    PRAVEEN KUMAR ANANTARAPU

    [email protected] +91 90100977

    Objectives

    Utilizing every opportunity to strengthen the career with technical skills & Hardworking for the

    growth of Organization as well as the career with innovative ideas.

    HIGHLIGHTS

    5.5 years experience as Electrical Engineer (O&M) in Thermal power plant.

    Operation and maintenance of2*150 MWGenerator with Brushless Excitation System

    and Synchronization with 400kv grid.

    Operating the Electrical LT & HT switchgear panels and participating in Plant

    synchronizing with Gird.

    Handling Plant Operation confidently & continuously monitor parameters in the DCS.

    Coordination with maintenance team at the time of Annual inspection, shut down,

    Preventive maintenance and Break down maintenance.

    Implementing Standard Operating Procedures, equipment lockout and tag out

    procedures of power plant as per international standardization of organization

    Performing the functions of troubleshooting and breakdown/preventive/corrective

    maintenance for reducing downtime to minimum.

    Professional summary Working as aSeniorEngineer- Electrical (2x150MW, CFBC Boiler) inO&M Dept. in

    HofinconsatMeenakshi Energy Power PlantNellore from October 2015 to till date.

    As an Electrical Engineer and Responsible for the safe operation of Electrical Feeders and

    Auxiliaries, Troubleshooting of Electrical Equipment.

    Operation and maintenance of180MVA, 40MVA, 2.5MVAPower transformers, auxiliary

    transformers. (Make: ABB, VOLTAMP).

    Handling theTurbine, Balance of Plant, Electrostatic Precipitators, Ash handling plantand Coal handling plantDepartments through DCS as engineer in Operation dept.

    Worked in the erection of 33/11Kv substation, connected 11kv lines, HT Switchgear.

    Knowledge in Current Transformer & Potential Transformer Testing, Generator,

    Transformer and Motor Testing.

    Had trained in Auto-Cad, Programming Logic Controllers, Siemens S7-400 series (IGIAT

    Intuition).

    Professional Experience Meenakshi Energy Power Plant

    | O&M Site June2011 till date

  • 7/26/2019 resume_956716_1448173040

    2/4

    PRAVEEN KUMAR ANANTARAPU

    Operation & Maintenance Services byTata Power LTDfor Unit-1&2-2X495TPH AT

    143ATA & 540 5CIR-CFBC Boiler, Single Drum and Natural Circulation.

    Operation and Maintenance of2*150 MWGenerator with Brushless Excitation System

    and Synchronization with 400kv grid.

    Operation and Maintenance of400 KV (one and half breaker scheme)Switchyard,

    Isolators and Earth Switchesaccording to respective interlocks.

    Operation and Maintenance of180MVA, 40MVA, 2.5MVAPower transformers, auxiliary

    transformers. (Make: ABB, VOLTAMP).

    MaintainingTheVARwithin limits according to grid loads, to operate the alternator

    within the stability limits by following the generatorsPQ CAPABILITY CURE.

    Supervising the functions of troubleshooting & predictive / preventive maintenance for

    identifying areas of obstructions and reducing machinery downtime to minimum.

    Actively Coordinated along with electrical testing team at the time of plant shutdown,

    testing such as alternator, GT, ST, UAT, Protective relays.

    Control Operation and Maintenance of Electrical power system equipment as per safety

    rules and work permit system (PTW/LOTO) System at plant.

    Responsible for safe operation ofTurbo-Generator, Generator Transformer (GT),

    Distribution Transformer, LT & HT motors, Switchgears (MCC, PCC & HT Panels), plant

    Protection systems, Diesel generator sets.

    Attending Tripping, Plant Black out Conditions, Emergency & Failure of Line, Other

    Critical Equipment and Restore the Power as Earlier as Possible.

    Working withABB ABTSystem for Preparation of daily progress reports (DPR),Block

    wise Reports, Over/Under InjectionReports.Power reports for Generation, Import and

    Export prepared for Daily/Monthly.

    Establish and maintain standard operating procedures(SOPs)for safe electrical

    operations.

    Familiar with ABB makeSCADAsystem for operation of 400 KV Switchyard (One and

    half breaker scheme).

    Co-ordination withSRLDCin matters relating to Daily Load schedule,

    Fault analysis and troubleshooting ofGCP, GRP, HT, and LT PANELS asper drawing.

    Knowledge in Plant hot & cold startup ofTurbine, Boiler and Balance of Plant.

    Monitoring the parameters of Turbine(Make- Nanjing Turbine)and Balance of Plant

    (MakeABB).In Control Room as an Engineer as well as in the field side.

    Monitoring Coal Handling Plant & Lime Stone Handling Plant and Ash Handling Plant

    Allen-Bradley PLC programming through HMI (Make- Rockwell Automation).

    Worked as anEngineer- Electrical (2x150MW, CFBC Boiler) inO&M Dept. inPOWER

    MECH PROJECTS LTD.,atMeenakshi Energy Power PlantNellore from April 2013 toSeptember 2015.

  • 7/26/2019 resume_956716_1448173040

    3/4

    PRAVEEN KUMAR ANANTARAPU

    Operating Coal Handling Plant & Lime Stone Handling Plant PLC programming

    through HMI in control room as a Engineer had worked inENCOTEC ENERGY PVT

    LTD.,for ONE Yearin MEPL Site.

    To co-ordinate with Electrical Contractor for Electrification, Execution, Erection 33/11Kv

    substation, connected 11kv lines, HT Switchgear as anEngineerhad worked inSree

    Lakshmi Constructionin MEPL Site.

    Lanco Power Plant on behalf of Inteq Automation Services, Vijayawada |EPC Site

    Graduate Engineer-ELECTRICAL June2010Nov 2011

    Lanco power plant stage III 2X371MW, Combined Cycle Power Plant, Erection and

    Commissioning is going on for stage III Gas Turbine and Steam Turbine.

    Had trained in plant operation in Gas turbine and HRSG for stage-III. In Projects, Erection & Commissioning, Cable tray installation, Cable lying, Junction Box

    installation, Control loop checking, Control Panel Installation (DCS, PLC).

    Trained on identification of P&ID instrumentation diagrams & Hook diagram

    Had trained on electrical switchgear panels, Current Transformer, Potential Transformer

    testing, Generator, Transformer and Motor testing.

    Study technical specifications and preparing comparative data sheets and measurement

    sheet and estimation for procurement of electrical testing equipment's.

    Skills

    Trained in Repair and Testing of Electrical Machines in VIZAG STEEL PLANT, in ERS

    Department.

    Had trained as aDesignated PersonforIssuing PermitsOrderfor the Maintenance dept.

    Had trained in Tata PowerFirst Aid Safety and 5S Safetycourses in power plant sector.

    Had trained in Tata PowerSkill Developmentcourses in power plant sector

    Knowledge inPLC, SCADA, SIMATIC S7-300/400 series, AUTOCAD.

    Education

    B. Tech in EEE from JNTU with an aggregate of 71% (2006-2010).

    Intermediate from Chaitanya Junior College with an aggregate of 92% (2004-2006).

    SSC from Krishnaveni Talent School with an aggregate of 83% (2003-2004).

    Personal Prole

    Name : A. Praveen Kumar

    Father Name : A. Venkateswara Rao

  • 7/26/2019 resume_956716_1448173040

    4/4

    PRAVEEN KUMAR ANANTARAPU

    Marital Status : Single

    Hobbies & Interest : Playing Games, yoga, Surfing Net.

    Address : D.no 36-90-24, Srinagar street, Kancharapalem,

    Visakhapatnam, Andhra Pradesh-530008.

    !eference

    1. A.Seshagiri Rao-Deputy General Manager Meenakshi Energy Pvt Ltd, Ph. no 9966702828

    2. T.Veeresh Prasad- Manager- Invensys India Private Ltd., Phone no.8846679197.

    3. T.Prasad Rao- Manager Tata Power., Phone no-9248089464.

    "eclaration

    I hereby declare that the above-mentioned information and particulars are

    true and correct to the best of my knowledge.

    Place# Nellore A.Praveen Kumar