Page 1 of 4 DEVENDRA KUMAR E-Mail: [email protected] Phone : +91 9958170738 Address : B-1, GDA Police Colony Patel Nagar III Ghaziabad (U.P.) India SENIOR MANAGEMENT PROFESSIONAL IN CIVIL / CONSTRUCTION FIELD Strategic planning… operational excellence… Project management… multi project vision… Manage day-to-day operational aspects of projects and project scope by effectively applying methodologies that enforce project standards and by minimizing exposure and risks on project. Create and execute project work plans and revise as appropriate to meet changing needs and requirement, including the identification of needed resources and assignment to appropriate personnel. KEY PROJECTS EXECUTED RCC Over Head Tanks at various places in India Residential & commercial buildings in Delhi ,Ghaziabad & Mysore Multi-storey 1000 unit housing project in Libya Mass RCC structure (bridges, siphon, regulators etc) in Narmada main canal Infrastructure development Roads, sewerage, storm & water supply, street lighting network in 2 cities of Libya Sewerage treatment plant, Pumping station, 220 KV sub-stations & Solar power projects FIELD OF RESPONSIBILITIES Overall head of project execution upto 400 million dinnar in abroad and 200 crore in India Leading a team of 75 staff and 800 workers. Expertisation over the project from mobilization to finish. Entire leading over the following division Micro planning, Client billing, Execution. Q/C, Safety design & drawing, Accounts, Local procurement Cost control Reconciliation Liasioning & correspondence with client. ACHIEVEMENT 1. Streamline & completion of bunged project in 6 month (Azizia infrastructure project in Libya – 20 million Dollars) 2. Completion of 220 KV sub-station before the scheduled period. 3. Enhancement of progress & reduced the cost by 30% in 1000 unit multi-storey housing project in Sirt. 4. Introducing new MIS system to be more transparency to the top management. 5. Complete the project from mobilization to evacuation of power in a shorter span of 100 days and save the penalty of 2 crore from govt.(5MW Solar Power Project) 6. Introducing a technical design of formwork of conical dom at 30 meter height concreting 30 cm thick without any support from ground In RCC over head tank

resumepf

Embed Size (px)

Citation preview

Page 1: resumepf

Page 1 of 3

DEVENDRA KUMARE-Mail: [email protected] Phone : +91 9958170738Address : B-1, GDA Police Colony Patel Nagar III Ghaziabad (U.P.) India

SENIOR MANAGEMENT PROFESSIONAL IN CIVIL / CONSTRUCTION FIELDStrategic planning… operational excellence… Project management… multi project vision…

Manage day-to-day operational aspects of projects and project scope by effectively applying methodologies that enforce project

standards and by minimizing exposure and risks on project. Create and execute project work plans and revise as appropriate to

meet changing needs and requirement, including the identification of needed resources and assignment to appropriate personnel.

KEY PROJECTS EXECUTED

RCC Over Head Tanks at various places in India

Residential & commercial buildings in Delhi ,Ghaziabad &

Mysore

Multi-storey 1000 unit housing project in Libya

Mass RCC structure (bridges, siphon, regulators etc) in

Narmada main canal

Infrastructure development

Roads, sewerage, storm & water supply, street lighting

network in 2 cities of Libya

Sewerage treatment plant, Pumping station,

220 KV sub-stations & Solar power projects

FIELD OF RESPONSIBILITIES

Overall head of project execution upto 400 million

dinnar in abroad and 200 crore in India

Leading a team of 75 staff and 800 workers.

Expertisation over the project from mobilization to

finish.

Entire leading over the following division

Micro planning, Client billing, Execution. Q/C, Safety

design & drawing, Accounts, Local procurement

Cost control

Reconciliation

Liasioning & correspondence with client.

ACHIEVEMENT1. Streamline & completion of bunged project in 6 month (Azizia infrastructure project in Libya – 20 million Dollars)

2. Completion of 220 KV sub-station before the scheduled period.

3. Enhancement of progress & reduced the cost by 30% in 1000 unit multi-storey housing project in Sirt.

4. Introducing new MIS system to be more transparency to the top management.

5. Complete the project from mobilization to evacuation of power in a shorter span of 100 days and save the penalty of 2

crore from govt.(5MW Solar Power Project)

6. Introducing a technical design of formwork of conical dom at 30 meter height concreting 30 cm thick without any support

from ground In RCC over head tank

EXPERIENCE: OVERALL 28 YRS EXPOSURE IN VARIOUS CIVIL FIELD

ANS Construction Limited

General Manager (projects)

Jul, 12 – Cont

Residential housing 500 no’s , luxury & town hose villas (200 crore)

Infrastructure

Managing overall operations for executing projects within budgeted cost, demand

forecast & time parameters, project planning, budgeting, monitoring and control.

Providing technical inputs for methodologies of construction & coordination with site

management activities.

Steering costing, making bills, approval from the authorities and handing over after

completion of each project.

Coordinating with main contractors, monitoring their performance in view of project

schedule. Settling all the techno-commercial disputes and clarifications during execution

of project

Conducting meetings with client & consultant on contractual matters regarding progress

of works, claim situations and other construction issues. Liaising with government

agencies for obtaining various approvals / clearances.

Page 2: resumepf

Page 2 of 3

Punj Lloyd Limited

Dy. General Manager (P)

May, 11-Jun, 12

5MW Solar Power project in Raiasthan, having 20,000No’s auger pilling

Installation of 80,000 No’s PV module

Transmission line 8 km with lattice tower

Overseeing entire operations for execution, starting from mobilization to finishing end for above mentioned project which involve the execution of civil works in 25 acre area, containing 20,000 no’s piling, 2.2 km fence, structure & 80,000 no’s of module erection. Installation of electrical equipment and all related control building.

Liaising with client, labor department and marketing team for smooth project execution. Introducing MIS system for smooth functioning and to get assistance from H.O.

Apprehending the system to cost control and its implementation.

Addl. General Manager (P)

D. S. Construction Libya

(Jan 99 - May, 11)

1000 Unit Multi-storey housing project in sirt Libya (400 Million Dinar)

Construction of recreation & guest house building at sabarata Libya

Utility and infrastructure project in zufra Libya

Sewerage treatment plant at surman Libya (capacity 40 cusec)

Construction & installation of 4 No’s 220 KV sub-station

Responsible for execution, Monitoring, preparation of review and statistical data to ensure timely completion. Identifies resources needed and assigns individual responsibilities. Bringing about optimum utilization of resources- labour, materials and equipment, and ensuring their procurement at most cost-effective terms Administrative function to get rid over impede of work.

Liaising with client to get more economic assessment and standing of organization. Coordination with billing section to improve the values and assertion over superfluous

career.

Coordinating and controlling the activities of project subcontractors and testing of submitted tasks to ensure their compliance with QC guidelines.

Creating detailed reports enumerating variances and causes of delay and solution measures undertaken.

Exercising control over administrative matters and cash flow.

Engineer (civil)

Larsen &Toubro Limited

(Aug, 96 - Jan, 99)

PARLIAMENT LIBRARY BUILDING, NEW DELHI

Fore fronting entire operations for executing complete structural work for 2 basement and

2 floors of area 2500 sqm with all coffer slabs.

Form work in wall and in coffer slab using Doka frame work.

Wall Cladding – Rough cast red sand stone, fine chisel sand stone.

Window pattern with stone mullian and threshold.

Floors – Marble. Kota, jaselmer, granite, hardonite concrete and rangoli pattern.

Project Engineer(civil)

Ansal Housing &

Construction Limited

(Dec, 93 – Apr, 96)

RESIDENTIAL HOUSING PROJECT AT CH. VIHAR GZB Spearheading entire project operations for construction of 500 houses as Departmental

and Another 500 with sub agencies. Formulating contract and construction schedules.

Developing Equipment/ Resources usage plan. Determining milestones to support project

schedule, including identification of contractual milestones.

Preparing Monthly and Fortnightly progress and projection report.

Assistant Engineer (civil)

Continental Construction

Limited

(Sep, 90 – Dec, 93)

NARMADA MAIN CANAL : 110 M wide & 30 Km Long

STRUCTURE : Bridges, siphon, cross-regulator etc

EARTH WORK : Mass excavation

LINING : RCC both in bed and slope

Spearheading complete structural operations of 110 m long canal bridges, siphon and

Page 3: resumepf

Page 3 of 3

cross regulators. Developing design and usage of acrow formwork for scaffolding. Making

of PRW bills. Preparing all bar-bending schedules.

Responsible for mass concreting for all structure. Design and bolting of groove for the

gates in Cross-regulator.

Undertaking design and fabrication of haunches and fillet formwork. Preparing layout of

structure and coordinating shifting using triangulation survey.

Junior Engineer (civil)

Jaiprakash Associates

Construction Limited

(sep, 87 – Sep, 90)

LAKHWAR DAM PROJECT (COFFER DAM)

UNDER GROUND POWER HOUSE (TUNELLING & RIB ERECTION)

Administering entire project operations for execution of underground power house

including rock excavation, design of profile, drilling, blasting using long delay detonator

and ANFO.

Conducting survey work for shifting of coordinate using triangulation survey, cross-

section in hill area using tachometry survey.

Undertaking erection of rib inside the tunnel, rock bolting, guniting and shotcreting.

Developing platforms for batching plant i.e. for ice plant, chilling plant and inundation

bins, etc,

Site Engineer

The Marwah Company

(Jul, 84 – Sep, 87)

R.C.C. OVER HEAD WATER TANKS

Overseeing entire operations for execution of 1250 cum capacity R.C.C. overhead water

tanks including designing of form work for circular shaft and conical dome.

Liaising with client, labour department and marketing team for smooth project execution.

SCHOLASTICS

1. Diploma in civil engineering (1983) from AMU Aligarh in first division with distinction in RCC.2. Intermediate 10+2 (1979) from U.P. Board in first division with distinction in physics and math.3. High School (1977) from U.P. Board in first division with distinction in science and mathematics.4. IT Forte: Well efficient with working on computer with various basic and advanced applications, such as MS Office, MS

Excel, etc.

ATTENDED TRAINING

Awareness-cum Training Programme on ISO 9001-2000, Sirte Libya; 2005 The e-WORLD awareness Skill 2001 from CMC Limited (A Govt. of India Enterprises)

PERSONAL DOSSIER

Date of Birth : 25th April 1963 Address : B-1, G.D.A. Police Colony, Patel Nagar III, Ghaziabad – 201001, U.P. Passport Number : E- 6322353, valid till 20-06-2015 Linguistic Abilities : English, Hindi & Arabic