Pre-submittal meeting CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX FIRE DEPARTMENT FIRE STATION No. 62 CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES PROJECT NO. FD57100027 PROCUREPHX PRODUCT CATEGORY CODE: 912000000 RFX6000001097 JULY 22, 2021 Meeting will start soon Please MUTE your microphone & turn off your camera

RFx hints & Tricks

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RFx hints & Tricks

Pre-submittal meeting

CITY OF PHOENIX

REQUEST FOR QUALIFICATIONS

PHOENIX FIRE DEPARTMENTFIRE STATION No. 62CONSTRUCTION MANAGER AT RISK (CMAR) SERVICESPROJECT NO. FD57100027PROCUREPHX PRODUCT CATEGORY CODE: 912000000RFX6000001097JULY 22, 2021

Meeting will start soon

Please MUTE your microphone & turn off your camera

Page 2: RFx hints & Tricks

Welcome and Introductions

Debra Russell, Contract Specialist II – Team Lead,

Point of Contact for Submittals and RFQ Questions

Office of the City Engineer,

[email protected] 602-256-3444

James Zwerg, RA, Architect,

Phoenix Fire Department, Project Manager

Gary J. Nelson, AIA, NOMA, NCARB, Architect,

Street Transportation Department, Vertical Project Manager

Page 3: RFx hints & Tricks

Agenda

Meeting Overview

Vendor Registration & Procurement Websites

Project Description

Scope of Work

SBE Participation

Construction Manager at Risk Services

SOQ Evaluation Criteria / RFQ Overview

Submittal Requirements (Page Count, Disqualifications)

Important Dates: Selection Schedule

Websites

ProcurePHX / RFx Electronic Submittal

Questions are welcome after

each presentation

Enter your questions into the

Chat Box and Identify yourself

Page 4: RFx hints & Tricks

Meeting Overview

The Attendance sheet and PowerPoint will be posted on City of Phoenix’s ProcurePHX system at:

https://eprocurement.phoenix.gov/irj/portal

AND Posted on the City of Phoenix website:

https://solicitations.phoenix.gov/

To be added to the Attendance sheet, send an email by 5:00 PM today to:

[email protected] with the following:

RFX6000001097 Attendance, your Name, Firm Name, Phone Number, and E-Mail Address

It is your responsibility as a RFQ holder to determine, prior to submittal, if any Notifications have

been issued.

This is your ONLY opportunity to discuss this solicitation with City staff.

Page 5: RFx hints & Tricks

Vendor Registration

All Firms MUST be registered in the Vendor Management System PRIOR TO SUBMITTING A SOQ

Information on how to register with the City is available at:

https://www.phoenix.gov/finance/vendorsreg

New Firms – After Registering, the City will send an e-mail with a vendor number in approx. 2 days

If your firm is already registered with the City of Phoenix’s

ProcurePHX system, login and access the electronic solicitation at:

https://eprocurement.phoenix.gov/irj/portal

Product Category Code is: 912000000

RFx Number is: 6000001097

The VENDOR NUMBER is to be included on the cover of the

Statement Of Qualifications

Page 6: RFx hints & Tricks

Project Description / Background

Fire Station No. 62 will be

located on the City of

Phoenix owned property

behind the Target

Center shopping center at the Northeast corner

of 99th Ave. and Lower

Buckeye in Phoenix.

The specific site location

has not been

determined.

Proposed location for new

Fire Station 62 – 400’x400’

Page 7: RFx hints & Tricks

Scope of Work / Services

▪ Fire Station No. 62 is proposed to be a one-story Fire

Station with approximately 15,000 gross square feet.

▪ It will have 4 apparatus bays and 16 dorms, along with the

typical spaces associated with a Fire Station of this size –

kitchen, dining, day room, individual restrooms, and

exercise space.

▪ A community/meeting room for staff and public use may

become part of the scope.

▪ The scope of work will also include site development,

parking, hardscape, landscape, irrigation, security lighting

and other elements as required.

▪ The architectural design intent is for a fire station that

blends in with the surrounding Estrella Village community.

Page 8: RFx hints & Tricks

Scope of Work / Services

▪ The scope of work will also include site development,

parking, hardscape, landscape, irrigation, security lighting

and other elements as required.

▪ Other scope of work that may be required is minimal Right

of Way improvements, utility extensions, street lighting,

added traffic control signal/device at the fire station

response apron and other work as may be required.

Page 9: RFx hints & Tricks

Construction Manager at Risk (CMAR) Services

▪ CMAR will:

▪ begin with the design firm in an agency support role for preconstruction services.

▪ will assume the risk of delivering project through a Guaranteed Maximum Price (GMP) contract.

▪ Will be responsible for construction means and methods and will be required to solicit bids from prequalified

subcontractors to perform the work using the City’s subcontractor selection process.

▪ The CMAR may also compete to self-perform limited amounts of work.

▪ The GMP(s) must be submitted in MAG or CSI format, or it will not be accepted.

Page 10: RFx hints & Tricks

Construction Manager at Risk (CMAR) Services

▪ Preconstruction phase services by the CMAR may include the following:

▪ provide detailed cost estimating and knowledge of marketplace conditions

▪ provide alternate systems evaluation and constructability studies

▪ advise City on ways to gain efficiencies in project delivery

▪ provide long-lead procurement studies and initiate procurement of long-lead items

▪ participate w/ City in a process to set a goal for local and SBE participation

▪ implement the local and SBE process

▪ protect the owner’s sensitivity to quality, safety, and environmental factors

▪ advise City on choosing green building materials

Page 11: RFx hints & Tricks

Construction Manager at Risk (CMAR) Services

▪ Construction phase services by the CMAR may include:

▪ select subcontractors/suppliers for this project

▪ prepare a Guaranteed Maximum Price (GMP) proposal(s) that meets the approval of the City

▪ coordinate with various City of Phoenix departments, other agencies, utility companies, etc.

▪ arrange for procurement of materials and equipment

▪ schedule and manage site operations; provide quality controls

▪ bid, award, and manage all construction related contracts while meeting City bid requirements including the

local and SBE participation goal

▪ bond and insure the construction

▪ address all federal, state and local permitting requirements

Page 12: RFx hints & Tricks

QUESTIONSFOR THE CLIENT DEPARTMENT

PROJECT MANAGER

Page 13: RFx hints & Tricks

Small Business Enterprise Program (SBE)

Goal Setting Methodology

❖ SBE subcontracting goal will be set prior to construction of this project (no SBE

goal for Design Phase)

❖ Goals are established by City of Phoenix Goal Setting Committee

• The final goal will be based on SBE subcontractor availability.

❖ Only firms whose physical business is located within Maricopa County are eligible

to meet the SBE subcontracting goal.

❖ No SBE documents due at time of submittal

Page 14: RFx hints & Tricks

SOQ Evaluation Criteria

The selection of the Consultant will be based on the

following qualifications:

Page 15: RFx hints & Tricks

SOQ Evaluation Criteria

Maximum number of Points is 400

A. General Information (50 Points)

B. Experience and Qualifications of the Firm (100 Points)

C. Experience of the Key Personnel Assigned to This Project (100 points)

D. Understanding of the Project and Approach to Performing the Required

Services (150 points)

*Reference Checks (21 Points)

*Interviews (600 Points)

Page 16: RFx hints & Tricks

SOQ Evaluation Criteria

A. General Information (50 points)

1. Provide a general description of the firm that is proposing to provide construction management services

and general construction services. Explain the legal organization of the proposed firm or team. Provide an

organization chart showing key personnel.

2. Provide the following information:

a. List the Arizona contractor licenses held by the firm and the key personnel who will be assigned to this

project. Provide the contractor license number. Reference the appropriate licenses held, if needed. In

order to be considered for this project, the contractor must hold the correct license as deemed appropriate

by the Arizona Registrar of Contractors prior to submitting a Statement of Qualifications (SOQ) for this project

in accordance with Arizona Revised Statute §32-1151.

b. Identify the location of the firm’s principal office and the home office location of key staff on this project.

c. Identify any contract or subcontract held by the firm or officers of the firm, which has been terminated

within the last five years. Identify any claims arising from a contract which resulted in litigation or arbitration

within the last three years. Briefly describe the circumstances and the outcomes.

Page 17: RFx hints & Tricks

SOQ Evaluation Criteria

B. Experience and Qualifications of the Firm (100 points)

1. Identify at least three comparable projects in which the firm served as either CMAR, agency Construction

Manager during design and construction phases (without providing construction services), or General

Contractor. Special consideration will be given to firms that have provided Construction Manager at Risk

services on similar successful projects. For each project identified, provide the following:

a. Description of the project

b. Role of the firm (specify whether Construction Manager at Risk, Construction Manager or General

Contractor. If CMAR or General Contractor, identify the percent of work self-performed. Also specify

provided during design phase, i.e., cost estimating, scheduling, value engineering, etc.)

c. Project’s original contracted construction cost and final construction cost

d. Construction dates

e. Project owner

2. List of all City of Phoenix projects where the firm provided CMAR, agency construction management, or

general construction services in the last five years, either completed or ongoing.

Page 18: RFx hints & Tricks

SOQ Evaluation Criteria

C. Experience of Key Personnel to be Assigned to This Project (100 points)

1. For each key person identified, list their length of time with the firm and at least two comparable projects in

which they have played a primary role. If a project selected for a key person is the same as one

selected for the firm, provide just the project name and the role of the key person. For other projects

provide the following:

a. Description of project

b. Role of the person

c. Project’s original construction cost and final construction cost

d. Construction dates

e. Project owner

2. List any proposed consultants, (including SBEs), including key staff names and the experience and

qualifications of these individuals.

Page 19: RFx hints & Tricks

SOQ Evaluation Criteria

D. Understanding of the Project and Approach to Performing the Required Services (150 points)

1. Discuss the major issues your firm has identified on this project and how you intend to address those issues.

2. Attached to this Request for Qualifications is the City of Phoenix general subcontractor selection plan (see

Exhibit A).. Describe how you intend to implement this subcontractor selection plan including your

recommendations for subcontractor trades to be selected by qualifications only vs. qualifications and bids;

and discuss the benefit that your subcontractor selection plan provides to the project.

3. Describe your firm’s project management approach and team organization during design and construction

phase services. Describe systems used for planning, scheduling, estimating, and managing construction.

Briefly describe the firm’s experience on quality control, dispute resolution, and safety management.

Page 20: RFx hints & Tricks

Submittal Requirements

• Submit One (1) page Information Sheet that includes project title, project number, RFx number, firm name, address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.

• Paper Size shall be 8½ “ x11”; Font size no less than 10 pt.

• Each page containing resumes, evaluation criteria, and additional content will be counted toward the maximum page limit

• Pages that have project photos, charts and/or graphs will be counted toward the maximum page limit

Grounds for disqualification:

• Failure to submit electronically through the ProcurePHX online portal by the due date and time

•Violating “Contact with City Employees” policy

MAXIMUM pages permitted is

12 pages:

The following will NOT be counted

in the max page count:

•Front and back covers

•Information Sheet

•Table of Contents

Page 21: RFx hints & Tricks

Selection Process

Each SOQ will be evaluated according to the evaluation criteria in

the RFQ.

At least 3, but not more than 5 firms will move forward to interview

One firm will be selected

A contract will be executed upon completion of

negotiations of contract terms and City Council

approval.

Page 22: RFx hints & Tricks

QUESTIONS

QUESTIONS

QUESTIONS

Page 23: RFx hints & Tricks

Important Dates: Selection Schedule

Event: Date:

Pre-submittal meeting July 22, 2021

SOQs Due August 6, 2021

Firms Notified for Interview August 20, 2021

Interviews September 3, 2021

Selection Notification September 2021

Scope of Work Meeting November 2021

Page 24: RFx hints & Tricks

Procurement

Websitehttps://www.phoenix.gov/streets/procurement-

opportunities/

Page 25: RFx hints & Tricks

City of Phoenix Solicitations Website

1. Project-specific RFQs,

Notifications, Sign-in

Sheets, PowerPoint

Presentations

2. Link to “Tabulations,

Awards and

Recommendations”

web page

https://solicitations.phoenix.gov

Page 26: RFx hints & Tricks

QUESTIONS?

Thank You for Attending!!!

Stay for ProcurePHX Overview otherwise,

Email all questions to:

[email protected] call: 602-256-3444

Reference RFX6000001097 in your email subject line

Page 27: RFx hints & Tricks

RFx Overview

Brief overview for

online submissions

Page 28: RFx hints & Tricks

RFx Overview

Vendor Registration

LoginViewing

SolicitationsSubscribe to Notifications

Uploading & Attaching

SOQ

Submitting SOQ

Checking Response

Status

Editing Response

FAQ Tips & TricksThings to

RememberQuestions

Page 29: RFx hints & Tricks

Login to ProcurePHX

If your firm is already registered with the City of Phoenix’s ProcurePHX system, visit https://eprocurement.phoenix.gov/irj/portal to login and access the electronic solicitation

Product Category Code is: 906000000 Architectural

And 925000000 Engineering

RFx (Event) Number is: 6000001097

Note: The VENDOR NUMBER is to be included on the cover of the Statement Of Qualifications

Page 30: RFx hints & Tricks

RFx Home Screen

Once you are logged in to the ProcurePHX portal:

https://eprocurement.phoenix.gov/irj/portal

Select RFx and Auctions tab on the top Ribbon

You will be taken to the RFxOverview (Event) Page

Page 31: RFx hints & Tricks

Finding Solicitations

Click the Refresh Button on

the RFx Overview (Event)

Page to see the most current

information.

Find the solicitation you’d

like to view from the list, by

RFx (Event) Number.

For this solicitation, your RFx

(Event) Number is:

6000001097

Page 32: RFx hints & Tricks

View Selected Solicitation

1. Click the gray box next to the RFx (Event)

Number you’d like to view.

2. Click Display Event

This will open a new window to view the selected RFx

*If you don’t see the new window, check your POP-UP BLOCKER.*

1

2

Page 33: RFx hints & Tricks

Would you like updates on this solicitation?

Update your Participation Status accordingly

1. Click Participate. This will ensure you to get email notifications regarding your RFx Event, i.e. Notifications, New Attachments.

2. Review RFx Information Tab for Start/Due dates/ Title of Solicitation

1

Page 34: RFx hints & Tricks

Do you want to submit for this solicitation?

1. Click Create Response

2. Review Notes and Attachments Tab for the RFQ, Pre-Submittal Presentation, Attendance Sheet, and Notifications, etc.

1

Page 35: RFx hints & Tricks

How to upload your SOQ

1. Attach SOQ by clicking Add Attachment, there will be a separate pop-up window.

DO NOT USE SPECIAL CHARACTERS OR A LONG FILE NAME. THIS COULD CAUSE YOUR SOQ TO NOT BE

LOADED PROPERLY AND YOU MAY BE DISQUALIFIED.

2. Click Browse in the pop-up window to navigate to the desired attachment document

2

Page 36: RFx hints & Tricks

Adding an Attachment

1. Once you’ve selected your document, add a Description and then click OK

2. The Summary Tab provides a high-level overview of your RFxResponse

3. Under description click the blue link to double check the file that has been uploaded

Page 37: RFx hints & Tricks

Double Check & Submit

1. Click the CHECK button to ensure no system errors

2. Click the SUBMIT button to submit your RFx response1

2

Page 38: RFx hints & Tricks

RFx Response Submitted

1. You will see a RFx response message that your response was submitted. No email notification will be sent.

2. Confirm you have the required number of attachments listed, as outlined in the RFQ.

3. Click Close, and return to the RFx Overview (Event) Page.

1

Page 39: RFx hints & Tricks

Checking the Response Status

1. Click Refresh on the RFx Overview (Event) Page.

2. Locate the desired RFx (Event) Number, and scroll to the right.

3. Your Response Status should display ‘Submitted’.

Note: A Response Status of In Process, or Saved indicates you are still in edit mode, and need to complete steps before the system will update your RFx response to Submitted.

2

Page 40: RFx hints & Tricks

How to Edit Your Submission

The RFx Overview (Event) Page is also where you can find your saved RFx response.

Locate the desired RFx (Event) Number, and scroll to the right. You will see your RFx response

number shown as a hyperlink.

1. Click on the hyperlink, a new window will pop up to allow you to edit your RFx response.

Page 41: RFx hints & Tricks

When I submit, what does the red

circle mean?

Error on page and nothing will

be submitted

When I submit, what does the yellow triangle

mean?

Typically, a time zone error;

information will still be submitted

When I submit, what does the green square

mean?

Verify information is correct and click submit

Frequently Asked Questions

Page 42: RFx hints & Tricks

• Click “Refresh” often

• Make sure your Pop-Up blocker is turned off

• Application is accessible with Internet Explorer or Google Chrome

• When finished, always click “Close” on current screen, then click “Log Out” on upper right corner, following you can click the “X” in the upper right corner of the internet application.

Tips & Tricks

Page 43: RFx hints & Tricks

Information Sheet

Include only the following items:

❖ RFX6000001097

❖ Project Title: Fire Station No. 62 – CMAR Services

❖ Project Number: FD57100027

❖ Firm Name

❖ Firm Address

❖ Firm Phone Number

❖ Vendor Number

❖ Name, Title, and Email address of contact person

Do NOT include any other information

Page 44: RFx hints & Tricks

Email all questions to:[email protected] call: 602-256-3444

Reference RFX6000001097 in your email subject line

Thank You for Attending!!!

Questions after today?