8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
1/9
Site Name: MILE 2
Address: 5, WISEMAN AVENUE UBA ESTATE MILE 2, LAGOS.
Customer Name: MTN
Site ID:LAG251
Location:MILE
Date: 02-01-201
Sector: S1 S2 S3
Height of Antenna 60M 60M 60M
Azimuth 60 150 300
Mech. Tilt 0 0 0
Elect. Tilt 2 4 2
Type of Antenna: AC15BD GN43DP DY78KL
RF PLAN
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
2/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
SL.NO PARTICULARS SPECIFICATION QUANTITY REMARKS
1 Flat Head screw driver Heavy Duty spanner 1
2 Screw Drive set Poker 1
3 D-Type Spanner 10-11mm spanner 2
12-13mm spanner 2
30-32mm spanner 2
4 Measuring Tape 50m 1
5 Tilt Meter 1
6 Knife Pure chromium blade 2
7 Ring Type Spanner 10-11mm spanner 2
12-13mm spanner 28 Adjustable Spanners Heavy Duty 1
9 Crimping Tool Crimp Upto 16mm 1
10 Ball Pin Hammer 500 gm 1
11 File Flat 1
12 Combinational Plier 1
13 Mirror Compass 1
14 RF Cable Cutter 1
15 Cable Cutter Heavy Duty 1
16 Tie Cutter 1
17 Rope 100 mtr length and 16 inch dia. 1
18 Pulley 6 inch doule bearing 1
19 First Aid Box 1
20 Helmet 1
21 Safety Belt 1
LIST OF TOOLS
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
3/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL16
Location: Jaipur
Date: 24-06-12
Sl.NO PARTICULARS SPECIFICATIONSQUANTITY
(Nos./Mtr) REMARKS
1 GSM Antenna AS14BV 1
BN43ZN 1
AY78NM 1
2 RF cable 7/8" dia 342mtr
For 6 RF Cables
(3 Sectors)
3
Jumper Cable with Jumper
Connector
1/2''dia.(Cable) &
1/2''dia. (DIN-F
Connector) 12nos. (Each 3mtr.)4 RF Connectors 7/8 dia. (N-M) 12
5 RF Clamps 7/8 dia. (6 way) 55
6 Earthing Kits 1/2mtr. Copper Cable 12
7 Roxtec 6 way 1
8 Surge Arrestors 6
9 IGB 300*100*10 1
10 EGB 300*100*10 1
11 Weather Proofing Kits 8-10 Sets
16 sq.mm Green 8 mtr 6 X 1.5 mtr
35 sq.mm Yellow-Green 5 mtr 2 mtr + 3 mtr
13 Lugs Ring Type (35 Sq.mm) 12
Ring Type (16 Sq.mm) 4
Cable Ties Length 10 (Black) 1 pck
LIST OF MATERIAL
12Grounding Cable
Dual Port, Cross
Polarised, Katherine
Manufacturer
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
4/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
Sl.No. Particulars Status Remarks
1
Installation Of GSM Antenna on the Pole
mount NOT OK
Antenna Clamps not properly tightened to the
polemount.
Second Lock not provided on Antenna Clamps.
2 Jumper Connector to the Antenna connection NOT OK Jumper Connector not properly connected.
3 Weatherproofing on O/D Jumper connector NOT OK Weatherproofing is not done properly.
Outer PVC taping of the weatherproof is in wrong
direction.
3 cable ties are not tightened to the weatherproof.
The knots of cable ties are not in the same position.
4 Lebeling of Antenna NOT OK Not properly marked with the marker pen.
Lebeling not done in backside of antenna.
5 Height of Antenna NOT OK Not as per the RF plan.
6 Azimuth of Antenna NOT OK Not as per the RF plan.
7 Tilt of Antenna NOT OK
Electrical tilt is given but the Mechanical tilt not
turned to 0
Tilt not proper as per the RF plan.
8 Lebeling on O/D Jumper NOT OK
Coloured PVC tape is not used for temporary
marking at the Jumper.
Stickers, Marker pens is used without Cellotape for
permanent marking.
Lebeling is not as per the sector selected during the
RF plan
9 Loop on the O/D Jumper NOT OK Loop is not proper at the bend.
Loop is not atleast 1m. of length.
2 Cable ties are not tied at the loop.
10 Bend on the O/D Jumper NOT OK Bending on Jumper cable is sharp.
11 Routing of O/D Jumper NOT OK Routing not done along with tower body.
12 Cable ties on O/D Jumper NOT OK
Cable ties are not tied while routing with the tower
body.
Cable ties are not provided at sufficient distances.
13 Jumper Connectors on O/D Jumper NOT OK Jumper Connectors are not properly connected.
Not properly weatherproofed.
Last hand taping of PVC tape is not directed in the
direction opposite to the water flow.
Quality Check Points for the installation of Antenna and Antenna line
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
5/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
3 Cable ties are not tightened to the weatherproof.
14 Routing of RF Cable NOT OK Routing of RF cables is not staight.
NOT OK
Pattern of routing of RF cables through RF clamps i
not proper.
15 RF Clamps on Cable Tray NOT OK
Distance between RF clamps on HCT is not less tha
1m.
Distance between RF clamps on VCT is not between
1-1.5m.
RF clamps not properly tightened to the cable tray.
16 Bend on RF Cable NOT OK Bending on RF cable is sharp.
Bending radius is not atleast 300mm.Dummy clamp not provided at the bend.
17 Lebeling of RF Cable NOT OK
Coloured PVC tape is not used for temporary
marking at the Jumper.
Stickers, Marker pens is used without Cellotape for
permanent marking.
Lebeling is not as per the sector selected during the
RF plan
18 S-bend on RF Cable NOT OK
S-bend not provided on RF cable before entering the
Shelter.
S-bend not provided on RF cable but it is not proper
19 Length of RF Cable inside Shelter NOT OK
Extra length of 0.5-1m of RF cable is not kept to go
inside shelter.
Length of RF cable inside shelter is not same.
20 Earthing Kit on RF Cable NOT OK Earting Kit is not properly installed on RF cable.
All Earthing Kits are not at same position.
21 Weather Profing on Earthing Kit NOT OK Weatherproofing is not done properly.
Outer PVC taping of the weatherproof is in wrong
direction.
3 cable ties are not tightened to the weatherproof.
22 Grounding Cable of the Earthing Kit NOT OK Direction of Grounding Cable is not downward.
Grounding Cable is not routed 0.5m. Along with RF
cable.
NOT OK Grounding Cable is not connected to the tower body
NOT OK
Grounding Cable is connected to tower body withou
C-Clamp.
NOT OK
Grounding Cable is connected to tower body using C
Clamp but not properly
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
6/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
NOT OK
C-Clamp tigthened to the tower body without filing
the outer paint
NOT OK Nuts and Bolts of C-Clamp are not tightened properl
NOT OK
More than 2 Grounding Cable passed through a
single C-Clamp.
23
Connecting the RF Connectors to the RF
Cable NOT OK VSWR of RF Connectors is exceeding the limit.
RF Connectors are not properly connected to the RF
Cable.
24 Weatheprofing on RF Connectors NOT OK
Weatherproofing on RF Connectors is not done
properly.
Last hand taping of PVC tape is not directed in the
direction opposite to the water flow.3 Cable ties are not tightened to the weatherproof.
25 Installation of Roxtec NOT OK
Roxtec is not properly tigthened and sealed to the
Shelter.
Boots are not properly tigthened to the Roxtec.
RF Cable is not inserted in a group.
Empty holes are not properly sealed using Silicon Ge
26 Lebeling on Roxtec NOT OK Not properly marked with the marker pen.
27 Connections of the Surge Arrester NOT OK
RF cables is not properly connected to the Surge
Arrester using RF connectors.
I/D Jumper is not properly connected to the Surge
Arrester.
Grounding Cable is not connected properly to the
Surge Arrester.
28 Bend on I/D Jumper NOT OK Bend on the I/D Jumper is kept sharp.
29 Lebeling on I/D Jumper NOT OK
Coloured PVC tape is not used for temporary
marking at the Jumper.
Stickers, Marker pens is used without Cellotape for
permanent marking.
Lebeling is not as per the sector selected during the
RF plan
30 Jumper Connector on I/D Jumper NOT OK Jumper Connectors are not properly connected.
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
7/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
8/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1
8/22/2019 RF Plan(2) - Tools Required(3) - MRN(4) - Punch Points(7)
9/9
Site Name: NMC Complex
Address: Plot no. 97-98, Ram Nagar Shopping Center, Jaipur
Customer Name: Airtel
Site ID:25SL1
Location: Jaipu
Date: 24-06-1