REVIEW OF POLAR GS & OPS
• Primary Audience : POLAR Project Scientist and Deputy Project Scientist
• Objective : Review the design and Operations of the POLAR Ground System and provide recommendations to relating to possible re-engineering potential of POLAR Ground System.
•Primary Author: Richard Burley – IMAGE GSM–[email protected]
CSOC Cost Disclaimer
• Costs in this presentation are ‘Direct’ costs.– Staff & Immediate Mgmt, Materials, Other Direct costs such as
Travel, Training etc.
– ‘Sustaining Engineering’ costs being changed from ‘Direct to Indirect’ costs, but has been highlighted where it is significant.
• ‘Indirect’ costs being moved to a multi-mission Code-S UPN.
• CSOC Cost Estimates and funding approach are changing on a daily basis, and separating specific costs out of ‘rollups’ is not always accurate.
ISTP Data Flow Overview
FDF
JPL MOC CDHF
RLZP
ScienceTeams
NSSDC
TRK_2-15A
IIRV
cmds
R/T tlm
NR
T data for A
ttitude
Pred
icts
Raw Data Files
AM
Fs for Trending
NRT tlm
Orbit/Attitude
Geo
tail
Eph
em
TT
CD
File
s
Level-0 (QL+Day)
NRT tlm
All Products
ISASG
eota
il T
TC
Ds
Cmd ReportsOps Schedules
Cal_tables
Ext Products
Cap
ture
d IR
TS
data
LZP Context Diagram
JPLCDR
OracleDB
RLZP
RawDataArchive(3.5Tb)
AMF Files
Raw Data Files via FTP
FDF
MOC AMF Files for Trend Generation
Geotail Ephems for s/c Time EstimationAs backup to ISAS TTCD files.
CDHF
Instrument-Specific Level0 FilesBoth Quicklook and Daily + SFDUs
Plus transfer lists
TimeTag Correlation Data Files
‘Packets’
Capture/Rename[c]
Software Sync[c]
MajorFrameAssembly (labview)
MajorFrameDecom (labview)
DataProcessingSystem [c]
Captured IRTS files (contingency)
ISASTapes/CDs of Rawdata (contingency)
LZP Processing Costs
• ISTP LZP processing was reengineered in ’97, requiring approximately 9 FTE’s.
• Reengineering reduced Operations Staff from 13 to 2.25.
• Processing and Products are very Mission and Instrument specific and include numerous ‘artifacts’.
• Further Reengineering unlikely to save more than it costs.
• No mission-specific breakdown of cost available.
0
10
20
30
40
50
60
70
80
90
K$/Fy
Polar
Wind
Geotail
LZP Staff Utilization
• Data Analysis: reviewing run logs for correctness and completeness and delivery.
• Troubleshooting: diagnosis and recovery from h/w & s/w problems, data gaps, network problems.
• Maintenance: System Administration, Oracle DB maintenance.
0
5
10
15
20
25
30
35
%FTE
Data Analysis
Reporting
Processing
Troubleshoot
Maintenance
RLZP Recommendations
• TBD
FDF Context Diagram
JPLFDFTRK-2-15a Tracking Data
RLZP
MOC
NRT H/K data
Geotail Ephems for s/c Time EstimationAs backup to ISAS TTCD files.
CDHF MSASS[Matlab]
GMAN[Matlab]
GTDS[F]
Tlm Capture[F]
IIRV Pointing Data
2-year Orbit Predicts
Orbit Events Predicts
Sensor & Aspect Angle Predicts
Maneuver Plans & Timelines
ACQSCAN
Monthly Orbit Solution & 70-day predict
Weekly DSP Attitude & 70-day predict
POLAR FDF Costs
• This chart is TBD until I get some real numbers from Tim.
0
10
20
30
40
50
60
K$/year
Orbit Products
AttitudeProducts
Maneuver Support
Sustaining
WIND FDF Costs
• Orbit Support:– Trajectory Maintenance.
– Trajectory Design & Contingency Analysis
– Maneuver Planning.
• Sustaining Engineering being moved to multi-mission Code-S UPN.
0
10
20
30
40
50
60
70
K$/Fy
Orbit Products
Orbit Support
AttitudeProducts
Sustaining
FDF Orbit Products
• Monthly Definitive Orbit (+/- 10Km (3-sigma)) at 1 minute resolution in FDF-Ephemeris Format, used internally in FDF for validation of 70-day predicts.
• Predicted 70-day Orbit (+/- 100Km (3-sigma)) at 1 minute resolution in FDF-Ephemeris Format, provided monthly to CDHF.
• Monthly Orbital Events File, includes eclipse times, apogee/perigee times, ascending/descending node times, sent to MOC.
• Quarterly Orbital Events File includes access times to all DSN stations, and eclipse times, put on server for MOC and Science Planners.
• Monthly IIRVs to JPL for DSN antennae pointing.
• LongTerm Predict (2 years) to DSN for mission planning.
FDF Attitude Products
• Weekly Definitive Attitude (single-point solution+/- .2 degrees) in POLAR AHF, generated from r/t data from MOC. Used internally for generation of weekly DSP definitive AHF and Sensor Predicts.
• Weekly Definitive DSP Attitude (single-point solution +/- .2 degrees) POLAR AHF, generated from r/t data from MOC, sent to CDHF.
• 70-day Predicted Attitude (+/- 1 deg) at daily resolution in POLAR AHF, provided weekly. Includes gravity-gradient, magnetic-dipole, solar-radiation pressure models & planned maneuvers. Sent to CDHF.
• Monthly Horizon Sensor Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.
• Monthly Sun Sensor Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.
• Monthly Antennae Aspect Predicts (+/- .2 deg) at 5 minute resolution to MOC via flat ascii file.
FDF Maneuver Support
• Maneuver Planning, Execution, and Analysis.
– March 2002 - maneuver South Ecliptic Pole
– September 2002 - maneuver to Negative Orbit Normal
– March 2003 - maneuver to Positive Orbit Normal
– October 2003 - maneuver to North Ecliptic Normal
• Sensor Calibration is no longer required, but biases are trended.
• Pointing Trim Maneuvers will be required after 10/2003 due to gravity gradient effect predicted to about .1 degree RA per day, in order to avoid sun angle (thermal) constraints.
FDF Recommendations
• TBD
MOC Context Diagram
MOC
RLZP
JPL
R/T H/K Telemetry + Monitor Blocks
CDHF
TPOCC
Ops Schedules
Commands
IRTS Telemetry
Voice-Com
NRT Telemetry
Sensor Predicts & Orbit Event Reports
Maneuver Timelines
FDF
AMF Files for Trend Generation
Command History Reports
IRTS
IRTS Captured Files (contingency)
MOC Recommendations
• TBD
CDHF Context Diagram
CDHF
All LZs, CDFs, Command Histories
RLZP
Geotail TTCDs
QL & Day LZ files (31) + SFDUs
Edited & Decom’d NRT streams
Orbit Products
Attitude Products
RDAFs
Geotail TTCDs via email
NSSDC
FDF
ISAS
MOC NRT Data Stream
Command Histories & Ops schedule
RALCluster data products
GroundScienceGround-Based Science Data Products
All LZs & CDFs
KP’s & Hi-Res Products
Calibration Tables
# POLAR products = 53 #WIND products = 32 #Geotail products = 35 #Other products TBD.
CDHF Costs
• Freeze KPGS at current release, and no system enhancements or upgrades.
• Ops support from 24x7 to 8x5.
• NRT streams not checked pre-pass.
• Data Online for 30 days.
• No dedicated PAC. Will do best effort.
• No reprocessing of KPGS.0
500
1000
1500
2000
2500
3000
3500
FY01 FY02
Fee
ODC
Materials
Staff
CDHF Recommendations
• TBD
BACKUP SLIDES
Maneuver Overview
• Update GMAN input files with current and long term Ephem’s, attitude, body-rates, tank temperatures and pressures.
• Determine when beta angle reaches 90 and 93 degrees using long term Ephem, and orbit normal at 3 months from 90 degree beta angle.
• Plan 2 separate maneuver segments, each of which requires duel-station contact allowing for changing antennae aspect angle and eclipses, and which also increase perigee height, and allow for other pulsed maneuver constraints.
• Prepare backup plans in the event of postponement.
• QA the plans and prepare timeline, review results with FDF & FOT.