36
Vejdirektoratet Guldalderen 12 2640 Hedehusene Telefon +45 7244 3333 [email protected] vejdirektoratet.dk SE 60729018 EAN 5798000893450 Dato 29. januar 2016 Sagsbehandler Stine Kirkeskov Mail [email protected] Telefon Dokument 15/10041-53 Side 1/36 RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 CORRECTION SHEET/ SUPPLEMENTARY NOTICE NO. 4 Fjordforbindelsen Frederikssund, Dual carriageway Marbækvej - Skibbyvej, inclusive of a High Bridge Udbud 14210.001 Vej- og broarbejder This correction sheet sets out the corrections and additions to all the tender material as defined in the Document List (Contractual documents, Tender documents and Information Room documents). Queries from bidders with the associated answers are attached as an appendix. Corrections are shown in bold italics and highlighted in grey. Corrections and additions: Bidders are hereby notified of the following corrections and additions to the tender documents for the above-mentioned contract: To the Bidders

RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

Vejdirektoratet

Guldalderen 12

2640 Hedehusene

Telefon +45 7244 3333

[email protected]

vejdirektoratet.dk

SE 60729018

EAN 5798000893450

Dato 29. januar 2016

Sagsbehandler Stine Kirkeskov

Mail [email protected]

Telefon

Dokument 15/10041-53

Side 1/36

RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4

CORRECTION SHEET/ SUPPLEMENTARY NOTICE NO. 4

Fjordforbindelsen Frederikssund,

Dual carriageway Marbækvej - Skibbyvej, inclusive of a High Bridge

Udbud 14210.001 Vej- og broarbejder

This correction sheet sets out the corrections and additions to all the tender material as defined in the Document List (Contractual documents, Tender documents and Information Room documents). Queries from bidders with the associated answers are attached as an appendix. Corrections are shown in bold italics and highlighted in grey.

Corrections and additions:

Bidders are hereby notified of the following corrections and additions to the tender documents for the

above-mentioned contract:

To the Bidders

Page 2: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

2

Bestemmelser om udbud og tilbud (BUT):

No additions or corrections.

Særlige betingelser (SB):

No additions or corrections.

Særlig arbejdsbeskrivelse/Special Work Specification (SAB/SWS):

Correction to SWS 01 – Design 1.8 (Special environmental requirements):

The Contractor shall take due consideration of the terms and conditions of the following special environmental requirements, as a minimum, for the design and construction of the works:

The construction of the High Bridge shall result in a permanent land

take due to the bridge pier foundations not greater than a total of 0.5

ha in bays and inlets area.

The permanent land take of the salt marsh area in the Natura 2000

area shall not be greater than 0.1 ha.

The permanent land take of the chalk grassland area in the Natura

2000 area shall not be greater than 0.06 ha.

The Contractor shall ensure that all permanent land takes do not ex-

ceed the figures for the various protected areas described above.

All permanent retention ponds shall be located outside the Natura 2000 area and §3 protected areas.

SWS01-00-1.8-010 PMR

Is replaced with:

The Contractor shall take due consideration of the terms and conditions of the following special environmental requirements, as a minimum, for the design and construction of the works:

The construction of the High Bridge shall result in a permanent land

take not greater than a total of 0.5 ha due to the permanent foot-

print of the High Bridge in the water of the Roskilde Fjord. This

footprint is considered to be the sum of the plan area of the

largest elements per pier below water. This covers both the pier

foundation and substructure.

The permanent land take of the salt marsh area in the Natura 2000

area shall not be greater than 0.1 ha.

The permanent land take of the chalk grassland area in the Natura

SWS01-01-1.8-010 PMR

Page 3: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

3

2000 area shall not be greater than 0.06 ha.

The Contractor shall ensure that all permanent land takes do not ex-

ceed the figures for the various protected areas described above.

All permanent retention ponds shall be located outside the Natura 2000 area and §3 protected areas.

Correction to SWS 01 – Design 2.2.3 (Crossfall):

All carriageways for straight sections shall be designed with a crossfall in the range of 20% to 25%. On horizontal curves, the crossfall shall be calcu-lated based on the design speed (Vp) (Planlægningshastighed) and radius at each individual location where superelevation is to be applied.

SWS01-00-2.2-030 MR

Is replaced with:

All carriageways for straight sections shall be designed with a crossfall in

the range of 20‰to 25‰. On horizontal curves, the crossfall shall be calcu-

lated based on the design speed (Vp) (Planlægningshastighed) and radius at each individual location where superelevation is to be applied.

SWS01-01-2.2-030 MR

Correction to SWS 01 – Design 2.3.3.1 (Dimensions):

1) A 0.5 m wide section of the shoulder adjacent to the hard strip shall be

paved for drainage away from the carriageway to a 5 cm high asphalt wedge/kerb. All gullies shall be installed along this 0.5 m paved section on the shoulder.

SWS01-00-2.3-220 PMR

Is replaced with:

1) A 0.5 m wide section of the shoulder adjacent to the hard strip shall be

paved and sloped so that it drains away from the carriageway. The paved section of the shoulder shall be kerbed by an asphalt wedge 5 cm high and 10 cm wide located such that the unpaved section of the shoulder is kept free of the water drained from the carriageway. The slope of the wedge shall face towards the paved area, so that the paved area and wedge form a trough-like shape for the collection of surface water. All gullies shall be installed inside this 0.5 m paved section of the shoulder.

SWS01-01-2.3-220 PMR

Page 4: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

4

Correction to SWS 01 – Design 2.3.4 (Roundabouts):

Roundabouts shall be designed in accordance with the requirements of Table 2-3.

Table 2-3 Requirements for roundabouts

Location Type Central Island Ra-dius (mini-mum)

Connection of the ex-pressway with Skibbyvej and Onsvedvej

Two-lane rounda-bout

50 m

Connection of the north-ern connector road with Ny Landerslevvej

One-lane rounda-bout

23 m

Connection of the south-ern connector road with Ny Landerslevvej

One-lane rounda-bout

23 m

Connection of Ny Landerslevvej with the existing Lyngerupvej

One-lane rounda-bout

23 m

Connection of northern connector road with Mar-bækvej

One-lane rounda-bout

23 m

Connection of southern connector road with Mar-bækvej

One-lane rounda-bout

23 m

SWS01-00-2.3-270 PMR

Is replaced with:

Roundabouts shall be designed in accordance with the requirements of Table 2-3.

Table 2-3 Requirements for roundabouts

Location Type Central Island Di-

ameter (minimum)

Connection of the ex-pressway with Skibbyvej and Onsvedvej

Two-lane rounda-bout

50 m

Connection of the north-ern connector road with Ny Landerslevvej

One-lane rounda-bout

23 m

SWS01-01-2.3-270 PMR

Page 5: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

5

Connection of the south-ern connector road with Ny Landerslevvej

One-lane rounda-bout

23 m

Connection of Ny Landerslevvej with the existing Lyngerupvej

One-lane rounda-bout

23 m

Connection of northern connector road with Mar-bækvej

One-lane rounda-bout

23 m

Connection of southern connector road with Mar-bækvej

One-lane rounda-bout

23 m

Correction to SWS 01 – Design 2.3.13.2 (Pavement design software):

The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts shall be applied at a minimum rate of 150km/m

3 (50

mm).

SWS01-00-2.3-660 PMR

Is replaced with:

For the design of the expressway, connector roads and roundabouts, the thickness of the asphalt concrete binder (ABB) layer shall be a minimum of 50 mm.

SWS01-01-2.3-660 PMR

Correction to SWS 01 – Design 3.2.4 (Retention ponds):

Retention ponds shall be provided with shut-off valves, penstocks or altera-tive suitable means for maintenance purposes.

SWS01-00-3.2-300 MR

Is replaced with:

Outlets from retention ponds shall be provided with shut-off valves, pen-stocks or alternative suitable means for maintenance purposes.

SWS01-01-3.2-300 MR

Page 6: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

6

Addition to SWS 01 – Design, 3.2.13 (Authority approvals and permits):

After requirement ID SWS01-00-3.2-660, the following is added:

The Contractor shall be responsible for applications for and obtaining groundwater discharge permits.

SWS01-00-3.2-661 MR

Correction to SWS 01 – Design 3.3.2.1 (Hydraulic calculations):

Rainfall calculations and internal drainage network sizing shall be based on the Rational Method or the Modified Rational Method.

SWS01-00-3.3-200

PMR

Is replaced with:

Rainfall calculations and internal drainage network sizing shall be based on the Rational Method or the Modified Rational Method in accordance with Skrift 27.

SWS01-01-3.3-030 PMR

Correction to SWS 01 – Design 3.3.2.6 (Pipes and Manholes):

For manholes on the lateral connections, and where a silt trap is necessary, the capacity of the silt trap shall be a minimum of 160 litres. For manholes of 1.25 m diameter silt traps shall have a capacity of a minimum of 250 litres.

SWS01-00-3.3-200 PMR

Is replaced with:

The minimum capacity of the silt trap on the manholes shall be 160 litres. For manholes of 1.25 m diameter silt traps shall have a capacity of a minimum of 250 litres.

SWS01-01-3.3-200 PMR

Page 7: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

7

Correction to SWS 01 – Design 3.3.2.6 (Pipes and Manholes):

Silt traps shall not be provided to manholes with pipe size greater than 700 mm and not for manholes along a main carrier pipe.

SWS01-00-3.3-210 MR

Is replaced with:

Silt traps shall not be provided to manholes with pipe size greater than 700 mm.

SWS01-01-3.3-210 MR

Correction to SWS 01 – Design 3.3.2.6 (Pipes and Manholes):

Carrier pipes shall be laid at a minimum depth of 1.5 m below the finished road surface. In exceptional cases 1.0 m depth shall be allowed, subject to suitable protection being provided and the proposals for same being ac-cepted by the Employer’s Supervisor.

SWS01-00-3.3-240 MR

Is replaced with:

Carrier pipes shall be laid with a minimum cover of 1.5 m below the fin-ished road surface. In exceptional cases 1.0 m depth shall be allowed, subject to suitable protection being provided and the proposals for same being accepted by the Employer’s Supervisor.

SWS01-01-3.3-240 MR

Correction to SWS 01 – Design 3.3.3.2. (Drains and manholes):

Requirement ID SWS01-00-3.3-410 is removed.

Page 8: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

8

Correction to SWS 01 – Design 3.3.4.3 (Layout and access):

Particular consideration shall be given to the design if a retention pond is to be located amongst the summer houses in Tørslev Hage, south of the expressway. The design shall be done in such a way that it minimizes health and safety risks for members of the public. Retention pond em-bankments shall have a maximum slope of a=5. The risk of pond of over-topping shall be minimized and overflows shall not cause flooding in the area.

SWS01-00-3.3-630 PMR

Is replaced with:

Particular consideration shall be given to the design to the retention pond to be located amongst the summer houses in Tørslev Hage, south of the expressway (coordinates x=618278, y=1187156 in coordinate system ETRS 1989 DKTM3/DVR90). The design shall be done in such a way that it minimizes health and safety risks for members of the public. Retention pond embankments shall have a maximum slope of a=5. The risk of pond overtopping shall be minimized and overflows shall not cause flooding in the area.

SWS01-01-3.3-630 PMR

Addition to SWS 01 – Design 3.3.6 (Reopening of Mademose Å):

After requirement ID SWS01-00-3.3-1100, the following is added:

The Contractor shall ensure that suitable measures shall be provided to retain the existing water levels in the stream, so that adjacent marshland areas are not drained.

SWS01-00-3.3-1101 PMR

Page 9: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

9

Addition to SWS 01 – Design, Appendix 1, 2.2.4 (Design Water Levels):

After requirement ID SWS01-A1-00-2.2-020, the following is added:

2.2.4 Design Water Levels

The water levels to be used in the design shall be in accord-ance with Table 2 below.

Level Level Referenced to DVR90 (m)

Highest Astronomi-cal Tide (HAT)

+0.2

Lowest Astronomi-cal Tide (LAT)

-0.1

Mean Water Level (MWL)

+0.05

SWS01-A1-00-2.2-030

PMR

Addition to SWS 01 – Design, Appendix 1, 2.2.4 (Design Water Levels):

After requirement ID SWS01-A1-00-2.2-030, the following is added:

The sea level rise over a 120 year period shall be taken as 1.2 metres. SWS01-A1-00-2.2-040

PMR

Correction to SWS 21 – Scaffolding and Formwork 1.0 (General):

Scaffolding and formwork shall accommodate access requirements as defined in SWS – Workplace (SAB-Arbejdsplads).

SWS21-00-1.0-060 MR

Is replaced with:

Scaffolding and formwork shall accommodate access requirements to the Worksite as defined in SWS – Workplace (SAB-Arbejdsplads).

SWS21-01-1.0-060 MR

Page 10: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

10

Correction to SWS 24 – Concrete, Table 1 (Concrete and constituent material properties):

Cover

21) 23)

Cov-er, min.

mm 50 75 70 70

50 (

drive

n)

70 (

bore

d)

50

SWS24-00-4.5-510 PMR

Is replaced with:

Cover

21) 23)

Cov-er, min.

mm 50 50 75 70

50 (

drive

n)

70 (

bore

d)

50

SWS24-01-4.5-510 PMR

Addition to SWS 33 – Spray Applied Waterproofing 2.1. (General):

After requirement ID SWS33-00-2.1-022, the following is added:

CE marking shall be carried out to ETAG 033. SWS33-00-2.1-022 MR

Addition to SWS 33 – Spray Applied Waterproofing 2.1. (General):

After requirement ID SWS33-00-2.1-022, the following is added:

The following requirements shall as a minimum be fulfilled for the total system:

The bond strength between the waterproofing layer and the concrete support shall be a minimum value of 1.0 MPa in ac-cordance with EN 13596: 2004 (The general modes of failure shall be described in accordance with EN ISO 4624: 2003).

Water tightness in accordance with EN 14694:2005 (without any pre-treatment)

Crack bridging ability (after heat ageing at a temperature of (70 ± 2)°C for (28 ± 0.5) days in accordance with EOTA TR 011: 2004) at -20°C in accordance with EN 14224:2010

SWS33-00-2.1-025 MR

Page 11: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

11

Tilbudsliste (TBL):

No additions or corrections.

Udbudsbetalingsplan:

No additions or corrections.

IKT specifikation:

No additions or corrections.

Contract Document (Totalentreprisekontrakt)

The Contract Document (Totalentreprisekontrakt) will be made available on the Supplier Portal.

Permits and Approvals

Missing appendices related to ’Dispensation fra Naturbeskyttelseslovens §3 til nedlæggelse og

påvirkning af §3 natur’ will be made available on the Supplier Portal

Tegninger/Drawings:

Dgn files for the Illustrative Design Drawings – Structures will be made available on the Supplier Portal

as soon as possible.

Models:

The following revised model will be made available to the Supplier Portal:

- 14210_0200_8200_f4.cl (Centerlinje - Road centerline)

Disclaimer: The drawings and model files form part of the Information Room and as such consti-

tute non-contractual documents. None of the information in a non-contractual document will con-

stitute a contract or any part of a contract with Tenderers. The Employer reserves the right to sup-

plement, withdraw and amend the non-contractual information room documents at any time during

the tender period. The Employer, its respective advisors, consultants, contractors, servants and/or

agents will be under no liability for any error, misstatement or omission in the information room

documents.

Page 12: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

12

Other data files:

No additions or corrections.

Document list:

The document list has been updated to Rev. 4 and will be made available on the Supplier Portal.

Page 13: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

1

14210.001, Fjordforbindelsen Frederikssund Bilag til rettelsesblad 04 Appendix to Correction Sheet 04

Tender Queries:

Vejdirektoratet has received the following queries on the tender material for the above-mentioned tender. The queries and their accompanying

answers appear below:

RET = Rettelsesblad/ Correction Sheet.

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

1. According to the Document list the following docu-ment should be available for download, but we cannot find it on the VD webpage. Please advice when these document will be available.

- dokument 1.4.9 - Principiel tilladelse til etablering af midlertidig arbejdshavn i forbindelse med etable-ring af ny motortrafikvej i Roskilde Fj

- dokument 3.3.30 - Miljø

This document and model will be made available on the Supplier Portal.

RET 1 No

Page 14: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

2

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

2. The following document does not seem to appear on the Document List. Please advice if or where this document is to be placed on the document list.

- Kvalitets-og miljøledelseskrav til totalentrepriser - 14210.001

Bidders are referred to item number 1.2.4 on the Document List.

RET 1 No

3. According to the document list, some of the docu-ment should also be available in English as a ser-vice translation. As far as we can see the following document does not appear to be translated as of yet. Please advice when we can expect the follow-ing documents to be available in English.

- 1.1.2 - Special conditions (SB)

- 1.1.3 - Pricing document (TBL)

- 1.1.6 - Method of measurement (TAG)

- 1.5.1 - Water protocol (Vandsynsportokol)

- 1.6.2 - ICT description (IKT beskrivelse)

Bidders are advised that the service trans-lations for the following documents will be made available on the Supplier Portal.

Special Conditions (SB)

Pricing document (TBL)

Method of measurement (TAG)

There will be no service translations made available for the other documents.

RET 1 No

4. In several documents a reference to a payment plan is mentioned, e.g. SB, ad § 2, stk. 2, item F "Udkast til betalingsplan af 4. december 2015". Could VD please clarify where we can find this payment plan (udbudsbetalingsplan).

Bidders are advised that this document will be made available on the Supplier Portal with this addendum.

RET 1 No

5. Can you provide us with the Inroads/ NovaPoint road model files (DTM, ALG) for all roads within

The relevant Inroads files will be made available to bidders on the Supplier Portal. In relation to the DTM files, bidders are

RET 1 No

Page 15: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

3

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

the project? referred to the 3D road geometry model.

6. Can you provide us with the 3D alignment for the high bridge, it has been left out in the digital road alignment file (14210_0200_8200_f4.cl.dgn)? The pdf drawings showing the same are also missing but they are shown in the drawing list

Bidders are referred to the previous re-sponse to Tender Query 005. The files made available will allow generation of the 3D alignment for all roads including the expressway.

RET 1 No

7. Can you provide us with English service transla-tions of the Danish national annexes if you have these available?

Bidders can see new service translations in the updated Document list

RET 1 No

8. Can you clarify the thickness of the boundary to apply stainless steel in the tidal and splash zone for the high bridge (see SWS01-00-4.6-040)?

The bidder is requested to clarify the exact nature of the query. Bidders are referred to SWS-24 Concrete in relation to require-ments for cover to reinforcement.

RET 1 No

9. Will all bridge specific annexes and guidelines be translated in to English?

Bidders are referred to the previous re-sponse to Tender Query 007 and the up-dated Document List. These documents will be uploaded as they become available.

All documents that are currently available are on the Vejregler website: http://english-vejreg-ler.lovportaler.dk/SearchResult.aspx?t=%2fV1%2fNavigation%2fVejreglerEnglish%2fConstruc-tion+and+planning%2fBridges+and+Highway+Structures%2fEurocodes%2f

RET 2 No

Page 16: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

4

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

10. We urge Vejdirektoratet to consider postponing the deadline for delivering material for the first dialogue meeting for 4 weeks (subsequently also the dialogue meetings). Can that be accomplis-hed?

Bidders are referred to the new programme provided as part of this correction sheet.

RET 2 Yes – see correc-tions in RET 2

11. Regarding BUT, Theme 1 in the first dialogue meeting: Vejdirektoratet has, in accordance with our beliefs, stated that the tenders cost for tendering are to be minimized and that the tender process has been designed with that in mind. Hence, we urge Vejdirektoratet to make the quantities from the illustrative design available for the tenders (no liability). It will reduce the cost for all 5 tenders as neither will have to derive quantities form the same models with the sole purpose of verifying Vejdirektoratets price. We kindly ask Vejdirektoratet please, to make the quantities from the illustrative design available.

Bidders are referred to the models and data made available as part of the Information Room in relation to the calculation of quan-tities. No additional data will be made available by the Employer.

RET 2 No

12. When will DRD publicize changes to the tender material after the first dialogue round?

The DRD expects to publicize an updated version of the Tender Material approxi-mately 2 weeks after the last meeting in the first dialogue round.

RET 1 No

13. We ask Vejdirektoretet, please to supply XML files for all road alignments in order for the tenders to increase the quality of our assessment of quanti-ties. Vejdirektoratet has previously made XML files available in amongst others the Herning - Holstebro tender.

These files will be made available to bid-ders as soon as possible.

RET 2 Yes – see correc-tions in RET 2

Page 17: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

5

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

14. All annex' (bilag) to the Vandsynsprotokol seems to be missing. Please forward these annex'.

For the annex ’Godkendelse i henhold til Miljøbeskyttelsesloven §§ 28, Frederiks-sund Kommune’, bidders are referred to the Document List, items 1.4.8-1.4.15.

The remaining annexes will be made avail-able on the Supplier Portal.

RET 3 Yes – see correc-tions in RET 3

15. Under interim deadline 2a [of the SB] a reference to Appendix 5 in SWS - Design is mentioned, con-taining the Client's design packages. SWS01 - Design only contains up to Appendix 4 (see page 151 in SWS01 - Design). Could VD please provide us with Appendix 5.

It is confirmed that there are only 4 appen-dices to SWS01 – Design. Bidders are referred to section 3.2 of ’Quality and envi-ronment management requirements for turnkey contracts, appendix to SWS Man-agement and Cooperation (“Kvalitets- og Miljøledelseskrav til totalentrepriser, bilag til SAB Styring og Samarbejde") in relation to the design packages.

RET 3 Yes – see correc-tions in RET 3

16. According to interim deadline 2a [of the SB] the design packages for foundations and pillars have to be submitted 8 months after contract signing and according to interim deadline 2c the result of the geotechnical investigations for the high bridge have to be submitted after 12 months. In our in-terpretation there is conflict between these two interim deadlines as we need the result of the geotechnical investigations in order to complete the design for foundations and pillars, ie. 2c comes before 2a. Should the two interim dead-lines have been switched timewise or is interim deadline 2a only dealing with design for founda-tions and pillars for land-based bridges. Please clarify.

Bidders are advised that interim deadline 2c only applies in relation to deviating ground conditions, as further set out in clause 15(4) of the SB.

RET 3 No

Page 18: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

6

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

17. The partial sum of the percentages under HP1 "Projektering" only add up to 50%, whereas in all other HP-groups they add up to 100%. Please clarify.

Bidders are advised that a new version of the Udbudsbetalingsplan will be made available on the Supplier Portal. It should be noted that further changes form part of this document.

RET 3 Yes – see correc-tions in RET 3

18. Please confirm that we have understood the fol-lowing correctly. Every single time we pass under the transmission lines at st. 2.2 with a vehicle taller than 3m we have to call the owner of the transmission line, even though we have estab-lished portals for protection of the transmission line?

This might be many times a day and from 6am to 18pm.

What happens if we cannot get hold of the owner of the transmission line?

How does the Client and/or the owner entend to handle semi-permanent works, like excavation and building up of the road, underneath the transmission linis?

How does the Client and/or owner entend to han-dle the permanent situation with normal traffic taller than 3m passes under the transmission lines?

Bidders are referred to requirement IDs SWS03-00-5.1-030 and SWS03-00-5.2-020 in SWS03-Arbejdsplads, as well as section 9 of SWS 02 – Styring og Samarbejde.

The Employer and the utility owner have agreed the permanent situation, which is to be in accordance with the alignment re-quirements shown on Definition Design Drawing no. 14210-5028.

RET 3 No

19. According to SAB03-1.5.1 (p.2) contract 14210.100 being the road for ch. 8.200-9.100 is complete Nov. 2017, however according to SAB03-3.1.3.1 (p.11) access to the same road is

It is assumed for the purposes of this query that the bidder is referring to contract 14210.200. Bidders are referred to the up-dated version of requirement ID SWS03-

RET 3 Yes – see correc-tion in RET 3

Page 19: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

7

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

stated as being Nov. 2016 (access to site), being one year before. Please clarify.

In case this access road (ch. 8.200-9.100) is not ready before Nov. 2017, how do the Contractor get access to the site compound at Freder-ikssundsvej and the complete site area between Marbækvej and Roskilde Fjord already in Nov. 2016 (which is necessary) when Marbækvej is not allowed for heavy traffic. Please clarify.

00-1.5-010 in Section 1.5 of SWS 03 - Ar-bejdsplads (SWS 03 – Worksite) provided as part of this correction sheet.

20. In "SWS01 - Design" it is given in Clause 4.2.11 that "The design shall allow for a sacrificial thick-ness for the designated design life of the struc-ture. No corrosion protection shall be provided".

The Employer is kindly asked to inform which corrosion rates shall be used for sheet pile walls (design life 120 yrs) as these can not be found in the SWS's.

For corrosion rates to be used in design, bidders are referred to Section 1.1 of Gen-eral Work Specification (GWS) - Founda-tion (Almindelig Arbejdsbeskrivelse (AAB) Betonbro – Fundering).

RET 3 No

21. The SWS specifications and the definition draw-ings do not define the Highest Astronomical Tide, Mean Sea Level or the Lowest Astronomical Tide. The information is provided in the document 14210-ARP-TN-CM-XX-00001. Kindly confirm that these are the levels to be taken for the project.

Bidders are referred to the new require-ment IDs SWS01-A1-00-2.2-030 and SWS01-A1-00-2.2-040 in Appendix 1 of SWS01 – Design, which are provided as part of this correction sheet.

RET 4 Yes - see correc-tion in RET 4

22. The SWS specifications and the definition draw-ings do not outline the sea level rise which is to be used in the project to account for climate change over the service life of the bridge. The document 14210-DHI-RP-CM-22-00001 outlines a study which was done but no definite value is given.

Bidders are referred to the response to Tender Query 021.

RET 4 No

Page 20: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

8

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

Kindly confirm the maximum sea level rise which is to be accounted for during the 120 serivce life of the bridge. Currently the report gives values to year 2100.

23. In Clause SWS01-00-4.3-1200 it states that the navigation clearance is to be +22.2 DRV90. Kindly confirm that this clearance takes allowance for the future sea level rise.

The minimum clearance requirements de-fined in requirement ID SWS01-00-4.3-1200 of SWS01- Design are confirmed and no additional sea level rise needs to be taken into account.

RET 4 No

24. Clarification of query no. 8 answered in RET1:

In Clause SWS01-00-4.6-040 it is stated than stainless steel is to be provided between the tidal zone and splash zone of the piers. In clause SW01-00-4.6-070 it is stated that stainless steel shall be provided as skin friction. Kindly clarify further the boundary section thickness in which stainless steel is to be placed and what is intend-ed by the term skin friction.

Bidders are referred to the updated version of requirement IDs SWS01-00-4.6-040, SWS01-00-4.6-050 and SWS01-00-4.6-060 in Section 4.6.1 of SWS01 – Design pro-vided as part of this correction sheet.

The term ‘skin friction’ is not used any-where in the tender documentation. It should be noted that the Contractor shall determine as part of his design the required cover and type of reinforcement within the requirements of section 4.6.1.

RET 3 Yes- see correc-tions in RET 3

25. Kindly confirm that it is the aesthetic intention that the integral piers in the high bridge will not have a cross tie. Therefore some piers will have one and others will not as per definition drawing 14210-21416-050

Bidders are advised that it is not a particu-lar requirement to have a cross tie beam. Bidders are referred to the additional re-quirement ID SWS01-00-4.3-505 in Table 4-5 of SWS 01 – Design, which forms part of this correction sheet.

RET 3 Yes see correc-tions in RET 3

26. Clause SWS01-00-4.5-030 of SWS01 Design states that the edge beams are permitted to be precast concrete. However clause SWS01-00-4.3-

Bidders are referred to the updated ver-sions of requirement IDs SWS01-00-4.5-030 and SWS01-00-4.5-450 in Section

RET 3 Yes – see correc-tion in RET 3

Page 21: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

9

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

1320 states that a longitudinal construction joints between the deck slab and edge beam for rein-forced concrete construction is not permitted. Additionally in SWS01-00-4.3-450 it is stated that no visible construction joints shall be allowed at the edge beam face. Kindly confirm that all of these clauses are correct.

4.5.1 of SWS01 – Design, and requirement ID SWS01-00-4.3-450 in section 4.3 of SWS01 – Design provided as part of this correction sheet.

27. In the Geotechnical Factual Report we find CPT data included as printouts in the pdf.

Can CPT raw data (recordings) be provided digi-tally ?

Document 1.3.6 - Report 1; Rev 1.0; Geotechnical Factual Report by GEO. Geo Project No. 38042 2015-05-05

- Enclosure 1D.01 (Borehole Logs)

- Appendix 1D.I (Interpreted CPT Logs)

Bidders are referred to the AGS files made available on the Supplier Portal to access the digital version of the CPT and other geotechnical factual data in digital format.

RET 3 No

28. Yesterday [15.07.2016] we received the mail at-tached below regarding new documents on the DRD portal. When activating the imbedded link, no new documents do however appear.

It is confirmed that no new or revised Ten-der Documents were uploaded on the 15

th

January 2016. Please disregard this notifi-cation, which was due to some minor text updates on the webpage.

RET 3 No

29. Topic 2 for the first dialogue meeting, regarding optimized design: It is our understanding that the optimized design for “High Bridge” and “Other Structures” are clearly linked to our status in the Compliance matrix with regard to the “PMR’s”. Can you elaborate on your expectations to, what

Bidders are referred to sections 4.2 and 4.3 of the Bestemmelser om Udbud og Tilbud (Instructions to Tenderers) (BUT/ITT) in relation to the status of mini-mum requirements, preliminary minimum

RET 3 No

Page 22: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

10

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

role the solving of status for the PMR’s in the Compliance Matrix is to have in the dialogue meeting?

requirements and requirements.

Bidders are referred to section 5.4 of the BUT/ITT in relation to the written submis-sion requirements for themes 1 and 2 as well as the focus for themes 1 and 2 for the dialogue meetings.

30. In SWS-Design table 2-3 "Requirements for roundabouts" the minimum radius for the central islands of the roundabouts are specified. A review of the expropriated areas has shown that very little space is left for the actual drivable road area. Is it possible that the amounts shown in table 2-3 are the diameter of the roundabouts instead of radius?

Bidders are referred to the updated version of requirement ID SWS01-00-2.3-270 pro-vided as part of this correction sheet.

RET 4 Yes – see correc-tion in RET 4

31. SAB 03-Workplace, section 1.6.3, describes the excavation of the archaeological investigations, which should be finished before the start of the work. The requirement SWS02-00-3.1-660 de-scribes the archaeological work on the west side of the fjord, which will start early 2017, which is after the start of the execution work November 1st 2016. If these descriptions are correctly under-stood, they are thought to be in conflict with each other, could VD please clarify this?

The current status of the archeological works is that the preliminary archeological investigations are ongoing on the western-most part of the site and are expected to be complete in spring 2016. Bidders may as-sume that all archeological investigations and excavations will be completed on the areas made available to the Contractor at contract start in accordance with Definition Design Drawing no.14210-9004. Bidders may assume that the remaining areas will be made available no later than end of March 2017.

The requirements in SAB02-Styring og

Samarbejde and SAB03-Arbejdsplads will

RET 4 No

Page 23: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

11

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

be updated before the publishing of the

final tender documents based on the status

of the archeological investigations at that

time.

32. In SWS 0.1 - Design Section 2.3.13.2, a require-ment states that the ABB layer on the express-way, connector roads and roundabouts should be placed with the following quantity: 150km / m3 (50 mm). The unit "150 km / m3" is believed to be a mistake and it is therefore desired to be clarified?

Bidders are referred to the updated re-quirement ID SWS01-00-2.3-660 provided as part of this correction sheet.

RET 4 Yes – see correc-tion in RET 4

33. Where is the approved 'klappeplads' in the Katte-gat?

Bidders are advised that the klapplads (disposal site) is Hundested Klapplads (ap-proximate coordinates (WGS 84): 56°03,372' N, 11°53,964' E).

The klapningstilladelse (dumping permit) will be made available on the Supplier Por-tal when received from Naturstyrelsen.

RET 4 No

34. Any form-bearing scaffolding:

A. If there is no traffic under the construction, must the inspection handbook for formwork scaffolding then be followed?

B. If the inspection handbook for formwork scaf-folding must be followed, can the contractor in that case select the assessor? And is the contractor therefore also responsible for the approval of the scaffolding project by 3rd parties?

This tender query will be addressed as soon as possible.

Page 24: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

12

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

35. Who establishes and maintains the Project web? The client or the contractor?

It is confirmed that the Projectweb will be established and maintained by the Employ-er.

RET 4 No

36. Are there any requirements for the Project web? Bidders are referred to the previous re-sponse to TQ035.

RET 4 No

37. Is the Danish Road Directorate going to provide any further English service translation of tender documents? And, if this is the case, of which doc-uments, and when?

Bidders are referred to the previous re-sponses to TQ003 and TQ009. It is con-firmed that no further English service trans-lations will be made available.

RET 4 No

38. Document 1.1.5 of Document List, namely "Con-tract Document", is marked as "Available at later stage". Could you inform us about when this doc-ument will be made available?

The Contract Document (Totalentreprisek-ontrakt) will be made available to bidders on the Supplier Portal.

RET 4 Yes – see correc-tion in RET 4

39. Reference is made to.alg files which have been published on the Supplier Portal with Correction sheet/Supplementary notice Nr. 2. These files contain vertical profiles with parabolic curves ra-ther than circular curves, as it would be usual in Denmark. Is this a conversion issue, so the de-signed values should be circular, or are the verti-cals intentionally designed with parabolic curves?

Bidders are advised that all Inroads files have been issued for information only and there is no conversion issue. All vertical curve detailed design shall be carried out in accordance with Section 6.3 of ‘Handbook, Layout in Open Country (Håndbog, Tra-céring i Åbent Land)’.

RET 4 No

40. In case there are discrepancies between the com-pliance matrix and the different documents re-ferred to in the Compliance matrix. Which are we

It should be noted that the purpose of the Compliance Matrix is to identify the Bidder's compliance with the requirements of the tender documents and that it only contains

RET 4 No

Page 25: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

13

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

to consider correct?

From an contractual point of view, we know that the Compliance matrix out rank i.e. the SWS’es, however we believe that in some cases, the in-formation given in the tender documents may in fact be the correct one.

requirement IDs.

In case of any discrepancy, bidders are referred to the document hierarchy in SB ad § 2, stk. 2.

41. Full application and full permissions, including enclosures are needed [for Application of Excep-tion to the Nature Protection Act concerning pro-tected areas related to the new Fjord link located by Frederikssund]

It is assumed that the bidder is referring to document no. 1.4.2 of the document list (Dispensation fra Naturbeskyttelseslovens §3 til nedlæggelse og påvirkning af §3 na-tur).

The permit and all appendices to the permit are available on the Supplier Portal and the application is included in appendix 1 (Bilag 1) of the permit. Some of the appendices to the application are missing, and these will be made available on the Supplier Portal.

RET 4 Yes – see correc-tion in RET 4

42. Referring to PMR reference SWS01-0-1.8-010. Does the 0.5ha requirement applies to all pilecaps and footings along the High Bridge, or only to those exposed pilecaps (i.e. seabed level below -3.2m DVR90) within Roskilde Fjord.

Bidders are referred to the updated version of requirement ID SWS01-00-1.8-010 pro-vided as part of this correction sheet.

RET 4 Yes – see correc-tion in RET 4

43. Referring to PMR reference SWS01-00-4.3-450 Please provide more detailed definition of a visible construction joint. What concrete surface finishing requirement is required for an invisible construc-tion joint? Is it permitted to apply external clad-

Bidders are referred to the previous re-sponse to Tender Query 026 and the up-dated requirement ID SWS01-01-4.3-450 in Section 4.3 of SWS 01 – Design, provided

RET 4 No

Page 26: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

14

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

dings to cover up the visible construction joints? as part of Rettelsesblad Nr. 3.

44. Referring to PMR reference SWS01-00-4.3-510, please clarify whether the use of combination of bearings and monolithic pier which belongs to the same pier shape group is permitted.

Bidders are advised that there is no re-quirement that restricts a combination of articulated and integral piers within one pier option. Bidders are also referred to the previous response to Tender Query 025 in relation to this query.

RET 4 No

45. Ship Impact Load as defined in SWS01, Appendix 1, Section 2.3.8.1 Table 2, Please define in which areas seabed level <-1.10m and seabed level >-1.10m shall be assumed.

Bidders are referred to requirement ID SWS03-00-1.0-010 in SWS03 – Ar-bejdsplads.

Relevant models have been made availa-ble as part of the Information Room Docu-ments. Bidders are reminded that Infor-mation Room Documents are non-contractual documents that are issued as a service to bidders and provide background information on the Fjord Link Frederikssund Project.

RET 4 No

46. Iceload as defined SWS01, Appendix 1, Section 2.3.3 PMR reference SWS01-00-4.3-510. Please define at which level Ice loading shall be assumed

Bidders are referred to requirement IDs SWS01-A1-00-2.3-180 to SWS01-A1-00-2.3-240 inclusive in Section 2.3.3 of SWS01 - Design – Appendix 1; as well as the response to Tender Query 021 provid-ed as part of this correction sheet.

RET 4 No

47. Please advise whether there is any highest and lowest design sea level for the design of High Bridge.

Bidders are referred to the response to Tender Query 021 provided as part of this correction sheet.

RET 4 No

Page 27: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

15

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

48. Referring to PMR reference SWS01-00-4.6-070. Please clarify whether there is any minimum or maximum rebar size requirement for stainless steel rebar. Please clarify whether the skin rein-forcement refers to outermost layer of rebar at the pier section, or the outermost layer of rebar at each directions.

In relation to size requirements for stainless steel reinforcement, bidders are referred to General Work Specification (GWS) – Con-crete (Almindelig Arbejdsbeskrivelse (AAB) – Beton) and to General Work Specification (GWS) – Reinforcement (Almindelig Ar-bejdsbeskrivelse (AAB) – Slap armering), particularly the references in Section 1.1 of both of these documents.

Bidders should note that these references set out further requirements for the design of skin reinforcement (also known as sur-face reinforcement).

RET 4 No

49. Can Vejdirektoratet provide dwg and/or dgn ver-sions of the Illustrative Design Drawings – Struc-tures. This will save time in the tender phase.

Dgn files for the Illustrative Design Draw-ings – Structures will be made available on the Supplier Portal as soon as possible.

RET 4 Yes – see correc-tion in RET 4

50. Clause SWS01-00-4.3-080 refers to pre-stressed reinforcement. Please clarify whether in this Clause for pre-stressed reinforcement it is in-tended post-tensioned strand tendons as well as post-tensioned bars (f.ex. Macalloy bars)

This tender query will be addressed as soon as possible.

51. Clause SWS01-00-4.3-030 refers to prestressed reinforcement and prestressing steel. Please con-firm that in this Clause for prestressed reinforce-ment it is intended pre-tensioned strand tendons, and with prestressing steel it is intended both post-tensioned strand tendons and post-tensioned bars, as well as pre-tensioned strand tendons .

This tender query will be addressed as soon as possible.

Page 28: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

16

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

52. As it can be understood from the two queries above, it appears that the words prestressed rein-forcement in Clause SWS01-00-4.3-030 and pre-stressed reinforcement in Clause SWS01-00-4.3-080 are not used consistently. Please clarify.

This tender query will be addressed as soon as possible.

53. Please confirm that in Clause SWS01-00-4.3-080 for "high voltage" it is intended "high stress". Please clarify what is the criteria to define a "volt-age/stress" as being high or low.

This tender query will be addressed as soon as possible.

54. With reference to Clause SWS01-00-4.3-080 please clarify whether for "….any given section" it is intended only the sections in areas with high stress variations.

This tender query will be addressed as soon as possible.

55. Please confirm that the intention of Clause SWS23-00-3.9-010 is to:

1) not allow the removal of the formwork "before that the concrete strength has reached the 28-days value", rather than "before the day no.28";

2) not allow the removal of the formwork until the 100% of compressive strength is achieved, de-spite the compressive strength is suffient to allow the prestressing transfer and to withstand the selfweight load effects.

This tender query will be addressed as soon as possible.

56. SWS01-00-4.3-1270 Figure 11 outlines the span to depth ratio. Kindly confirm that the intention of the graph is to define a span-depth of 1:21 for spans up to 73.5m and for spans greater than this

This tender query will be addressed as soon as possible.

Page 29: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

17

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

the maximum depth permitted is 3.5m.

57. SWS01-00-4.2-1400 States that bearings are to be of the "same type". Kindly confirm that this statement relates to being from the same manu-facturer rather than all bearings having the same type of allowable articulation i.e fixed, guided, free

This tender query will be addressed as soon as possible.

58. In SWS01, Section 7.2.5 it is given that the Con-tractor in his design of the retaining walls at Tørslev Hage is to design it for 20 kN/m2 placed on the terrrain behind the walls.

Do the Contractor in his design of other structures, e.g. for the approach ramps (embankments) for the high bridge, need to consider any surface loads applied to the terrain outside the roads?

This tender query will be addressed as soon as possible.

59. In accordance with SWS01, Section 4.3.2 all per-manent structures (exept one) shall be designed in consequence class CC3 (KFI = 1.1) and reliabil-ity class RC3.

Firstly, does the given consequence class also apply for temporary structures and permanent structures in temporary stages or is the Contractor free to design these in CC2?

Secondly, the reatining wall at Tørslev Hage is also to be designed in CC3. The Contractor do not understand the reason for this as the retaining wall in general has a low wall height, the soils are not complex and there are no great risk for loss of human life or economic consequences. Are the

This tender query will be addressed as soon as possible.

Page 30: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

18

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

Employer willing to change it to CC2 for the retain-ing wall at Tørslev Hage?

60. Can the digital data in the Employer´s inves-tiogation for the geophysical logging be delivered?

This tender query will be addressed as soon as possible.

61. Reference to document ABT 93 - General Condi-tions for Turnkey Contracts, article 8 "Insurance", which states that "at the request of the contractor, the contractor or any sub-contractor shall be in-cluded as insured under the insurance policy [of the employer]". Reference also to Re 8(2) of document "SB - Ser-vicetranslation - 14210.001" which states that "The employer is self-insured. The cover provided for in clause 8(1) of ABT 93 in respect of the con-tractor and subcontractors, if any, is comprised by the self-insurance". May we kindly ask that the Danish Road Direc-torate to provide the bidders with copies of the applicable insurance(s)?

This tender query will be addressed as soon as possible.

62. Reference to the Dialogue Topics listed in clause 5.3.4 of Instructions to Tenderers, and to the Pre-liminary Structure of Dialogue Rounds set forth in clauses 5.4.4 and 5.4.7 of the same document, this is to ask if it would be possible to add other topics which the Tenderers may wish to discuss, and in such case how these additional topics should be dealt with for both submission and dia-logue purpose (for instance, would they be subject to any word/page limitation in the submission, and should the tenderer propose a revised structure of

This tender query will be addressed as soon as possible.

Page 31: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

19

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

dialogue round to fit the additional topic(s)?).

63. Question concerning the award model. Under the header 'Evaluation of the sub-criterion A - Price’ VD mentions that the calculation model will be published after completion of the dialogue stage. However it would be appreciated to have an im-pression of the weighing of the documents B, C, D and E that have to be submitted in July. Therefore we kindly ask VD to define the calculation prior to the dialogue phases?

This tender query will be addressed as soon as possible.

64. The contractor would like a clarification on wheth-er the minimum asphalt thickness of 150 mm (Re-quirement SWS01-00-2.3-690) is with or without the 10 mm adjustment of the MMOPP2013 calcu-lation from Table 2-10 (Requirement SWS01-00-2.3-650), or said otherwise; is the actual minimum asphalt thickness 150 or 160, given the MMOPP2013 requirement?

This tender query will be addressed as soon as possible.

65. "Nature Protection Act (Naturbeskyttelsesloven)§ 3 determines the need to establish compensation for the loss of nature areas. Is it the contractor or client who should establish these? See also: 'Di-spensation fra Naturbeskyttelsesloven § 3 til ned-læggelse og påvirkning af §3 natur ved etablering af Ny Fjordforbindelse over Roskilde Fjord,' date August 20, 2015, see pages 1 and 2. "

This tender query will be addressed as soon as possible.

66. In SWS-Design, table 2-12, is the minimum pavement thickness for the bicycle paths required to be 500 mm minimal. In table 2-11, of the same document, is the minimal pavement thickness

This tender query will be addressed as soon as possible.

Page 32: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

20

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

required to be 600 mm in total (20mm PA + 80mm GAB + 200mm SG + 300 mm BL). Which of these thicknesses are correct?

67. No description of the general pavement in the middle reserve can be found. Could the client please clarify if the middle reserve will be laid with top soil, or an SG pavement, and what pavement type/build-up is preferred for the section at Tørslev Hage

This tender query will be addressed as soon as possible.

68. Drawing 14210-9004 contains areas at Onsvedvej, marked as temporary expropriated (At Onsved) and permanently expropriated (At the intersection between Onsvedvej and Tørslevvej). What works are carried out at these locations, and are they a part of this tender?

This tender query will be addressed as soon as possible.

69. Regarding general requirement for bridge materi-al: As we see the requirements it still leaves it open to design something else than a concrete bridge. Is this correctly understood. Please clarify?

This tender query will be addressed as soon as possible.

70. SWS05-Earthworks, §5.4.1. Could you please define the term "filling coefficient"? If possible with a formula.

This tender query will be addressed as soon as possible.

71. SWS05-Earthworks, §7.1. In paragraph 7.1 you refer to "§19 (Other Documents - Authority Ap-provals (Andre documenter - Myndighedsgodken-delser))". We could not find that document. Could you tell us the title and/or name of the document on the document list or your web site or, in case it is not there, provide us with that document on

This tender query will be addressed as soon as possible.

Page 33: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

21

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

short notice?

72. SWS03-00-1.0-030: This requirement states that the contractor has to comply with all protocols and requirements resulting from the expropriation, in so far as they relate to the design, construction and completion of the works, but without knowing these protocols and requirements. Can you give us some reasonable assumptions we can use for our offer?

This tender query will be addressed as soon as possible.

73. In many requirements it is stated that we have to submit documents to the "Employer's Supervisor" prior to the realization. After submitting the Em-ployer's Supervisor has to approve the document. Can you indicate a standard procedure with the maximum number of days for the Employer's Su-pervisor to answer? And if the maximum number of days to respond depends on the requirement, please indicate per requirement the maximum response time. Can you indicate which criteria the Employer's Supervisor will use for approval? "

This tender query will be addressed as soon as possible.

74. Reg. SWS20-00-2.3-010: Could you explain to what inspection document you refer?

This tender query will be addressed as soon as possible.

75. Reg. SWS20-00-3.6-090 : Could you please de-fine the term "hard pile driving"?

This tender query will be addressed as soon as possible.

76. Reg. SWS20-00-3.7-150 & SWS24-00-4.5-040: The mentioned requirement in SWS20 seems to allow Tremie pipes under water and requirement in SWS24 does not allow this. Can you explain

This tender query will be addressed as soon as possible.

Page 34: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

22

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

this?

77. Reg. SWS20-00-4.5-040 : This requirement de-scribes that the core recovery has to be 100%. What if this is not the case, but we do comply with the 50cm concrete and 150 cm bed rock?

This tender query will be addressed as soon as possible.

78. Reg. SWS21-00-2.2-020 & SWS01-00-4.2-430 & 440: The requirement from SWS21 ""Board form shall be used on all visible surfaces"" seems to contradict with the requirements from SWS01 ""Exposed vertical surfaces with a surface area greater than 10 m2 shall receive a pattern profiled finish."" and ""If a pattern profiled finish is to be provided, the Contractor shall submit the pro-posed pattern profile finish to the Employer’s Su-pervisor for acceptance before the work is carried out, within a timeframe which shall be agreed with the Employer’s Supervisor. The formwork lining shall leave no stain on the concrete and shall be so joined and fixed to its backing that it imparts no blemishes." A pattern could produce a blackened surface over the years. What is your vision on this item?"

This tender query will be addressed as soon as possible.

79. Reg. SWS21-00-2.2-040: How should we interpret "For the High Bridge, forming boards (an engi-neered formwork system) shall be used."

This tender query will be addressed as soon as possible.

80. Reg. SWS22-00-3.7-020: "Welding of reinforcing steel on site or any casting yard shall not be per-mitted." Are there any specific conditions possible under which we can weld reinforcement steel? "

This tender query will be addressed as soon as possible.

Page 35: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

23

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

81. Reg. SWS22-00-4.0-020: "Testing shall be per-formed by a testing agency accepted by Employ-er’s Supervisor." Can you confirm that this re-quirement refers to all tests to be performed on reinforcement steel within this contract? "

This tender query will be addressed as soon as possible.

82. Reg. SWS24-00-2.1-100: "The addition of calcium chloride, accelerators, retarders or set controlling admixtures and air reducing agents are not per-mitted." If we cannot use retarders, the use of concrete in the pile caps and piles may be influ-enced negatively

This tender query will be addressed as soon as possible.

83. Reg. SWS24-00-3.1-010: "To ensure proper aera-tion and frost resistance of the concrete, the con-crete cover zone shall not be vibrated using rod vibrators for surfaces which are cast against formwork." Could you please explain at what dis-tance we CAN use rod vibrators to ensure the quality surface cast against formwork?"

This tender query will be addressed as soon as possible.

84. Reg. SWS24-00-3.2-030 "Vertically, the pier shall be inclined at 1 in 1000 mm from the top of the foundation." However in the design drawings tell us an inclination of 1:20, 1: 16 and 1: 80. How should we interprete this requirement? "

This tender query will be addressed as soon as possible.

85. Reg. SWS24-00-3.2-040: Refering to the founda-tion: ""In plan, the location of the pier shall be within ±50 mm of the specified location in orthog-onal directions."" and ""The levels shall be within ±25 mm of the specified level."When we define pile as the bottom part of the foundation. On top of the piles is the pile cap and the piers are between

This tender query will be addressed as soon as possible.

Page 36: RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 4 …leverandorportal.vejdirektoratet.dk/Lists... · The asphalt concrete binder (ABB) content on the expressway, connector roads and roundabouts

24

Nr. Query Answer Answer in Ret no.

Tender Correcti-ons

the pile cap and girder, can we assume that the word ""pier"" must be replaced by ""pile""?"

86. The scope of casings and irrigation pipes, de-scribed in chapter 1 of SWS18-Miscellaneous works, is not clear. Would the client please clarify the works of these pipes?

This tender query will be addressed as soon as possible.

87. Does VD have any requirements to the material used on the "wide" shoulder?

This tender query will be addressed as soon as possible.