    Site Name: MILE 2

    Address: 5, WISEMAN AVENUE UBA ESTATE MILE 2, LAGOS.

    Customer Name: MTN

    Site ID:LAG251

    Location:MILE

    Date: 02-01-201

    Sector: S1 S2 S3

    Height of Antenna 60M 60M 60M

    Azimuth 60 150 300

    Mech. Tilt 0 0 0

    Elect. Tilt 2 4 2

    Type of Antenna: AC15BD GN43DP DY78KL

    RF PLAN

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    2/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

    SL.NO PARTICULARS SPECIFICATION QUANTITY REMARKS

    1 Flat Head screw driver Heavy Duty spanner 1

    2 Screw Drive set Poker 1

    3 D-Type Spanner 10-11mm spanner 2

    12-13mm spanner 2

    30-32mm spanner 2

    4 Measuring Tape 50m 1

    5 Tilt Meter 1

    6 Knife Pure chromium blade 2

    7 Ring Type Spanner 10-11mm spanner 2

    12-13mm spanner 28 Adjustable Spanners Heavy Duty 1

    9 Crimping Tool Crimp Upto 16mm 1

    10 Ball Pin Hammer 500 gm 1

    11 File Flat 1

    12 Combinational Plier 1

    13 Mirror Compass 1

    14 RF Cable Cutter 1

    15 Cable Cutter Heavy Duty 1

    16 Tie Cutter 1

    17 Rope 100 mtr length and 16 inch dia. 1

    18 Pulley 6 inch doule bearing 1

    19 First Aid Box 1

    20 Helmet 1

    21 Safety Belt 1

    LIST OF TOOLS

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    3/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL16

    Location: Jaipur

    Date: 24-06-12

    Sl.NO PARTICULARS SPECIFICATIONSQUANTITY

    (Nos./Mtr) REMARKS

    1 GSM Antenna AS14BV 1

    BN43ZN 1

    AY78NM 1

    2 RF cable 7/8" dia 342mtr

    For 6 RF Cables

    (3 Sectors)

    3

    Jumper Cable with Jumper

    Connector

    1/2''dia.(Cable) &

    1/2''dia. (DIN-F

    Connector) 12nos. (Each 3mtr.)4 RF Connectors 7/8 dia. (N-M) 12

    5 RF Clamps 7/8 dia. (6 way) 55

    6 Earthing Kits 1/2mtr. Copper Cable 12

    7 Roxtec 6 way 1

    8 Surge Arrestors 6

    9 IGB 300*100*10 1

    10 EGB 300*100*10 1

    11 Weather Proofing Kits 8-10 Sets

    16 sq.mm Green 8 mtr 6 X 1.5 mtr

    35 sq.mm Yellow-Green 5 mtr 2 mtr + 3 mtr

    13 Lugs Ring Type (35 Sq.mm) 12

    Ring Type (16 Sq.mm) 4

    Cable Ties Length 10 (Black) 1 pck

    LIST OF MATERIAL

    12Grounding Cable

    Dual Port, Cross

    Polarised, Katherine

    Manufacturer

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    4/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

    Sl.No. Particulars Status Remarks

    1

    Installation Of GSM Antenna on the Pole

    mount NOT OK

    Antenna Clamps not properly tightened to the

    polemount.

    Second Lock not provided on Antenna Clamps.

    2 Jumper Connector to the Antenna connection NOT OK Jumper Connector not properly connected.

    3 Weatherproofing on O/D Jumper connector NOT OK Weatherproofing is not done properly.

    Outer PVC taping of the weatherproof is in wrong

    direction.

    3 cable ties are not tightened to the weatherproof.

    The knots of cable ties are not in the same position.

    4 Lebeling of Antenna NOT OK Not properly marked with the marker pen.

    Lebeling not done in backside of antenna.

    5 Height of Antenna NOT OK Not as per the RF plan.

    6 Azimuth of Antenna NOT OK Not as per the RF plan.

    7 Tilt of Antenna NOT OK

    Electrical tilt is given but the Mechanical tilt not

    turned to 0

    Tilt not proper as per the RF plan.

    8 Lebeling on O/D Jumper NOT OK

    Coloured PVC tape is not used for temporary

    marking at the Jumper.

    Stickers, Marker pens is used without Cellotape for

    permanent marking.

    Lebeling is not as per the sector selected during the

    RF plan

    9 Loop on the O/D Jumper NOT OK Loop is not proper at the bend.

    Loop is not atleast 1m. of length.

    2 Cable ties are not tied at the loop.

    10 Bend on the O/D Jumper NOT OK Bending on Jumper cable is sharp.

    11 Routing of O/D Jumper NOT OK Routing not done along with tower body.

    12 Cable ties on O/D Jumper NOT OK

    Cable ties are not tied while routing with the tower

    body.

    Cable ties are not provided at sufficient distances.

    13 Jumper Connectors on O/D Jumper NOT OK Jumper Connectors are not properly connected.

    Not properly weatherproofed.

    Last hand taping of PVC tape is not directed in the

    direction opposite to the water flow.

    Quality Check Points for the installation of Antenna and Antenna line

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    5/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

    3 Cable ties are not tightened to the weatherproof.

    14 Routing of RF Cable NOT OK Routing of RF cables is not staight.

    NOT OK

    Pattern of routing of RF cables through RF clamps i

    not proper.

    15 RF Clamps on Cable Tray NOT OK

    Distance between RF clamps on HCT is not less tha

    1m.

    Distance between RF clamps on VCT is not between

    1-1.5m.

    RF clamps not properly tightened to the cable tray.

    16 Bend on RF Cable NOT OK Bending on RF cable is sharp.

    Bending radius is not atleast 300mm.Dummy clamp not provided at the bend.

    17 Lebeling of RF Cable NOT OK

    Coloured PVC tape is not used for temporary

    marking at the Jumper.

    Stickers, Marker pens is used without Cellotape for

    permanent marking.

    Lebeling is not as per the sector selected during the

    RF plan

    18 S-bend on RF Cable NOT OK

    S-bend not provided on RF cable before entering the

    Shelter.

    S-bend not provided on RF cable but it is not proper

    19 Length of RF Cable inside Shelter NOT OK

    Extra length of 0.5-1m of RF cable is not kept to go

    inside shelter.

    Length of RF cable inside shelter is not same.

    20 Earthing Kit on RF Cable NOT OK Earting Kit is not properly installed on RF cable.

    All Earthing Kits are not at same position.

    21 Weather Profing on Earthing Kit NOT OK Weatherproofing is not done properly.

    Outer PVC taping of the weatherproof is in wrong

    direction.

    3 cable ties are not tightened to the weatherproof.

    22 Grounding Cable of the Earthing Kit NOT OK Direction of Grounding Cable is not downward.

    Grounding Cable is not routed 0.5m. Along with RF

    cable.

    NOT OK Grounding Cable is not connected to the tower body

    NOT OK

    Grounding Cable is connected to tower body withou

    C-Clamp.

    NOT OK

    Grounding Cable is connected to tower body using C

    Clamp but not properly

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    6/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

    NOT OK

    C-Clamp tigthened to the tower body without filing

    the outer paint

    NOT OK Nuts and Bolts of C-Clamp are not tightened properl

    NOT OK

    More than 2 Grounding Cable passed through a

    single C-Clamp.

    23

    Connecting the RF Connectors to the RF

    Cable NOT OK VSWR of RF Connectors is exceeding the limit.

    RF Connectors are not properly connected to the RF

    Cable.

    24 Weatheprofing on RF Connectors NOT OK

    Weatherproofing on RF Connectors is not done

    properly.

    Last hand taping of PVC tape is not directed in the

    direction opposite to the water flow.3 Cable ties are not tightened to the weatherproof.

    25 Installation of Roxtec NOT OK

    Roxtec is not properly tigthened and sealed to the

    Shelter.

    Boots are not properly tigthened to the Roxtec.

    RF Cable is not inserted in a group.

    Empty holes are not properly sealed using Silicon Ge

    26 Lebeling on Roxtec NOT OK Not properly marked with the marker pen.

    27 Connections of the Surge Arrester NOT OK

    RF cables is not properly connected to the Surge

    Arrester using RF connectors.

    I/D Jumper is not properly connected to the Surge

    Arrester.

    Grounding Cable is not connected properly to the

    Surge Arrester.

    28 Bend on I/D Jumper NOT OK Bend on the I/D Jumper is kept sharp.

    29 Lebeling on I/D Jumper NOT OK

    Coloured PVC tape is not used for temporary

    marking at the Jumper.

    Stickers, Marker pens is used without Cellotape for

    permanent marking.

    Lebeling is not as per the sector selected during the

    RF plan

    30 Jumper Connector on I/D Jumper NOT OK Jumper Connectors are not properly connected.

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    7/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    8/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1

  • 8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)

    9/9

    Site Name: NMC Complex

    Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur

    Customer Name: Airtel

    Site ID:25SL1

    Location: Jaipu

    Date: 24-06-1