5
CURRICULUM VITAE VAIBHAV G. PAYDELWAR Mobile: +91-9579110702, +91-7841825972 E-mail: [email protected] CAREER OBJECTIVE To accomplish the pinnacle of success and be placed in a commensurate position, where my erudite dexterity and technical acumen can be used to proliferate the accretion of name and fame of my company. PROFESSIONAL SUMMARY I Have Dynamic Experience of 4 years in Mechanical engineering Working in the areas of Boiler Pressure part, Boiler Structure including Primary and Secondary Structure, Coal Mill Maintenance, Boiler Maintenance, Axial Fan and Radial Fan Maintenance, Welding Inspection and Project Planning and Control. SCHOLASTICS MBA (Operation Management) from R.T.M. Nagpur University Pursuing B.E. (Mechanical ) from R.T.M. Nagpur University with 66.18% in 2011 H.S.S.C from SKP Junior College Maharashtra State Board with 57.50% in 2007 S.S.C from Maharashtra State Board with 63.33% in 2005 SOFTWARE SKILLS MS Office Microsoft Project 2007 Primavera P6 ORGANIZATIONAL EXPERIENCE Company Name : Encotec Energy (India) Pvt.Limited Designation : Senior Engineer Duration : Since 1 July 2015 till Present

Resume

Embed Size (px)

Citation preview

Page 1: Resume

CURRICULUM VITAE

VAIBHAV G. PAYDELWARMobile: +91-9579110702, +91-7841825972E-mail: [email protected]

CAREER OBJECTIVE

To accomplish the pinnacle of success and be placed in a commensurate position, where my erudite dexterity and technical acumen can be used to proliferate the accretion of name and fame of my company.

PROFESSIONAL SUMMARY

I Have Dynamic Experience of 4 years in Mechanical engineering Working in the areas of Boiler Pressure part, Boiler Structure including Primary and

Secondary Structure, Coal Mill Maintenance, Boiler Maintenance, Axial Fan and Radial Fan Maintenance, Welding Inspection and Project Planning and Control.

SCHOLASTICS

MBA (Operation Management) from R.T.M. Nagpur University Pursuing B.E. (Mechanical ) from R.T.M. Nagpur University with 66.18% in 2011 H.S.S.C from SKP Junior College Maharashtra State Board with 57.50% in 2007 S.S.C from Maharashtra State Board with 63.33% in 2005

SOFTWARE SKILLS

MS Office Microsoft Project 2007 Primavera P6

ORGANIZATIONAL EXPERIENCE

Company Name : Encotec Energy (India) Pvt.LimitedDesignation : Senior Engineer

Duration : Since 1 July 2015 till Present

Company Name : L&T Power Limited (TPPC)Designation : EngineerDuration : 9 Dec 2013 till 10 June 2015

Company Name : Sunil Hi-Tech Engineers LimitedDesignation : EngineerDuration : 4 Oct 2011- 20 July 2013

Page 2: Resume

LIST OF PROJECTS Vidharbha Industries Power Limited ( 2x 300 MW) Unit- 1 & 2 Mahagenco Koradi Thermal Power Expansion Project (3x 660 MW) for L&T MHI

Boilers Pvt. Limited Site Boiler Unit- 8, 9 & 10. Mahagenco Chandrapur Super Thermal Expansion Power Project (2 x 500 MW) for

BHEL Site Boiler Unit- 8 & 9.

PROJECT DETAILS

Company Name : Encotec Energy (India) Pvt.Limited Duration : 1 July 2015 till Present

Project : Vidharbha Industries Power Limited ( 2x300 MW)

Client : Reliance Power Limited Project Location : Butibori, Maharashtra

Roles & Responsibilities: Mainly associated with all the activities like Monthly PM, Running Defects and

Breakdowns of Coal Mill, Boiler & Associative Auxiliaries. Prior planning of Spares, Lubrication and Manpower. Providing day to day technical support for breakdown diagnostics & repair,

including risk and failure analysis and maintaining and repairing Mechanical equipments such as Pumps, Gearboxes and Valves

Plan & implement the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery. Conduct failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximize plant availability.

Responding immediately to machine breakdowns, fix faults on site, and arrange for replacement defected parts. Erection and commissioning of new machinery.

Overseeing inspection and maintenance programs, developing Detail Planning, Strategy, Schedules and Summary.

Allocate equipment; manage breakdowns, schedule & plan maintenance and coordination with other service departments. Perform productivity analysis & their financial impact calculation and implemented preventive measures.

Develop documents regarding Maintenance and various reports, checklist, production planning, trouble shooting and involved in Lean, 5s etc. related activities.

Company Name : L&T Power Limited (TPPC) Duration : 9 Dec 2013 to 10 June 2015

Page 3: Resume

Project : Koradi TPS Expansion Power Project (3x660 MW)Client : M/s Mahagenco, KoradiEPC Contractor : M/s L&T Power LimitedBoiler Contractor : M/s L&T MHI Boilers Pvt.LimitedProject Location : Koradi, Maharashtra Project Value : 325 Crores

Roles & Responsibilities :

Mechanical Project: Involved in Pre-assembly, erection, alignment, welding activity including the

inspection of Boiler pressure parts, Boiler Structure as per FQP. Accountable for reading all construction related drawing, explaining it to the

supervisors and solving any problems thereof. Key player in scheduling, planning and implementing preventive & defect

free practices to ensure smooth functioning of all equipments in the plant and played a key role in hydro-testing of 3 x 660MW boiler

Preparing punch points prior to Hydraulic test of Mechanical system

Planning & Monitoring: Creation of WBS (Work breakdown Structure) Tracking and monitoring of activities during the project execution stage and

updating the project schedule in Primavera/Excel/MSP Scenario highlighting of critical/near critical activities Comparison of current schedule with the baseline schedule Organizing and managing resources while creating estimates for the project,

work breakdown structure, project plan, contingency plan & schedules, identifying risks within defined scope, quality, time and cost constraints.

Development of Reports and Graphics: Calculating the actual project progress percentage achieved on a month to

month basis and comparing with planned project progress i.e. preparing the S-Curve

Periodic status report Project float management sheet Updated schedule Project analysis report

Company Name : Sunil Hi-Tech Engineers Limited Duration : 4 Oct 2011 to 20 July 2013

Page 4: Resume

Project : Chandrapur Expansion Power Project (2x500 MW)Client : M/s Mahagenco, ChandrapurEPC Contractor : M/s BHELProject Location : Chandrapur, Maharashtra Project Value : Rs 48 Crores

Roles & Responsibilities:

Managing day to day activities at site. Inspection and erection of Boiler pressure part, all vents and drain lines, Boiler

Auxillaries, valves related to hydro testing and attained the all punch points before hydro test.

Involved in air leak test, steam blowing and hydro-test of lines and valves. Responsible for making Daily Progress Report and submitting to Planning

Department Study of drawings and analyses work quantum Involved in inspection of Welding Quality of Boiler structure and ensure to

complete LPT (NDT) examination. Structuring detail budget for Mechanical project, planning schedule of activities,

mobilize resources - materials and manpower for successful execution. PERSONAL SINNIPTS

Father’s Name : Gulabrao Nathuji Paydelwar Working as Instructor in Govt. ITI KampteeDate of Birth : 30th June 1989Gender : MaleAddress : 262, Gurudeo Nagar, Nandanvan road,

Nandanvan dist- Nagpur, Maharashtra 440009Nationality : IndianMarital Status : SingleLanguage Known : English, Hindi, Marathi

DECLARATION

I hereby declare that the particulars in the curriculum vitae are true and correct to the Best of my knowledge and belief.

Place: NagpurDate: 24-10-2015 (Vaibhav Paydelwar)