REVIEW OF POLAR GS & OPS • Primary Audience : POLAR Project Scientist and Deputy Project Scientist • Objective : Review the design and Operations of the POLAR Ground System and provide recommendations to relating to possible re- engineering potential of POLAR Ground System. •Primary Author: Richard Burley – IMAGE GSM

REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

REVIEW OF POLAR GS & OPS

• Primary Audience : POLAR Project Scientist and Deputy Project Scientist

• Objective : Review the design and Operations of the POLAR Ground System and provide recommendations to relating to possible re-engineering potential of POLAR Ground System.

•Primary Author: Richard Burley – IMAGE GSM–[email protected]

Page 2: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

CSOC Cost Disclaimer

• Costs in this presentation are ‘Direct’ costs.– Staff & Immediate Mgmt, Materials, Other Direct costs such as

Travel, Training etc.

– ‘Sustaining Engineering’ costs being changed from ‘Direct to Indirect’ costs, but has been highlighted where it is significant.

• ‘Indirect’ costs being moved to a multi-mission Code-S UPN.

• CSOC Cost Estimates and funding approach are changing on a daily basis, and separating specific costs out of ‘rollups’ is not always accurate.

Page 3: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

ISTP Data Flow Overview

FDF

JPL MOC CDHF

RLZP

ScienceTeams

NSSDC

TRK_2-15A

IIRV

cmds

R/T tlm

NR

T data for A

ttitude

Pred

icts

Raw Data Files

AM

Fs for Trending

NRT tlm

Orbit/Attitude

Geo

tail

Eph

em

TT

CD

File

s

Level-0 (QL+Day)

NRT tlm

All Products

ISASG

eota

il T

TC

Ds

Cmd ReportsOps Schedules

Cal_tables

Ext Products

Cap

ture

d IR

TS

data

Page 4: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

LZP Context Diagram

JPLCDR

OracleDB

RLZP

RawDataArchive(3.5Tb)

AMF Files

Raw Data Files via FTP

FDF

MOC AMF Files for Trend Generation

Geotail Ephems for s/c Time EstimationAs backup to ISAS TTCD files.

CDHF

Instrument-Specific Level0 FilesBoth Quicklook and Daily + SFDUs

Plus transfer lists

TimeTag Correlation Data Files

‘Packets’

Capture/Rename[c]

Software Sync[c]

MajorFrameAssembly (labview)

MajorFrameDecom (labview)

DataProcessingSystem [c]

Captured IRTS files (contingency)

ISASTapes/CDs of Rawdata (contingency)

Page 5: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

LZP Processing Costs

• ISTP LZP processing was reengineered in ’97, requiring approximately 9 FTE’s.

• Reengineering reduced Operations Staff from 13 to 2.25.

• Processing and Products are very Mission and Instrument specific and include numerous ‘artifacts’.

• Further Reengineering unlikely to save more than it costs.

• No mission-specific breakdown of cost available.

0

10

20

30

40

50

60

70

80

90

K$/Fy

Polar

Wind

Geotail

Page 6: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

LZP Staff Utilization

• Data Analysis: reviewing run logs for correctness and completeness and delivery.

• Troubleshooting: diagnosis and recovery from h/w & s/w problems, data gaps, network problems.

• Maintenance: System Administration, Oracle DB maintenance.

0

5

10

15

20

25

30

35

%FTE

Data Analysis

Reporting

Processing

Troubleshoot

Maintenance

Page 7: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

RLZP Recommendations

• TBD

Page 8: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

FDF Context Diagram

JPLFDFTRK-2-15a Tracking Data

RLZP

MOC

NRT H/K data

Geotail Ephems for s/c Time EstimationAs backup to ISAS TTCD files.

CDHF MSASS[Matlab]

GMAN[Matlab]

GTDS[F]

Tlm Capture[F]

IIRV Pointing Data

2-year Orbit Predicts

Orbit Events Predicts

Sensor & Aspect Angle Predicts

Maneuver Plans & Timelines

ACQSCAN

Monthly Orbit Solution & 70-day predict

Weekly DSP Attitude & 70-day predict

Page 9: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

POLAR FDF Costs

• This chart is TBD until I get some real numbers from Tim.

0

10

20

30

40

50

60

K$/year

Orbit Products

AttitudeProducts

Maneuver Support

Sustaining

Page 10: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

WIND FDF Costs

• Orbit Support:– Trajectory Maintenance.

– Trajectory Design & Contingency Analysis

– Maneuver Planning.

• Sustaining Engineering being moved to multi-mission Code-S UPN.

0

10

20

30

40

50

60

70

K$/Fy

Orbit Products

Orbit Support

AttitudeProducts

Sustaining

Page 11: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

FDF Orbit Products

• Monthly Definitive Orbit (+/- 10Km (3-sigma)) at 1 minute resolution in FDF-Ephemeris Format, used internally in FDF for validation of 70-day predicts.

• Predicted 70-day Orbit (+/- 100Km (3-sigma)) at 1 minute resolution in FDF-Ephemeris Format, provided monthly to CDHF.

• Monthly Orbital Events File, includes eclipse times, apogee/perigee times, ascending/descending node times, sent to MOC.

• Quarterly Orbital Events File includes access times to all DSN stations, and eclipse times, put on server for MOC and Science Planners.

• Monthly IIRVs to JPL for DSN antennae pointing.

• LongTerm Predict (2 years) to DSN for mission planning.

Page 12: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

FDF Attitude Products

• Weekly Definitive Attitude (single-point solution+/- .2 degrees) in POLAR AHF, generated from r/t data from MOC. Used internally for generation of weekly DSP definitive AHF and Sensor Predicts.

• Weekly Definitive DSP Attitude (single-point solution +/- .2 degrees) POLAR AHF, generated from r/t data from MOC, sent to CDHF.

• 70-day Predicted Attitude (+/- 1 deg) at daily resolution in POLAR AHF, provided weekly. Includes gravity-gradient, magnetic-dipole, solar-radiation pressure models & planned maneuvers. Sent to CDHF.

• Monthly Horizon Sensor Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.

• Monthly Sun Sensor Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.

• Monthly Antennae Aspect Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.

Page 13: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

FDF Maneuver Support

• Maneuver Planning, Execution, and Analysis.

– March 2002 - maneuver South Ecliptic Pole

– September 2002 - maneuver to Negative Orbit Normal

– March 2003 - maneuver to Positive Orbit Normal

– October 2003 - maneuver to North Ecliptic Normal

• Sensor Calibration is no longer required, but biases are trended.

• Pointing Trim Maneuvers will be required after 10/2003 due to gravity gradient effect predicted to about .1 degree RA per day, in order to avoid sun angle (thermal) constraints.

Page 14: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

FDF Recommendations

• TBD

Page 15: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

MOC Context Diagram

MOC

RLZP

JPL

R/T H/K Telemetry + Monitor Blocks

CDHF

TPOCC

Ops Schedules

Commands

IRTS Telemetry

Voice-Com

NRT Telemetry

Sensor Predicts & Orbit Event Reports

Maneuver Timelines

FDF

AMF Files for Trend Generation

Command History Reports

IRTS

IRTS Captured Files (contingency)

Page 16: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

MOC Recommendations

• TBD

Page 17: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

CDHF Context Diagram

CDHF

All LZs, CDFs, Command Histories

RLZP

Geotail TTCDs

QL & Day LZ files (31) + SFDUs

Edited & Decom’d NRT streams

Orbit Products

Attitude Products

RDAFs

Geotail TTCDs via email

NSSDC

FDF

ISAS

MOC NRT Data Stream

Command Histories & Ops schedule

RALCluster data products

GroundScienceGround-Based Science Data Products

All LZs & CDFs

KP’s & Hi-Res Products

Calibration Tables

# POLAR products = 53 #WIND products = 32 #Geotail products = 35 #Other products TBD.

Page 18: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

CDHF Costs

• Freeze KPGS at current release, and no system enhancements or upgrades.

• Ops support from 24x7 to 8x5.

• NRT streams not checked pre-pass.

• Data Online for 30 days.

• No dedicated PAC. Will do best effort.

• No reprocessing of KPGS.0

500

1000

1500

2000

2500

3000

3500

FY01 FY02

Fee

ODC

Materials

Staff

Page 19: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

CDHF Recommendations

• TBD

Page 20: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

BACKUP SLIDES

Page 21: REVIEW OF POLAR GS & OPS Primary Audience : POLAR Project Scientist and Deputy Project Scientist Objective : Review the design and Operations of the POLAR

Maneuver Overview

• Update GMAN input files with current and long term Ephem’s, attitude, body-rates, tank temperatures and pressures.

• Determine when beta angle reaches 90 and 93 degrees using long term Ephem, and orbit normal at 3 months from 90 degree beta angle.

• Plan 2 separate maneuver segments, each of which requires duel-station contact allowing for changing antennae aspect angle and eclipses, and which also increase perigee height, and allow for other pulsed maneuver constraints.

• Prepare backup plans in the event of postponement.

• QA the plans and prepare timeline, review results with FDF & FOT.