0 Bicycle O Pedestrian

Ii:'.! Other Study and Design

Project Title Broadway Two-Way Conversion (NPA #8)

Location by Street Name _B_r_o_ad_w~ay~------------------------

Project Limits - From -=-Mcca:ci::::nc.:S:.:tt:..:·e:..:e.::.t _________ _ To Exchange Street

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

This project would study and design the conversion of the one-way segments of Broadway between Main

Street and Exchange Street.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

The project has been proposed per the recommendations of transportation planning studies commissioned by the City, including the 2012 "Downtown Design Plan" prepared by Thurlow Small Architecture, Inc. The project is intended to assist in the economic revitalization of Pawtucket's downtown by improving the accessibility of this area for vehicles and pedestrians.

Describe anticipated municipal or state transportation network or economic development benefits:

The project will result in an incremental untangling of Pawtucket's transportation network. The current abundance of one-way network segments has long been acknowledged as an impediment to the downtown area's accessibility, and therefore its attractiveness to developers, visitors to downtown landmarks including Slater Mill and the GAMM Theater, and others who might enable its revitalization.

From a municipal governance standpoint, the project's most significant benefits will include better access for emergency and public safety response vehicles, including snow plows. Additionally, residents and business owners will be afforded easier access to City Hall.

Is the project consistent with the local Comprehensive Plan? 12] Yes D No

Is the project on the Federal Aid System? 12] Yes D No

Is the project on the National Highway System? D Yes 12] No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost 550000

Amount Requested through TIP Process 350000

Is there funding from other sources committed to this project? [{] Yes D No

Source Amount

City of Pawtucket Road & Traffic Bond 200000

Total 200000

Estimated date of construction Summer 2017

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

CENTRAL FALLS

A ff;:

Pawtucket 1, IN I t~ f \• \ Jl '· 1 1<)1\1

LOCUS MAP BROADWAY TWO-WAY CONVERSION MAIN TO EXCHANGE STREET RIDOT TIP Application

1,1 80 1,770 Pawtucket, RI O 295 590 2,360

Feet ---------- N

New Project Application

Transportation Improvement Program

Contact Information Agency/Organization _C~i~ty~of_P_a_w~t_u_c_k_et _______________________ _

Contact Person _B_an_1e~y~H_e_at_h _______ _ Title Director of Planning & Redevelopment

• Mailling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500

Type of Project

D Bridge

[a Traffic

select all that apply

[a Pavement

D Transit

[a Transportation Enhancement

Project Description

Zip Code ___,0'-=2'-"8-"-60"---------------~

Email [email protected]

D Drainage

D Bicycle

D Planning

[a Pedestrian

D Other----------------

Project Title Transportation Improvements at Pawt. Public Schools - Safe Routes to School (NPA #9)

Location by Street Na me ___,V--=a:c_n:..:· o:.::uc:.s_,,_("-17'--"'sc::::h:..:o:.::o-=.:ls'"") ____________________ _

Project Limits - From n/a To ~nl"-a~------------

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Per the recommendations of the recently-commissioned Citywide School Zones Safety Improvement Plan, tl1is project will implement traffic and pedestrian safety measures at all Pawtucket public schools. Physical improvements are anticipated to inclnde driveway and bus lane reconfiguration; sidewalk reconstruction; signage, striping, and other traffic control device improvements; and parking lot and other site improvements.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

A significant percentage of Pawtucket's student body commutes to school on foot. This practice has raised awareness of the need for transportation networks at school zones that balance the need for vehicular and pedestrian accessibility. The City recently commissioned a study of traffic safety at public school zones, which has illustrated the need for improvements within these networks including traffic calming measures, dedicated bus loading zones, and pedestrian accessibility features.

Describe anticipated municipal or state transportation network or economic development benefits:

The project will optimize transportation networks in public school zones for traffic safety. Anticipated benefits include reduced risk of traffic accidents (and accidents themselves) within these zones, particularly those involving pedestrians. The project should also ease traffic congestion at public school zones during morning dropoff and afternoon pickup hours, which will produce several economic, environmental, and public health benefits including reduced economic loss due to traffic gridlock, reduced fuel consumption, and fewer emissions from vehicle exhausts.

Is the project consistent with the local Comprehensive Plan? [Z] Yes D No

Is the project on the Federal Aid System? [Z] Yes D No

Is the project on the National Highway System? [Z] Yes D No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding • Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost 715000

Amount Requested through TIP Process 515000

Is there funding from other sources committed to this project? [Z] Yes D No

Source Amount

City of Pawtucket Road & Traffic Bond 200000

Total 200000

Estimated date of construction 2017-2018

Date I I

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

Elemeritaiy El • EliwbeU, Baldwin: 50 Whitman Strcot ~2 - Flora S. Curtis: SH Beno flt Streel El -M, Virginia CllllninghRm: 40 Baldwin S1tc'<'1 E4 • Cm,·in McCabe: 4(,6 Cnttugc Stmcl E5. Fallon Men,orial: 62 Uncnln Avenue E6 • NRth,nscl Groene: 285 Smithfield Avenue E7 -AgnesE. Litlk; 60 S0utl1Il«1d Slrw li8 - Potter Bums: 973 Nc1'por1 Awnuc E~ - J'riu,ds J. Vori<ur: 4g6 Plcnson! Street E!O - Henry J. Winters: 4Rl Bmn~way

1uiii!ll'.mg11: Ml • LymnanB. Goff: 974New!)Ort Avenue M2 - Joseph Jenks: 350 Divi>ion Stn·d M3 • Samuel Slater. 281 Minor.ti Spring Avenue Senior High H1 Jucqnolinc Walsh (JMW) Aru: 350 Division Stn:ol H2 Chrules E. Sl10a: 48~ faist Avenue 113 Wirnoni E. Tolman: 150 Exchange S!n:ot

N

(D School Zone RFP Pawtucket, Rhode Island

februory 2D1S

New Project Application RI

~ Transportation Improvement Program

Contact Information Agency/Organization _C_i~ty_o_f_P_a_w_tu_c_k_e_t _____________________ _

Contact Person _B_ar_r_ie_y_H_e_a_th _______ _ Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

D Bridge

D Traffic

D Pavement

D Transit

D Transportation Enhancement

Project Description Project Title Intersection Redesign (NPA #10)

Zip Code --'0=--=2=--=8-=-60=--------------~ Email [email protected]

D Drainage D Planning

D Bicycle D Pedestrian

0 Other Study and Design

Location by Street Name Goff Ave/Exchange St/Broad St/Summer St

Project Limits - From ____________ _ To ____________ _

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

This project would examine a redesign of this current five-way intersection.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

Located in a major commercial district, this intersection is extremely dangerous for pedestrians. It is a major public transit stop and serves a very high pedestrian count daily.

Describe anticipated municipal or state transportation network or economic development benefits:

Is the project consistent with the local Comprehensive Plan? Ii'.'.] Yes D No

Is the project on the Federal Aid System? Ii'.'.] Yes D No

Is the project on the National Highway System? Ii'.'.] Yes D No

I

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding • Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $ 100,000

Amount Requested through TIP Process $50,000

Is there funding from other sources committed to this project? 0 Yes D No

Source Amount

City of Pawtucket CDBG $50,000

Total $50,000

Estimated date of construction _____ _ _

Date

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

~ ~

Pawtucket - ;01~ .. r .~ ,. vu1, 1 10N

LOCUS MAP GOFF AVE/EXCHANGE ST/BROAD ST/ NORTH UNION/SUMMER ST INTERSECTION RIDOT TIP Application Pawtucket, RI O 295 590 1,180 1,770 2,360 ----- - Feet

N

RI New Project Application

~ Transportation Improvement Program

Contact Information Agency/Organization __,Cc_:i~ty"-o'"f"P'-'a::.:wc_t:::u:.::c=ke=-:t:.._ ______________________ _

Contact Person _B_ar_n~ey=H~e~ath~-------- Title Planning Director

• Mailling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

Ii] Bridge Ii] Pavement

Ii] Traffic Ii] Transit

Ii] Transportation Enhancement

Project Description

Zip code -'0"'2"'8-"-60-'---------------­

Ema ii [email protected]

Ii] Drainage Ii] Planning

Ii] Bicycle 0 Pedestrian

Ii] Other Economic Development

Project Title Broad Street Regeneration Initiative (NPA #11)

Location by Street Name _R_t_1_1_4"-, _B_ro_a_d_S_tr_e_e_t ____________________ _

Project Limits - From Mendon Road, Cumberland To Exchange Street, Pawtucket

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

• This project is for the reconstruction of the full length of Broad Street through three communities (Central Falls, Cumberland, Pawtucket) to create a "complete street" that highlights Rhode Island's main street small businesses that form the backbone of its economy. This project is to replace Resurfacing Rt 114, Broad St (Cumberland T/L to Exchange St) and Resurfacing Rt 114, Broad St (Mendon Rd to Central Falls C/L). It should be completed in coordination with the Broad Street Bridge at Blackstone River and Blackstone Valley Bikeway - Segment 3B.l projects. This project was included in the FY 2013-2016 TIP as the "Broad Street Improvement Program."

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

Broad Street is a several-hundred-year-old thoroughfare that has never been "designed." Haphazard efforts to accommodate contemporary uses have created unsafe conditions, disadvantageously affecting small businesses in some of the State's poorest communities.

To identify some of the issues: pavement is in poor condition, stormwater drainage is absent for extensive durations of this major urban arterial; unmarked turning and parking lanes, sidewalks of minimal width, and insufficient shade leading to significant heat island effect in a residential area where a substantial portion of trips are made on foot.

Repaving Broad Street will only solve one of these problems.

Describe anticipated municipal or state transportation network or economic development benefits:

Broad Street is a significant State Road and urban arterial. Reconstruction would decrease travel times, decrease economic activity lost to injury, and improve the experience of users, to the benefit of the myriad businesses that line the duration of this 2.9-mile main street.

Broad Street is the primary connection between Valley Falls, Central Falls, and points south. Improving this street will greatly improve the lives ofresidents, business owners, and visitors in this area.

Significant potential for redevelopment at over 3 million square feet of vacant and underutilized space at Ann & Hope, Cadillac Mills, The Landing (already underway), OSRAM-Sylvania, HASBRO, Fales and Jenks Mill, and Pawtucket Times sights will be greatly increased by this investment. The start of Broad Street in Downtown Pawtucket is also a major gateway for northerly access to the planned Central Falls-Pawtucket Train Station.

Broad Street is a major service corridor for RIPT A's 71 line and the intersection of Broad and Exchange Street is one ofRIPTA's busiest stops in its entire system.

Is the project consistent with the local Comprehensive Plan? 0 Yes D No

Is the project on the Federal Aid System? 0 Yes D No

Is the project on the National Highway System? 0 Yes D No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits S. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost

Amount Requested through TIP Process $11.5 million

Is there funding from other sources committed to this project? 0 Yes D No

Source Amount

Central Falls Facade Improvement Program $100,000

City of Pawtucket CDBG Proiect Match $100,000

Total $200,000

Estimated date of construction _2_0_19 _ _ __ _

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

~ ' !'; .

~':.. \ Y'J i' f Lf fi tl1 11 •·i :.:

•.:I ) :;; d,11 ,1' 8

--Broad Street llegefieration Initia iv I

MendonRq. Ii.

<l' :..

-~· :,:, ,jj

t: c:

·'ii

11ml , __ 1

::. c,d ,~ r• ,,,.,1

r•.•10~ hos.s UCI( 1Cem~terj'

~l..

l~ il 'c:'I

\ ,1 / ,',•r, I ,, / / , r ,,11,r

'.?s 1'7 -1 . ('"J

'!.• ::, ~r,. 'R

~:­' \!).

·::i •.J, t"";

"Q

rr: . -i;i .... '­:::I ()

v .1l ley" L1ll s

\_ ~ ~ - I~ (I)

U~J

"'""' I J.l.J

o ' , I 0 1 ..,.. ..... ""' I ...., I

I

F.·,r.,,·,,,._.,,5B1£oad St •. ~ · ~-,1,:·c·r1 SI ----- I , ,,1,,1 .,

I I ---=·--.' 1ml

;t.! 0 v .7J ~-.. 0 ::. -. ,. ,:; ::•

Oak Grove,

Ce11ietery

r•,·lcC,~y ',stacl ium

(;"1 1,t ~~ -•n ,:!J

.,., OJ ,1, :::J ::i :;l I !"i < I

I

a, _;.

<:[ .:..----: ....

~-:

(

f.J -t 1 I: '~ ,: i7

RI New Project Application

~ Transportation Improvement Program

Contact Information Agency /Organization --=C::.c:it:dy--'o::.c:f--=P--=accw-=-tu=c=-ckc:cet::.__ ____________________ ~

contact Person --=B~an=1e~y-'H"'e"'a""th=----------- Title Planning Director

Mailling Address 137 Roosevelt Avenue

City Pawtucket Zip code _0_2_8_60 ___________ _

Phone 401-728-0500, ext. 440 Email [email protected]

Type of Project select all that apply

0 Bridge D Pavement

D Traffic D Transit

D Drainage

D Bicycle

D Planning

D Pedestrian

D Transportation Enhancement D Other --------------~

Project Description Project Title Cole Street RR Bridge (NPA #12)

Location by Street Name Cole Street Bridge No. 937

Project Limits - From ____________ _

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Demolition of existing bridge

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

RlDOT has determined this bridge to have a critical finding.

Describe anticipated municipal or state transportation network or economic development benefits:

The bridge sits over the Amtrak N.E. corridor tacks.

Is the project consistent with the local Comprehensive Plan? 0 Yes D No

Is the project on the Federal Aid System? D Yes 0 No

Is the project on the National Highway System? D Yes 0 No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding • Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Economic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost

Amount Requested through TIP Process _____ _.

Is there funding from other sources committed to this project? D Yes D No

Source Amount

Total

Estimated date of construction _ _ ____ _

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

ATTLEBORO ,MA

o - 220 440 --- 880

_ 1.760 Feet

N

RI New Project Application

~ Transportation Improvement Program

Contact Information Agency/Organization _C'---i-'-'ty,_o'-f_P_a_w_t_u_c_k_et _______________________ _

Contact Person _B_arr_ie~y,_H_e_at_h _______ _

• Mail ling Address 137 Roosevelt Avenue

City Pawtucket

Phone 401-728-0500, ext. 440

Type of Project select all that apply

Title Planning Director

Zip Code _0_2_8_60 __________ _

Email [email protected]

D Bridge

D Traffic

D Pavement

D Transit

D Drainage D Planning

0 Bicycle 0 Pedestrian

D Transportation Enhancement 0 Other Study and Design

Project Description Project Title George Bennett Highway Pedestrian Improvements (NP A #13)

Location by Street Name George Bennett Highway

Project Um its - From Beverage Hill Avenue To Roosevelt Avenue

Please include an 8.5" x 11" map of the site, indicating project limits.

Provide a brief description of the proposed project:

Introduce pedestrian and bicycle safety measures along the entire stretch of roadway.

STATE PLANNING COUNCIL I One Capitol Hill, Providence, RI 02908 I www.planning.ri.gov

Describe need for proposed project:

This roadway is a major north/south connector and both pedestrians and bicyclists use this at great peril.

Describe anticipated municipal or state transportation network or economic development benefits:

Is the project consistent with the local Comprehensive Plan? 0 Yes O No

Is the project on the Federal Aid System? 0 Yes O No

Is the project on the National Highway System? 0 Yes 0 No

Evaluation Criteria

Please address the following topics as they relate to the project. Refer to "An Overview of TIP Guiding Principles" for more information. Submission must not exceed 2 pages, single-spaced, 12-point font.

1. Mobility Benefits 5. Supports Local and State Goals 2. Cost Effectiveness 6. Safety and Security 3. Ecopomic Development 7. Equity 4. Environmental Impact

Project Estimates

Estimated Project Costs

Total Cost $100,000

Amount Requested through TIP Process $50,000

Is there funding from other sources committed to this project? D Yes D No

Source Amount

City of Pawtucket CDBG Match $50,000

Total $50,000

Estimated date of construction _____ _ _

Date

ALL APPLICATIONS ARE DUE BY 3:00PM ON FRIDAY, JANUARY 8, 2016

PROVIDENCE

I GIN r ,E: F '/•.J I '. ll ( ti~

LOCUS MAP GEORGE R. BENNETT IND. HIGHWAY PEDESTRIAN/BIKE IMPROVEMENTS RIDOT TIP Application

2,200 3,300 Pawtucket, RI O 550 1·100 4,400

Feet ---- --- - -- N